# AEE: 10-K Risk Factor Changes 2026 vs 2025

> Source: U.S. Securities and Exchange Commission (EDGAR)  
> Generated: 2026-06-01  
> All data extracted directly from official filings. No hallucinated content.

## Summary

| Status | Count |
|--------|-------|
| New risks added | 1 |
| Risks removed | 0 |
| Risks modified | 7 |
| Unchanged | 12 |

---

## New in Current Filing: Realized energy demand from current and potential new customers may differ significantly from forecasts.

The Ameren Companies have historically experienced minimal growth in energy demand for the past two decades. However, current industry projections reflect the potential for significant growth in energy demand over the next decade, primarily arising from data centers and further augmented by onshoring and electrification of manufacturing and an increase in transportation electrification. In addition, in February 2026, Ameren Missouri executed electric service agreements with large load customers under its large load customer rate plan, representing 2.2 gigawatts of demand. The Ameren Companies may or may not experience the energy demand growth currently being forecasted depending on the decisions of potential new customers about whether to locate their operations within our service territories or whether customers that have signed electric service agreements begin operations within the expected timeframes. Also, demand growth may not be realized at the rate, or in the amount, expected if construction of customer facilities is not completed within expected timeframes, which is dependent on the ability of suppliers, contractors, and developers to meet contractual commitments and timely complete projects. In addition, expected demand growth may not be realized if emerging technologies are not broadly adopted at the rate expected, increased efficiencies in computing or other advances in these technologies reduce energy demand for data centers, or large load customers, such as data centers, 27 27 27 Table of Contents Table of Contents are not supported by local communities or do not receive necessary approvals by local municipalities. Although customers subject to the large load customer rate plan in Ameren Missouri's service territory are required to sign agreements for specific term lengths to reasonably ensure rates they are charged reflect a representative share of the costs incurred to serve them, these customers could terminate their agreements early or reduce minimum capacity levels. These agreements include exit fees for early termination and fees for capacity reductions, but these fees may not fully mitigate this risk. Although assets constructed or acquired to serve these customers will also be used to serve other Ameren Missouri customers, early termination or capacity reductions could impact Ameren Missouri's ability to fully recover its investment in, and return on, those assets. Also, the Ameren Companies may not be able to provide the necessary electric service, including both energy and capacity, within the time periods required by large load customers. The Ameren Companies may need to accelerate the addition of generation resources within current plans, obtain new generation resources, expand transmission or distribution facilities that are not currently within their plans, or purchase additional energy and capacity to meet the increase in demand. In addition, demand for construction services within the utility industry has increased significantly due to growing energy demand and energy transition, creating limited availability of suppliers, contractors, and developers, which could impact the Ameren Companies' ability to timely construct or acquire assets needed to meet forecasted demand. If the Ameren Companies are required to purchase energy and capacity to meet demand, their risk management and liquidity levels may not be effective at mitigating price impacts of such purchases, or there may not be sufficient energy and capacity available, either of which could negatively impact the Ameren Companies' ability to realize forecasted or other potential demand. The Ameren Companies may not be able to plan, receive regulatory approvals, and execute those plans in a timely manner, which could result in the Ameren Companies not realizing forecasted or other potential demand.

---

## Modified: We are subject to various environmental and permitting laws. Significant capital expenditures may be required to achieve and to maintain compliance with these environmental laws. Failure to comply with these laws could result in the closing of facilities, alterations to the manner in which these facilities operate, increased operating costs, delays and increased costs of building new facilities, and exposure to fines and liabilities.

**Key changes:**

- Reworded sentence: "Such environmental laws regulate air emissions; protect water bodies; regulate the handling and disposal of hazardous substances and waste materials; establish siting and land use requirements; and protect against ecological impacts."
- Reworded sentence: "Additionally, the use and handling of various chemicals and hazardous materials require release prevention plans and emergency response procedures."
- Reworded sentence: "Environmental regulations impact the electric utility industry, and compliance obligations could be costly for Ameren Missouri, which operates coal-fired and natural gas-fired energy centers."
- Reworded sentence: "Further reductions to emissions limits will become effective between 2030 and 2040, resulting in the possible closure of the Venice Energy Center by the end of 2029."
- Added sentence: "23 23 23 Table of Contents Table of Contents"

**Prior (2025):**

Our electric generation, transmission, and distribution and natural gas distribution and storage operations must comply with a variety of statutes and regulations relating to the protection of the environment and human health and safety, including permitting programs implemented by federal, state, and local authorities. Such environmental laws regulate air emissions; protect water bodies; manage the handling and disposal of hazardous substances and waste materials; siting and land use requirements; and potential ecological impacts. Complex and lengthy processes are required to obtain and renew approvals, permits, and licenses for new, existing, or modified energy-related facilities. Additionally, the use and handling of various chemicals or hazardous materials require release prevention plans and emergency response procedures. Further, we are subject to risks from changing or conflicting interpretations of existing laws, modifications to existing laws, new laws, new or modified permit terms, and enforcement of environmental laws and permits by federal, state, and local authorities. We are also subject to liability under environmental laws that address the remediation of environmental contamination on property currently or formerly owned by us or by our predecessors, as well as property contaminated by hazardous substances that we generated. Such properties include MGP sites, substations, and third-party sites, such as landfills. Additionally, individuals and non-governmental organizations may seek to enforce environmental laws against us, allege injury from exposure to hazardous materials, allege a failure to comply with environmental laws, seek to compel remediation of environmental contamination, or seek to recover damages resulting from purported contamination. Environmental regulations have a significant impact on the electric utility industry and compliance with these regulations could be costly for Ameren Missouri, which operates coal-fired and natural gas-fired energy centers. As of December 31, 2024, Ameren Missouri's coal-fired energy centers represented 6% and 11% of Ameren's and Ameren Missouri's rate base, respectively. Compliance obligations under the Clean Air Act include the NSPS, the MATS, emission allowance programs and the CSAPR, and the National Ambient Air Quality Standards, which are subject to periodic review for certain pollutants. Collectively, these regulations cover a variety of pollutants, such as SO2, particulate matter, NOx, mercury, toxic metals and acid gases, and CO2 emissions. Regulations implementing the Clean Water Act govern potential impacts from our operations on water bodies including wetlands subject to the Act, as well as evaluation of the ecological and biological impact of those operations. Implementation of the Clean Air Act and the Clean Water Act requirements typically occurs through the issuance of permits by state regulators or resource agencies, and capital expenditures associated with compliance could be significant. Coal-fired energy centers must comply with management and disposal requirements for coal ash under the Resource Conservation and Recovery Act and federal regulations known as the CCR Rule. Surface impoundments at Ameren Missouri's coal-fired energy centers are subject to closure and groundwater monitoring requirements and the implementations of corrective measures if necessary. The individual or combined effects of compliance with existing and new environmental regulations could result in significant capital expenditures, increased operating costs, or the closure or alteration of operations at some of Ameren Missouri's energy centers. In April 2024, the EPA issued a final rule that sets CO2 emission standards for existing coal-fired and new natural gas-fired power plants based on the emissions expected from adoption of carbon capture technology and/or natural gas co-firing for coal-fired power plants and 22 22 22 Table of Contents Table of Contents carbon capture technology for new natural gas-fired power plants. Affected power plants are required to comply with the rule through a phased-in approach or retire. Compliance with the new rule could be required as early as 2030 for certain existing coal-fired power plants and 2032 for certain new natural gas-fired power plants. In December 2024, the United States Court of Appeals for the District of Columbia Circuit heard arguments from various stakeholders including the EPA, environmental organizations, state attorney generals, and industry groups regarding the legal merits of the final rule. In February 2025, the EPA requested that the appellate court suspend the case for 60 days and not issue an opinion so the EPA can decide how to proceed. Ameren and Ameren Missouri estimate capital expenditures of approximately $580 million may be necessary to comply with the final rule assuming it is not revised or overturned. Ameren and Ameren Missouri are monitoring the legal challenges and assessing the impacts of the final rule and, at this time, cannot predict the final impacts on their results of operations, financial position, and liquidity. Currently as required by the CEJA, Ameren Missouri's natural gas-fired energy centers in Illinois are subject to annual limits on emissions, including CO2 and NOx. Further reductions to emissions limits will become effective between 2030 and 2040, resulting in the closure of the Venice Energy Center by the end of 2029. The reductions could also limit the operations of Ameren Missouri's four other natural gas-fired energy centers located in the state of Illinois, and will result in their closure by 2040. These energy centers are utilized to support peak loads. Subject to conditions in the CEJA, these energy centers may be allowed to exceed the emissions limits in order to maintain reliability of electric utility service. Ameren and Ameren Missouri have incurred, and expect to incur, significant costs with respect to environmental compliance and site remediation. New or revised environmental regulations, enforcement initiatives, or legislation could result in a significant increase in capital expenditures and operating costs, decreased revenues, penalties or fines, reduced operations or closure of some of Ameren Missouri's coal-and natural gas-fired energy centers, which, in turn, could lead to increased liquidity and financing needs, and higher financing costs. Actions required to ensure that Ameren Missouri's facilities and operations are in compliance with environmental laws could be prohibitively expensive for Ameren Missouri if the costs are not fully recovered through rates. Environmental laws could require Ameren Missouri to close or to alter significantly the operations of its energy centers. If Ameren Missouri requests recovery of capital expenditures and costs for environmental compliance through rates, the MoPSC could deny recovery of all or a portion of these costs, prevent timely recovery, or make changes to the regulatory framework in an effort to minimize rate volatility and customer rate increases. Capital expenditures and costs to comply with future legislation or regulations could result in Ameren Missouri closing coal-fired energy centers earlier than planned. If these costs are not recoverable through base rates or other regulatory mechanisms, it could lead to an impairment of assets and reduced revenues. Any of the foregoing could have an adverse effect on our results of operations, financial positions, and liquidity.

**Current (2026):**

Our electric generation, transmission, and distribution and natural gas distribution and storage operations must comply with a variety of statutes and regulations relating to the protection of the environment and human health and safety, including permitting programs implemented by federal, state, and local authorities. Such environmental laws regulate air emissions; protect water bodies; regulate the handling and disposal of hazardous substances and waste materials; establish siting and land use requirements; and protect against ecological impacts. Complex and lengthy processes are required to obtain and renew approvals, permits, and licenses for new, existing, or modified energy-related facilities. Additionally, the use and handling of various chemicals and hazardous materials require release prevention plans and emergency response procedures. Further, we are subject to risks from changing or conflicting interpretations of existing laws, modifications to existing laws, new laws, new or modified permit terms, and enforcement of environmental laws and permits by federal, state, and local authorities. We are also subject to liability under environmental laws that address the remediation of environmental contamination on property currently or formerly owned by us or by our predecessors, as well as property contaminated by hazardous substances that we generated. Such properties include MGP sites, substations, and third-party sites, such as landfills. Additionally, individuals and non-governmental organizations may seek to enforce environmental laws against us, allege injury from exposure to hazardous materials, allege a failure to comply with environmental laws, seek to compel remediation of environmental contamination, or seek to recover damages resulting from purported contamination. Environmental regulations impact the electric utility industry, and compliance obligations could be costly for Ameren Missouri, which operates coal-fired and natural gas-fired energy centers. As of December 31, 2025, Ameren Missouri's coal-fired energy centers represented 5% and 11% of Ameren's and Ameren Missouri's rate base, respectively. Compliance obligations under the Clean Air Act stem from a variety of programs including the NSPS, the MATS, emission allowance programs, the CSAPR, and the National Ambient Air Quality Standards, which are subject to periodic review for certain pollutants. Collectively, these regulations cover a variety of pollutants, such as SO2, particulate matter, NOx, mercury, toxic metals and acid gases, and CO2 emissions, although the scope of covered pollutants can change. To the extent our operations impact surface water bodies, including wetlands, the Clean Water Act requires permitting as well as evaluation of the ecological and biological impact of those operations. Implementation of requirements under the Clean Air Act and the Clean Water Act typically occurs through the issuance of permits by state regulators or resource agencies, and capital expenditures associated with compliance could be significant. The management and disposal of coal ash from our coal-fired energy centers must comply with federal regulations known as the CCR Rule issued under the Resource Conservation and Recovery Act and require the closure of surface impoundments at our coal-fired energy centers along with groundwater monitoring requirements and the implementations of corrective measures if necessary. The combined effects of compliance with existing and future environmental regulations could result in significant capital expenditures, increased operating costs, and the potential for closure or alteration of operations at some of Ameren Missouri's energy centers. Currently as required by the CEJA, Ameren Missouri's natural gas-fired energy centers in Illinois are subject to annual limits on emissions, including CO2 and NOx. Further reductions to emissions limits will become effective between 2030 and 2040, resulting in the possible closure of the Venice Energy Center by the end of 2029. The reductions could also limit the operations of Ameren Missouri's four other natural gas-fired energy centers located in the state of Illinois and will result in their closure by 2040. These energy centers are utilized to support peak loads. Subject to conditions in the CEJA, these energy centers may be allowed to exceed the emissions limits in order to maintain reliability of electric utility service. Ameren and Ameren Missouri have incurred, and expect to incur, significant costs with respect to environmental compliance and site remediation. New or revised environmental regulations, enforcement initiatives, or legislation could result in a significant increase in capital expenditures and operating costs, decreased revenues, penalties or fines, reduced operations or closure of some of Ameren Missouri's coal-and natural gas-fired energy centers, which, in turn, could lead to increased liquidity and financing needs, and higher financing costs. Actions required to ensure that Ameren Missouri's facilities and operations are in compliance with environmental laws could be prohibitively expensive for Ameren Missouri if the costs are not fully recovered through rates. Environmental laws could require Ameren Missouri to close or to alter significantly the operations of its energy centers. If Ameren Missouri requests recovery of capital expenditures and costs for environmental compliance through rates, the MoPSC could deny recovery of all or a portion of these costs, prevent timely recovery, or make changes to the regulatory framework in an effort to minimize rate volatility and customer rate increases. Capital expenditures and costs to comply with future legislation or regulations could result in Ameren Missouri closing coal-fired energy centers earlier than planned. If these costs are not recoverable through base rates or other regulatory mechanisms, it could lead to an impairment of assets and reduced revenues. Any of the foregoing could have an adverse effect on our results of operations, financial positions, and liquidity. 23 23 23 Table of Contents Table of Contents

---

## Modified: The construction and acquisition of, and capital improvements to, electric and natural gas utility infrastructure, along with Ameren Missouri's ability to implement its Smart Energy Plan and its 2025 Change to the 2023 PRP, involve substantial risks.

**Key changes:**

- Reworded sentence: "We estimate that we will invest up to $33.1 billion (Ameren Missouri - up to $22.2 billion; Ameren Illinois - up to $8.3 billion; ATXI - up to $2.6 billion) of capital expenditures from 2026 through 2030."
- Reworded sentence: "These factors include, but are not limited to, the following: project management expertise; the ability of suppliers, contractors, and developers to meet contractual commitments and timely complete projects, which is dependent upon the availability of necessary labor, materials, and equipment; escalating costs, including but not limited to changes to tariffs on materials or government actions; changes in the scope and timing of projects; the ability to obtain required regulatory, project, and permit approvals; the ability to obtain necessary rights-of-way, easements, and transmission connection agreements at an acceptable cost in a timely fashion; unsatisfactory performance by the projects when completed; the ability to raise capital on reasonable terms; geopolitical conflict and other events beyond our control, including delays arising from government shutdowns or construction delays due to weather."

**Prior (2025):**

We expect to make significant capital expenditures to maintain and improve our electric and natural gas utility infrastructure and to comply with existing environmental regulations. We estimate that we will invest up to $27.4 billion (Ameren Missouri - up to $17.5 billion; Ameren Illinois - up to $7.0 billion; ATXI - up to $2.9 billion) of capital expenditures from 2025 through 2029. For additional information on these estimates, see Liquidity and Capital Resources - Capital Expenditures in Management's Discussion and Analysis of Financial Condition and Results of Operations under Part II, Item 7, of this report. Investments in Ameren's rate-regulated operations are expected to be recoverable from customers, but they are subject to prudence reviews and are exposed to regulatory lag of varying degrees by jurisdiction. Our ability to complete construction projects successfully within projected estimates, including schedule, performance, and/or cost, and to implement Ameren Missouri's Smart Energy Plan, which may include acquisition of generation facilities after they are constructed, is contingent upon many factors and subject to substantial risks. These factors include, but are not limited to, the following: project management expertise; the ability of suppliers, contractors, and developers to meet contractual commitments and timely complete projects, which is dependent upon the availability of necessary labor, materials, and equipment; escalating costs, including but not limited to changes to tariffs on materials or government actions; changes in the scope and timing of projects; the ability to obtain required regulatory, project, and permit approvals; the ability to obtain necessary rights-of-way, easements, and transmission connection agreements at an acceptable cost in a timely fashion; unsatisfactory performance by the projects when completed; the inability to earn an adequate return on invested capital; the ability to raise capital on reasonable terms; geopolitical conflict and other events beyond our control, including delays arising from government shutdowns or construction delays due to weather. 24 24 24 Table of Contents Table of Contents With respect to the transition of Ameren Missouri's generation fleet that will be included in its 2025 Change to the 2023 PRP and carbon emission reduction targets, factors also include Ameren Missouri's ability to obtain CCNs from the MoPSC, and any other required approvals for the addition of renewable resources, battery storage, or nuclear or natural gas-fired generation, retirement of energy centers, and new or continued customer energy-efficiency programs; the ability to enter into agreements for renewable, natural gas-fired, or nuclear generation and acquire or construct that generation at a reasonable cost; the ability to obtain NRC approval for an extension of the operating license for the Callaway Energy Center beyond its current 2044 expiration date; the continued existence and ability to qualify for, and use or transfer, federal production or investment tax credits; the cost of wind, solar, and other renewable generation and battery storage technologies; the cost of natural gas or hydrogen CT technologies; the cost of nuclear generation; the ability to maintain system reliability during and after the transition to clean energy generation; new and/or changes in environmental regulations, including those related to CO2 and other greenhouse gas emissions; energy prices; and demand. Any of these risks could result in higher costs, the inability to complete anticipated projects, or facility closures, and could adversely affect our results of operations, financial position, and liquidity.

**Current (2026):**

We expect to make significant capital expenditures to maintain and improve our electric and natural gas utility infrastructure and to comply with existing environmental regulations. We estimate that we will invest up to $33.1 billion (Ameren Missouri - up to $22.2 billion; Ameren Illinois - up to $8.3 billion; ATXI - up to $2.6 billion) of capital expenditures from 2026 through 2030. For additional information on these estimates, see Liquidity and Capital Resources - Capital Expenditures in Management's Discussion and Analysis of Financial Condition and Results of Operations under Part II, Item 7, of this report. Investments in Ameren's rate-regulated operations are expected to be recoverable from customers, but they are subject to prudence reviews and are exposed to regulatory lag of varying degrees by jurisdiction. Our ability to complete construction projects successfully within projected estimates, including schedule, performance, and/or cost, and to implement Ameren Missouri's Smart Energy Plan, which may include acquisition of generation facilities after they are constructed, is contingent upon many factors and subject to substantial risks. These factors include, but are not limited to, the following: project management expertise; the ability of suppliers, contractors, and developers to meet contractual commitments and timely complete projects, which is dependent upon the availability of necessary labor, materials, and equipment; escalating costs, including but not limited to changes to tariffs on materials or government actions; changes in the scope and timing of projects; the ability to obtain required regulatory, project, and permit approvals; the ability to obtain necessary rights-of-way, easements, and transmission connection agreements at an acceptable cost in a timely fashion; unsatisfactory performance by the projects when completed; the ability to raise capital on reasonable terms; geopolitical conflict and other events beyond our control, including delays arising from government shutdowns or construction delays due to weather. With respect to the transition of Ameren Missouri's generation fleet included in its 2025 Change to the 2023 PRP and carbon emission reduction targets, factors also include Ameren Missouri's ability to obtain CCNs from the MoPSC, and any other required state or federal approvals for the addition of renewable resources, battery storage, or nuclear or natural gas-fired generation, retirement of energy centers, and new or continued customer energy-efficiency programs; the ability to enter into agreements for renewable, natural gas-fired, or nuclear generation or battery storage and acquire or construct those resources at a reasonable cost; the ability to enter into natural gas supply agreements at reasonable prices and adequate quantities to power Ameren Missouri's natural gas-fired energy centers; the ability to obtain NRC approval for an extension of the operating license for the Callaway Energy Center beyond its current 2044 expiration date; the continued existence and ability to qualify for, and use or transfer, federal production or investment tax credits; the ability to maintain system reliability; new and/or changes in environmental regulations, including those related to CO2 and other greenhouse gas emissions; energy prices; and demand. Also, changes to capacity accreditation rules adopted by the MISO could reduce the accredited capacity of renewable generation and battery storage and increase regional capacity prices, potentially requiring additional investment and higher costs to satisfy resource adequacy requirements. In addition, the presidential administration has issued executive orders and taken other actions to increase investment in fossil fuel infrastructure. This change in federal domestic energy policy has created uncertainty regarding the role existing renewable generation will play in supporting the United States' energy grid and the timing and extent of future renewable generation infrastructure development. Ameren Missouri's plan could be affected by this change in energy policy. Any of these risks could result in higher costs, the inability to complete anticipated projects, or facility closures, and could adversely affect our results of operations, financial position, and liquidity.

---

## Modified: We are subject to business and financial risks related to the impact of climate-related legislation, regulation, and emission reduction initiatives.

**Key changes:**

- Reworded sentence: "There is concern and activism among various external stakeholders, both nationally and internationally, about climate-related risks, including public concerns about the potential environmental impacts from the combustion of fossil fuels, as well as pressure from public interest groups regarding limiting the use of natural gas."
- Reworded sentence: "Further, federal, state, and local authorities have considered initiatives to further restrict greenhouse gases to address global climate-related risks."
- Reworded sentence: "The United States withdrew from the Paris Agreement and the United Nations Framework Convention on Climate Change in January 2025 and 2026, respectively."
- Reworded sentence: "Excessive costs to comply with future legislation or regulations related to climate-related risks might force Ameren Missouri to close its remaining coal-fired energy centers earlier than planned, which could lead to possible loss on abandonment and reduced revenues."
- Reworded sentence: "Ameren is targeting net-zero carbon emissions by 2045, as well as a 60% reduction by 2030 and an 85% reduction by 2040 based on 2005 levels in a safe, reliable, and affordable manner."

**Prior (2025):**

There is concern and activism among various external stakeholders, both nationally and internationally, about climate change, including public concerns about the potential environmental impacts from the combustion of fossil fuels, as well as pressure from public interest groups regarding limiting the use of natural gas. Also, state and local authorities have proposed restrictions on the use of natural gas, and the ICC is conducting a future of gas proceeding to explore issues involved with decarbonization of the natural gas distribution system in the state of Illinois. Further, federal, state, and local authorities, including the United States Congress, have considered initiatives to further restrict greenhouse gases to address global climate change, and the EPA previously announced plans to implement new climate change programs, including regulation of greenhouse gas emissions from the utility industry. Additionally, international agreements have in the past, and could again, lead to future federal or state legislation or regulations. In 2015, the United Nations Framework Convention on Climate Change reached consensus among approximately 190 nations on an agreement, known as the Paris Agreement, that establishes a framework for greenhouse gas mitigation actions by all countries, with a goal of holding the increase in global average temperature to below 2 degrees Celsius above pre-industrial levels and an aspiration to limit the increase to 1.5 degrees Celsius. In accordance with the new presidential administration's approach to United States energy policy, in January 2025, the United States withdrew from the Paris Agreement. The current federal administration is expected to review, and has already revised, compliance requirements under a number of federal environmental regulatory programs; however, differences in energy policy priorities adopted by future federal administrations could result in additional greenhouse gas reduction requirements in the United States. As a result of our diverse fuel portfolio, our emissions of greenhouse gases vary among our energy centers, but coal-fired power plants are significant sources of CO2 emissions. Future federal and state legislation or regulations that mandate limits on the emission of, or impose taxation on, greenhouse gases could result in a significant increase in capital expenditures and operating costs, decreased revenues, penalties or fines, or reduced operations of some of Ameren Missouri's coal- and natural gas-fired energy centers, which, in turn, could lead to increased liquidity and financing needs, and higher financing costs. Moreover, to the extent Ameren Missouri requests recovery of these costs through rates, its regulators might deny some or all of, or defer timely recovery of, these costs. Excessive costs to comply with future legislation or regulations related to climate change might force Ameren Missouri to close its remaining coal-fired energy centers earlier than planned, which could lead to possible loss on abandonment and reduced revenues. As a result, mandatory limits could have a material adverse impact on Ameren's and Ameren Missouri's results of operations, financial position, and liquidity. 23 23 23 Table of Contents Table of Contents Ameren is targeting net-zero carbon emissions by 2045, as well as a 60% reduction by 2030 and an 85% reduction by 2040 based on 2005 levels in a safe, reliable, and affordable manner. Ameren's goals include both reduction of direct emissions from operations (scope 1), as well as electricity usage at Ameren buildings (scope 2), including other greenhouse gas emissions of methane, nitrous oxide, and sulfur hexafluoride. Achievement of these targets is dependent on many factors, including the pace and extent of development and deployment of low- to zero-carbon energy technologies and carbon capture technologies, the cost of those technologies, and support of such technologies by regulators; natural gas prices; new transmission infrastructure; the ability to maintain system reliability during and after the transition to clean energy generation; and constructive energy and economic policies, including those that address investment in energy infrastructure, global climate change, incentives for clean energy technologies, and environmental regulations. Additional factors associated with operational risks for the construction and acquisition of electric and natural gas infrastructure may also affect the achievement of these goals, as further discussed below. The strategy to achieve these goals also relies on continuing to pursue a diverse portfolio, including low-carbon and carbon-free resources and energy-efficiency resources; continuing to participate in efforts to help advance the development of technologies such as carbon capture and sequestration; the use of hydrogen fuel for electric production and energy storage, next generation nuclear, and large-scale long-cycle battery energy storage; and constructively engaging with legislators, regulators, investors, customers, and other stakeholders to support outcomes leading to a net-zero future.

**Current (2026):**

There is concern and activism among various external stakeholders, both nationally and internationally, about climate-related risks, including public concerns about the potential environmental impacts from the combustion of fossil fuels, as well as pressure from public interest groups regarding limiting the use of natural gas. Also, state and local authorities have proposed restrictions on the use of natural gas, and the ICC is conducting a future of gas proceeding to explore issues involved with decarbonization of the natural gas distribution system in the state of Illinois. Further, federal, state, and local authorities have considered initiatives to further restrict greenhouse gases to address global climate-related risks. Additionally, international agreements have in the past, and could again, lead to future federal or state legislation or regulations. In 2015, the United Nations Framework Convention on Climate Change reached consensus among approximately 190 nations on an agreement, known as the Paris Agreement, that establishes a framework for greenhouse gas mitigation actions by all countries, with a goal of holding the increase in global average temperature to below 2 degrees Celsius above pre-industrial levels and an aspiration to limit the increase to 1.5 degrees Celsius. The United States withdrew from the Paris Agreement and the United Nations Framework Convention on Climate Change in January 2025 and 2026, respectively. The EPA has revised, and has proposed revisions to, compliance requirements under a number of federal environmental regulatory programs related to greenhouse gases; however, differences in energy policy priorities adopted by future presidential administrations could result in additional greenhouse gas reduction requirements in the United States. As a result of our diverse fuel portfolio, our emissions of greenhouse gases vary among our energy centers, but coal-fired power plants are significant sources of CO2 emissions. Future federal and state legislation or regulations that mandate limits on the emission of, or impose taxation on, greenhouse gases could result in a significant increase in capital expenditures and operating costs, decreased revenues, penalties or fines, or reduced operations of some of Ameren Missouri's coal- and natural gas-fired energy centers, which, in turn, could lead to increased liquidity and financing needs, and higher financing costs. Moreover, to the extent Ameren Missouri requests recovery of these costs through rates, its regulators might deny some or all of, or defer timely recovery of, these costs. Excessive costs to comply with future legislation or regulations related to climate-related risks might force Ameren Missouri to close its remaining coal-fired energy centers earlier than planned, which could lead to possible loss on abandonment and reduced revenues. As a result, mandatory limits could have a material adverse impact on Ameren's and Ameren Missouri's results of operations, financial position, and liquidity. Ameren is targeting net-zero carbon emissions by 2045, as well as a 60% reduction by 2030 and an 85% reduction by 2040 based on 2005 levels in a safe, reliable, and affordable manner. Ameren's goals include both reduction of direct emissions from operations (scope 1), as well as electricity usage at Ameren buildings (scope 2), including other greenhouse gas emissions of methane, nitrous oxide, and sulfur hexafluoride. Achievement of these targets is dependent on many factors, including the pace and extent of development and deployment of low- to zero-carbon energy technologies and carbon capture technologies, the cost of those technologies, and support of such technologies by regulators; natural gas and energy prices; operational performance of low- to zero-carbon resources; new transmission infrastructure; the ability to maintain system reliability; customer demand for energy including carbon-free energy; and constructive energy and economic policies, including those that address investment in energy infrastructure, global climate-related risks, incentives for clean energy technologies, and environmental regulations. Additional factors associated with operational risks for the construction and acquisition of electric and natural gas infrastructure may also affect the achievement of these goals, as further discussed below. The strategy to achieve these goals also relies on continuing to pursue a diverse portfolio, including low-carbon and carbon-free resources and energy-efficiency resources, while still meeting load growth opportunities; continuing to participate in efforts to help advance the development of technologies such as carbon capture and sequestration; the use of hydrogen fuel for electric production and energy storage, next generation nuclear, and large-scale long-cycle battery storage; and constructively engaging with legislators, regulators, investors, customers, and other stakeholders to support outcomes leading to a net-zero future.

---

## Modified: We are subject to employee workforce factors that could adversely affect our operations.

**Key changes:**

- Reworded sentence: "As of December 31, 2025, approximately 22% of Ameren's, Ameren Missouri's, and Ameren Illinois' total employees were 55 years old or older."

**Prior (2025):**

Our businesses depend upon our ability to employ and retain key officers and other skilled professional and technical employees. Certain specialized knowledge that focuses on skilled-craft and STEM-related disciplines is required to construct and operate generation, transmission, and distribution assets. Further, a significant portion of our work force is nearing retirement. As of December 31, 2024, approximately 23% of Ameren's, Ameren Missouri's, and Ameren Illinois' total employees were 55 years old or older. We are also party to collective bargaining agreements that collectively represent about 46%, 59%, and 55% of Ameren's, Ameren Missouri's and Ameren Illinois' total employees, respectively. The Ameren Missouri collective bargaining unit contracts expire in 2025 and 2026, and cover 4% and 96% of represented employees, respectively. The Ameren Illinois collective bargaining unit contracts expire in 2026 and 2027, and cover 92% and 8% of represented employees, respectively. Certain events, such as significant delays in finding appropriate replacement talent, inadequately trained replacement employees, a mismatch of skill sets to future needs, or any work stoppage experienced in connection with negotiations of collective bargaining agreements could adversely affect our operations.

**Current (2026):**

Our businesses depend upon our ability to employ and retain key officers and other skilled professional and technical employees. Certain specialized knowledge that focuses on skilled-craft and STEM-related disciplines is required to construct and operate generation, transmission, and distribution assets. Further, a significant portion of our work force is nearing retirement. As of December 31, 2025, approximately 22% of Ameren's, Ameren Missouri's, and Ameren Illinois' total employees were 55 years old or older. We are also party to collective bargaining agreements that collectively represent about 46%, 58%, and 54% of Ameren's, Ameren Missouri's and Ameren Illinois' total employees, respectively. The Ameren Missouri collective bargaining unit contracts expire in 2026 and 2028, and cover 96% and 4% of represented employees, respectively. The Ameren Illinois collective bargaining unit contracts expire in 2027 and 2029, and cover 8% and 92% of represented employees, respectively. Ameren Missouri and Ameren Illinois expect to renew these contracts prior to their expiration, however there can be no guarantee that such renewals will be secured on favorable terms. Certain events, such as significant delays in finding appropriate replacement talent, inadequately trained replacement employees, a mismatch of skill sets to future needs, or any work stoppage experienced in connection with negotiations of collective bargaining agreements could adversely affect our operations.

---

## Modified: The electric and natural gas rates that we are allowed to charge are determined through regulatory proceedings, which are subject to intervention and appeal. Rates are also subject to legislative actions, which are largely outside of our control. Certain events could prevent us from recovering our costs in a timely manner or at all, or from earning adequate returns on our investments.

**Key changes:**

- Reworded sentence: "Rate orders are also subject to appeal, which creates additional uncertainty as to the rates that we will ultimately be allowed to 21 21 21 Table of Contents Table of Contents charge for our services."
- Reworded sentence: "Ameren Missouri's electric and natural gas utility rates and Ameren Illinois' natural gas utility rates are typically established in regulatory proceedings that take up to 11 months to complete."
- Added sentence: "Pursuant to the PPRA, Ameren Missouri's natural gas utility rates established in proceedings filed after June 2026 will be allowed to be based on future costs, revenues, and sales volumes, subject to MoPSC approval."
- Reworded sentence: "Ameren Missouri and Ameren Illinois, and the utility industry generally, have experienced higher maintenance costs and capital expenditures to operate their electric, natural gas, and transmission businesses, which has led to increases in customer rates and the related revenue requirements needed to recover such costs and earn a return on investments."
- Removed sentence: "In addition, in June 2024, the MoPSC issued a financing order authorizing the issuance of securitized utility tariff bonds by a wholly owned, special purpose subsidiary of Ameren Missouri to finance approximately $476 million of costs related to the accelerated retirement of the Rush Island Energy Center, which included the remaining unrecovered net plant balance associated with the facility, among other costs."

**Prior (2025):**

The rates that we are allowed to charge for our utility services significantly influence our results of operations, financial position, and liquidity. The electric and natural gas utility industry is highly regulated. The utility rates charged to customers are determined by governmental entities, including the MoPSC, the ICC, and the FERC. Decisions by these entities are influenced by many factors, including the cost of providing service, the prudency of expenditures, the quality of service, regulatory staff knowledge and experience, customer intervention, and economic conditions, as well as social and political views. Decisions made by these governmental entities regarding customer rates are largely outside of our control. We are exposed to regulatory lag, including the impact of inflationary pressures, and cost disallowances to varying degrees by jurisdiction, which, if unmitigated, could adversely affect our results of operations, financial position, and liquidity. Rate orders are also subject to appeal, which creates additional uncertainty as to the rates that we will ultimately be allowed to charge for our services. From time to time, our regulators may approve riders or other recovery mechanisms that allow electric or natural gas rates to be adjusted without a traditional regulatory rate review. These mechanisms could be changed or terminated. 20 20 20 Table of Contents Table of Contents Ameren Missouri's electric and natural gas utility rates and Ameren Illinois' natural gas utility rates are typically established in regulatory proceedings that take up to 11 months to complete. Ameren Missouri's electric and natural gas utility rates established in those proceedings are based on historical costs, revenues, and sales volumes. Ameren Illinois' natural gas rates established in those proceedings are based on estimated future costs, revenues, and sales volumes. Effective for rates in 2024 through at least 2027, Ameren Illinois' electric distribution rates have been established through an MYRP as discussed in the following risk factor. An MYRP includes a revenue requirement reconciliation, which may not allow for full recovery of actual costs due to a reconciliation cap. Thus, the rates that we are allowed to charge for utility services may not match our actual costs at any given time. Rates include an allowed return on investments established by the regulator, including a return at the applicable WACC on rate base, and an amount for income taxes based on the currently applicable statutory income tax rates and amortization associated with excess deferred income taxes. Although rate regulation is premised on providing an opportunity to earn a reasonable rate of return on rate base, there can be no assurance that the regulator will determine that our costs were prudently incurred or that the regulatory process will result in rates that will produce full recovery of such costs or provide for an opportunity to earn a reasonable return on those investments. Ameren Missouri and Ameren Illinois, and the utility industry generally, have an increased need for cost recovery and to earn a return on investments, primarily driven by capital investments, which is likely to continue in the future. The resulting increase to the revenue requirement needed to recover such costs and earn a return on investments could result in more frequent regulatory rate reviews and requests for cost recovery mechanisms. Additionally, increasing rates could result in regulatory or legislative actions, as well as competitive or political pressures, all of which could adversely affect our results of operations, financial position, and liquidity. In addition, in June 2024, the MoPSC issued a financing order authorizing the issuance of securitized utility tariff bonds by a wholly owned, special purpose subsidiary of Ameren Missouri to finance approximately $476 million of costs related to the accelerated retirement of the Rush Island Energy Center, which included the remaining unrecovered net plant balance associated with the facility, among other costs. Ameren Missouri will collect the amounts necessary to repay the bonds over approximately 15 years from the date of bond issuance. The securitized tariff bonds were issued in December 2024. The financing order also included a determination that the decision to retire the Rush Island Energy Center was reasonable and prudent. The MoPSC did not make a determination regarding the prudency of Ameren Missouri's prior actions that resulted in the adverse ruling in the NSR and Clean Air Act litigation discussed in Note 14 - Commitments and Contingencies under Part II, Item 8, of this report, however, claims regarding such actions could be considered in future regulatory proceedings. If future regulatory proceedings result in revenue reductions based on Ameren Missouri's prior actions that resulted in the adverse ruling in the NSR and Clean Air Act litigation, it could have a material adverse effect on the results of operations, financial position, and liquidity of Ameren and Ameren Missouri.

**Current (2026):**

The rates that we are allowed to charge for our utility services significantly influence our results of operations, financial position, and liquidity. The electric and natural gas utility industry is highly regulated. The utility rates charged to customers are determined by governmental entities, including the MoPSC, the ICC, and the FERC. Decisions by these entities are influenced by many factors, including the cost of providing service, the prudency of expenditures, the quality of service, regulatory staff knowledge and experience, customer intervention, and economic conditions, as well as social and political views. Decisions made by these governmental entities regarding customer rates are largely outside of our control. We are exposed to regulatory lag, including the impact of inflationary pressures, and cost disallowances to varying degrees by jurisdiction, which, if unmitigated, could adversely affect our results of operations, financial position, and liquidity. Rate orders are also subject to appeal, which creates additional uncertainty as to the rates that we will ultimately be allowed to 21 21 21 Table of Contents Table of Contents charge for our services. From time to time, our regulators may approve riders or other recovery mechanisms that allow electric or natural gas rates to be adjusted without a traditional regulatory rate review. These mechanisms could be changed or terminated. Ameren Missouri's electric and natural gas utility rates and Ameren Illinois' natural gas utility rates are typically established in regulatory proceedings that take up to 11 months to complete. Ameren Missouri's electric and natural gas utility rates established in those proceedings are based on historical costs, revenues, and sales volumes. Pursuant to the PPRA, Ameren Missouri's natural gas utility rates established in proceedings filed after June 2026 will be allowed to be based on future costs, revenues, and sales volumes, subject to MoPSC approval. Ameren Illinois' natural gas rates established in those proceedings are based on estimated future costs, revenues, and sales volumes. Effective for rates in 2024 through at least 2027, Ameren Illinois' electric distribution rates have been established through an MYRP as discussed in the following risk factor. An MYRP includes a revenue requirement reconciliation, which may not allow for full recovery of actual costs due to a reconciliation cap. Thus, the rates that we are allowed to charge for utility services may not match our actual costs at any given time. Rates include an allowed return on investments established by the regulator, including a return at the applicable WACC on rate base, and an amount for income taxes based on the currently applicable statutory income tax rates and amortization associated with excess deferred income taxes. Although rate regulation is premised on providing an opportunity to earn a reasonable rate of return on rate base, there can be no assurance that the regulator will determine that our costs were prudently incurred or that the regulatory process will result in rates that will produce full recovery of such costs or provide for an opportunity to earn a reasonable return on those investments. Ameren Missouri and Ameren Illinois, and the utility industry generally, have experienced higher maintenance costs and capital expenditures to operate their electric, natural gas, and transmission businesses, which has led to increases in customer rates and the related revenue requirements needed to recover such costs and earn a return on investments. This could result in more frequent regulatory rate reviews and requests for cost recovery mechanisms. Additionally, increasing rates could result in regulatory or legislative actions, as well as competitive or political pressures, all of which could adversely affect our results of operations, financial position, and liquidity.

---

## Modified: Beginning in 2024 through at least 2027, electric distribution rates for Ameren Illinois are established through an MYRP, which are subject to ongoing regulatory and judicial proceedings and associated risks, and are subject to a reconciliation cap.

**Key changes:**

- Reworded sentence: "Pursuant to the CEJA, Ameren Illinois has the option to establish electric distribution rates through an MYRP or a traditional regulatory rate review."
- Removed sentence: "Ameren Illinois' electric distribution service business is also subject to performance metrics."
- Removed sentence: "Failure to achieve the metrics would result in a reduction in the company's allowed ROE calculated under the MYRP."
- Removed sentence: "In 2022, the ICC issued an order approving total ROE incentives and penalties of 24 basis points under the MYRP, allocated among seven performance metrics."
- Removed sentence: "These performance metrics include improvements in service reliability in both the frequency and duration of outages, a reduction in peak loads, an increased percentage of 21 21 21 Table of Contents Table of Contents spend with diverse suppliers, a reduction in disconnections for certain customers, and improved timeliness in response to customer requests for interconnection of distributed energy resources."

**Prior (2025):**

The CEJA resulted in changes to the regulatory framework applicable to Ameren Illinois' electric distribution business by giving Ameren Illinois the option to file an MYRP with the ICC or establish rates through a traditional regulatory rate review, among other things. An MYRP establishes rates for a four-year period, and Ameren Illinois has the option to file for an MYRP every four years. Ameren Illinois elected to file an MYRP for rates effective in 2024 through 2027. Under the MYRP, Ameren Illinois is allowed to reconcile its actual electric distribution revenue requirement, as adjusted for certain cost variations, to the ICC-approved revenue requirement on an annual basis, subject to a reconciliation cap. The reconciliation cap limits the annual adjustment to 105% of the annual revenue requirement approved by the ICC. Certain variations from forecasted costs are excluded from the reconciliation cap, including those associated with major storms; new business and facility relocations; changes in the timing of certain expenditures or investments into or out of the applicable calendar year; and changes in interest rates, income taxes, taxes other than income taxes, pension and other post-retirement benefits costs, and amortization of certain assets. The reconciliation cap also excludes costs recovered outside of base rates through riders. The actual revenue requirement for a particular year incorporates Ameren Illinois' year-end rate base and actual capital structure for such year, provided that the resulting revenue requirement does not exceed the 105% reconciliation cap and the common equity ratio in such capital structure may not exceed that approved by the ICC in the MYRP. Ameren Illinois' existing riders continue to be effective under the MYRP. In addition, the ICC determines the ROE applicable to each year of the four-year period. Economic conditions could result in the annual predetermined ROE becoming inadequate over the four-year period. Ameren Illinois has filed an appeal of the ICC-determined ROE for 2024 through 2027 to the Illinois Appellate Court for the Fifth Judicial District. For additional information on the appeal see Note 2 - Rate and Regulatory Matters under Part II, Item 8, of this report. Failure to limit capital expenditures and operation and maintenance expenses to amounts that maintain revenue requirements under the reconciliation cap limit would adversely affect Ameren's and Ameren Illinois' results of operations, financial position, and liquidity. Ameren Illinois' electric distribution service business is also subject to performance metrics. Failure to achieve the metrics would result in a reduction in the company's allowed ROE calculated under the MYRP. In 2022, the ICC issued an order approving total ROE incentives and penalties of 24 basis points under the MYRP, allocated among seven performance metrics. These performance metrics include improvements in service reliability in both the frequency and duration of outages, a reduction in peak loads, an increased percentage of 21 21 21 Table of Contents Table of Contents spend with diverse suppliers, a reduction in disconnections for certain customers, and improved timeliness in response to customer requests for interconnection of distributed energy resources. These performance metrics apply annually from 2024 through 2027 under the MYRP, and the impact of any incentives and penalties will be excluded from the reconciliation cap described above. In addition, the allowed ROE on energy-efficiency investments can be increased or decreased up to 200 basis points, depending on the achievement of annual energy savings goals. Any adjustments to the allowed ROE for energy-efficiency investments will depend on annual performance for a historical period relative to energy savings goals.

**Current (2026):**

Pursuant to the CEJA, Ameren Illinois has the option to establish electric distribution rates through an MYRP or a traditional regulatory rate review. An MYRP establishes rates for a four-year period, and Ameren Illinois has the option to file for an MYRP every four years. Ameren Illinois elected to file an MYRP for rates effective in 2024 through 2027. Under the MYRP, Ameren Illinois is allowed to reconcile its actual electric distribution revenue requirement, as adjusted for certain cost variations, to the ICC-approved revenue requirement on an annual basis, subject to a reconciliation cap. The reconciliation cap limits the annual adjustment to 105% of the annual revenue requirement approved by the ICC. Certain variations from forecasted costs are excluded from the reconciliation cap, including those associated with major storms; new business and facility relocations; changes in the timing of certain expenditures or investments into or out of the applicable calendar year; and changes in interest rates, income taxes, taxes other than income taxes, pension and other post-retirement benefits costs, and amortization of certain assets. The reconciliation cap also excludes costs recovered outside of base rates through riders. The actual revenue requirement for a particular year incorporates Ameren Illinois' year-end rate base and actual capital structure for such year, provided that the resulting revenue requirement does not exceed the 105% reconciliation cap and the common equity ratio in such capital structure may not exceed that approved by the ICC in the MYRP. Ameren Illinois' existing riders continue to be effective under the MYRP. In addition, the ICC determines the ROE applicable to each year of the four-year period. Economic conditions could result in the annual predetermined ROE becoming inadequate over the four-year period. Ameren Illinois has filed an appeal of the ICC-determined ROE for 2024 through 2027 to the Illinois Appellate Court for the Fifth Judicial District. For additional information on the appeal see Note 2 - Rate and Regulatory Matters under Part II, Item 8, of this report. Failure to limit capital expenditures and operation and maintenance expenses to amounts that maintain revenue requirements under the reconciliation cap limit would adversely affect Ameren's and Ameren Illinois' results of operations, financial position, and liquidity.

---

## Modified: Energy conservation, energy efficiency, distributed generation, energy storage, technological advances, and other factors could reduce energy demand from our existing customers.

**Key changes:**

- Removed sentence: "The Ameren Companies have experienced minimal growth in energy demand for the past two decades."
- Removed sentence: "Recent industry projections reflect the potential for significant growth in energy demand over the next decade, primarily arising from data centers to support artificial intelligence and further augmented by onshoring and electrification of manufacturing and an increase in transportation electrification."
- Removed sentence: "The Ameren Companies may or may not experience energy demand growth depending on the decisions of potential new customers about whether to locate their operations within our service territories."
- Removed sentence: "If new customers elect to locate operations within our service territories, the Ameren Companies may not be able to provide the necessary electric service within the time periods required by those customers."
- Removed sentence: "The Ameren Companies may need to accelerate new generation build within current plans, and construct or obtain new generation sources and expand transmission and distribution facilities that are not currently within their plans."

**Prior (2025):**

The Ameren Companies have experienced minimal growth in energy demand for the past two decades. Recent industry projections reflect the potential for significant growth in energy demand over the next decade, primarily arising from data centers to support artificial intelligence and further augmented by onshoring and electrification of manufacturing and an increase in transportation electrification. The Ameren Companies may or may not experience energy demand growth depending on the decisions of potential new customers about whether to locate their operations within our service territories. If new customers elect to locate operations within our service territories, the Ameren Companies may not be able to provide the necessary electric service within the time periods required by those customers. The Ameren Companies may need to accelerate new generation build within current plans, and construct or obtain new generation sources and expand transmission and distribution facilities that are not currently within their plans. The Ameren Companies may not be able to plan, receive regulatory approvals, and execute those plans in a timely manner. Future demand from these customers may not be realized at the current projected pace as a result of increased efficiency in computing, and these new customers may be transitory and exit our service territory. Significant uncertainty exists regarding future increases in energy demand within the Ameren Companies' service territory, and whether and how the Ameren Companies will construct or obtain the assets necessary to timely serve that additional demand. Without a regulatory mechanism to ensure recovery, declines in energy usage could result in an under-recovery of our revenue requirement or an increase in our customer rates, as the revenue requirement would be spread over less sales volumes, which could adversely affect our results of operations, financial position, and liquidity. Such declines could occur due to a number of factors, including: •customer energy-efficiency programs that are designed to reduce energy demand; •energy-efficiency efforts by customers not related to our energy-efficiency programs; •increased customer use of distributed generation sources, such as solar panels and other technologies, which have become more cost-competitive, with decreasing costs expected in the future, as well as the use of energy storage technologies; and •macroeconomic factors resulting in low economic growth or contraction within our service territories, which could reduce energy demand. Decreased use of our generation, transmission, and distribution services might result in stranded costs, which ultimately might not be recovered through rates, and therefore could lead to an impairment or abandonment of assets.

**Current (2026):**

Without a regulatory mechanism to ensure recovery, declines in energy usage could result in an under-recovery of our revenue requirement or an increase in our customer rates, as the revenue requirement would be spread over less sales volumes, which could adversely affect our results of operations, financial position, and liquidity. Such declines could occur due to a number of factors, including: •customer energy-efficiency programs that are designed to reduce energy demand; •energy-efficiency efforts by customers not related to our energy-efficiency programs; •technological advancements that reduce energy consumption and demand; •increased customer use of distributed generation sources, such as solar panels and other technologies, which have become more cost-competitive, with decreasing costs expected in the future, as well as the use of energy storage technologies; and •macroeconomic factors resulting in low economic growth or contraction within our service territories, which could reduce energy demand. Decreased use of our generation, transmission, and distribution services might result in stranded costs, which ultimately might not be recovered through rates, and therefore could lead to an impairment or abandonment of assets.

---

*Data sourced from SEC EDGAR. Last updated 2026-06-01.*