Exelon Corporation: 10-K Risk Factor Changes

2026 vs 2025  ·  SEC EDGAR  ·  2026-05-10
⚠ AI-Generated

The summary below was generated by an AI language model and may contain errors or omissions. All other content on this page is deterministically extracted from the original SEC EDGAR filing.

Exelon removed one risk related to the resolved Deferred Prosecution Agreement and SEC investigation, reflecting the completion of that matter. Two key risks were substantively modified: one addressing collateral requirements and liquidity impacts, and another concerning capital intensity, asset maintenance, and supply chain vulnerabilities including labor shortages and tariff increases. The overall risk disclosure remained relatively stable with 24 risks unchanged across the filing period.

✓ Deterministic extraction — no AI-generated data

Classification is based on semantic text similarity scoring and may include approximations. “No match” means no high-confidence textual match was found — not necessarily that a section was removed.

0
New Risks
1
Removed
3
Modified
24
Unchanged
🔴 No Match in Current Filing

The activities associated with the past Deferred Prosecution Agreement and the now resolved associated SEC investigation could have a material adverse effect on Exelon’s and ComEd’s reputation and relationship with legislators, regulators, and customers that could affect their ability to achieve actions and approvals (Exelon and ComEd).

This section from the 2025 filing does not have a high-confidence textual match in the 2026 filing. It may have been removed, merged, or substantially reworded.

On July 17, 2020, ComEd entered into a Deferred Prosecution Agreement with the USAO for the Northern District of Illinois to resolve the USAO’s investigation into Exelon’s and ComEd’s lobbying activities in the State of Illinois. Exelon was not made a party to the DPA and no…

View 2025 text

On July 17, 2020, ComEd entered into a Deferred Prosecution Agreement with the USAO for the Northern District of Illinois to resolve the USAO’s investigation into Exelon’s and ComEd’s lobbying activities in the State of Illinois. Exelon was not made a party to the DPA and no charges were brought against Exelon. Under the DPA, the USAO filed a single charge alleging that ComEd improperly gave and offered to give jobs, vendor subcontracts, and payments associated with those jobs and subcontracts for the benefit of the Speaker of the Illinois House of Representatives and the Speaker’s associates, with the intent to influence the Speaker’s action regarding legislation affecting ComEd’s interests. The DPA provided that the USAO would defer any prosecution of such charge and any other criminal or civil case against ComEd in connection with the matters identified therein for a three-year period. That period expired, and the pending charge was dismissed, in July 2023. In October 2019, the SEC notified Exelon and ComEd that it had opened an investigation into their lobbying activities in the state of Illinois. On September 28, 2023, Exelon and ComEd reached a settlement with the SEC to fully resolve the matter. The DPA and the settlement with the SEC could have a material adverse impact on Exelon’s and ComEd’s reputation or relationships with regulatory and legislative authorities, customers, and other stakeholders. Those impacts could affect, or make more difficult, their efforts to achieve actions or approvals associated with operations. See Note 18 — Commitments and Contingencies of the Combined Notes to Consolidated Financial Statements for more information regarding the DPA and SEC settlement. 24 24 24 Table of Contents Table of Contents

🟡 Modified

amounts of collateral that could affect its liquidity and could experience higher borrowing costs (All Registrants).

high match confidence

Sentence-level differences:

  • Removed sentence: "29 29 29 Table of Contents Table of Contents"

Current (2026):

The Utility Registrants' operating agreements with PJM and PECO's, BGE's, and DPL's natural gas procurement contracts contain collateral provisions that are affected by their credit rating and market prices. If certain wholesale market conditions were to exist and the Utility…

Read full text

The Utility Registrants' operating agreements with PJM and PECO's, BGE's, and DPL's natural gas procurement contracts contain collateral provisions that are affected by their credit rating and market prices. If certain wholesale market conditions were to exist and the Utility Registrants were to lose their investment grade credit ratings (based on their senior unsecured debt ratings), they would be required to provide collateral in the forms of letters of credit or cash, which could have a material adverse effect upon their remaining sources of liquidity. PJM collateral posting requirements will generally increase as market prices rise and decrease as market prices fall. Collateral posting requirements for PECO, BGE, and DPL, with respect to their natural gas supply contracts, will generally increase as forward market prices fall and decrease as forward market prices rise. If the Utility Registrants were downgraded, they could experience higher borrowing costs as a result of the downgrade. In addition, changes in ratings methodologies by the agencies could also have an adverse negative impact on the ratings of the Utility Registrants. The Utility Registrants conduct their respective businesses and operate under governance models and other arrangements and procedures intended to assure that the Utility Registrants are treated as separate, independent companies, distinct from Exelon and other Exelon subsidiaries in order to isolate the Utility Registrants from Exelon and other Exelon subsidiaries in the event of financial difficulty at Exelon or another Exelon subsidiary. These measures (commonly referred to as “ring-fencing”) could help avoid or limit a downgrade in the credit ratings of the Utility Registrants in the event of a reduction in the credit rating of Exelon. Despite these ring-fencing measures, the credit ratings of the Utility Registrants could remain linked, to some degree, to the credit ratings of Exelon. Consequently, a reduction in the credit rating of Exelon could result in a reduction of the credit rating of some or all of the Utility Registrants. A reduction in the credit rating of a Utility Registrant could have a material adverse effect on the Utility Registrant. See ITEM 7. MANAGEMENT'S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS — Liquidity and Capital Resources — Credit Matters and Cash Requirements — Security Ratings for additional information regarding the potential impacts of credit downgrades on the Registrants’ cash flows.

View prior text (2025)

The Utility Registrants' operating agreements with PJM and PECO's, BGE's, and DPL's natural gas procurement contracts contain collateral provisions that are affected by their credit rating and market prices. If certain wholesale market conditions were to exist and the Utility Registrants were to lose their investment grade credit ratings (based on their senior unsecured debt ratings), they would be required to provide collateral in the forms of letters of credit or cash, which could have a material adverse effect upon their remaining sources of liquidity. PJM collateral posting requirements will generally increase as market prices rise and decrease as market prices fall. Collateral posting requirements for PECO, BGE, and DPL, with respect to their natural gas supply contracts, will generally increase as forward market prices fall and decrease as forward market prices rise. If the Utility Registrants were downgraded, they could experience higher borrowing costs as a result of the downgrade. In addition, changes in ratings methodologies by the agencies could also have an adverse negative impact on the ratings of the Utility Registrants. The Utility Registrants conduct their respective businesses and operate under governance models and other arrangements and procedures intended to assure that the Utility Registrants are treated as separate, independent companies, distinct from Exelon and other Exelon subsidiaries in order to isolate the Utility Registrants from Exelon and other Exelon subsidiaries in the event of financial difficulty at Exelon or another Exelon subsidiary. These measures (commonly referred to as “ring-fencing”) could help avoid or limit a downgrade in the credit ratings of the Utility Registrants in the event of a reduction in the credit rating of Exelon. Despite these ring-fencing measures, the credit ratings of the Utility Registrants could remain linked, to some degree, to the credit ratings of Exelon. Consequently, a reduction in the credit rating of Exelon could result in a reduction of the credit rating of some or all of the Utility Registrants. A reduction in the credit rating of a Utility Registrant could have a material adverse effect on the Utility Registrant. See ITEM 7. MANAGEMENT'S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS — Liquidity and Capital Resources — Credit Matters and Cash Requirements — Security Ratings for additional information regarding the potential impacts of credit downgrades on the Registrants’ cash flows. 29 29 29 Table of Contents Table of Contents

🟡 Modified

The Registrants’ businesses are capital intensive, and their assets could require significant expenditures to maintain, are subject to operational failure and could be impacted by disruptions or cost increases in the supply chain, including shortages in labor, materials or parts, or significant increases in relevant tariffs which could result in potential liability (All Registrants).

high match confidence

Sentence-level differences:

Current (2026):

The Utility Registrants’ businesses are capital intensive and require significant investments in transmission and distribution infrastructure projects. Equipment, even if maintained in accordance with good utility practices, is subject to operational failure, including events…

Read full text

The Utility Registrants’ businesses are capital intensive and require significant investments in transmission and distribution infrastructure projects. Equipment, even if maintained in accordance with good utility practices, is subject to operational failure, including events that are beyond the Utility Registrants’ control, and could require significant expenditures to operate efficiently. Disruptions or cost increases in the supply chain, including shortages in labor, materials or parts, or significant increases in relevant tariffs, could materially impact the timing and execution of capital projects, and the timing of placing assets in service, as well as other aspects of the Registrants' businesses. In recent years, the energy industry has been experiencing shortages of, and long lead times for, critical equipment such as transformers and conductors. The Registrants' consolidated financial statements could be negatively affected if they were unable to effectively manage their capital projects or raise the necessary capital, or if they are deemed liable for operational failure. See ITEM 7. MANAGEMENT'S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS — Liquidity and Capital Resources for additional information regarding the Registrants’ potential future capital expenditures.

View prior text (2025)

The Utility Registrants’ businesses are capital intensive and require significant investments in transmission and distribution infrastructure projects. Equipment, even if maintained in accordance with good utility practices, is subject to operational failure, including events that are beyond the Utility Registrants’ control, and could require significant expenditures to operate efficiently. Disruptions or cost increases in the supply chain, including shortages in labor, materials or parts, or significant increases in relevant tariffs, could materially impact the timing and execution of capital projects, and the timing of placing assets in service, as well as other aspects of the Registrants' businesses. In recent years, the energy industry has been experiencing shortages of, and long lead times for, critical equipment such as transformers and conductors. The Registrants' consolidated financial statements could be negatively affected if they were unable to effectively manage their capital projects or raise the necessary capital, or if they are deemed liable for operational failure. See ITEM 7. MANAGEMENT'S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS — Liquidity and Capital Resources for additional information regarding the Registrants’ potential future capital expenditures.

🟡 Modified

The Utility Registrants' respective ability to deliver electricity, their operating costs, and their capital expenditures could be negatively impacted by the insufficiency of generation or energy storage resources to meet demand, transmission congestion, and failures of neighboring transmission systems (All Registrants).

high match confidence

Sentence-level differences:

  • Reworded sentence: "As is the case for electric utilities generally, potential concerns over transmission capacity or generation facility retirements could result in PJM or FERC requiring the Utility Registrants to upgrade or expand their respective transmission systems through additional capital expenditures."

Current (2026):

Demand for electricity within the Utility Registrants' service areas could stress available transmission capacity requiring alternative routing or curtailment of electricity usage. Also, insufficient availability of electric supply to meet customer demand could jeopardize the…

Read full text

Demand for electricity within the Utility Registrants' service areas could stress available transmission capacity requiring alternative routing or curtailment of electricity usage. Also, insufficient availability of electric supply to meet customer demand could jeopardize the Utility Registrants' ability to comply with reliability standards and strain customer and regulatory agency relationships. As is the case for electric utilities generally, potential concerns over transmission capacity or generation facility retirements could result in PJM or FERC requiring the Utility Registrants to upgrade or expand their respective transmission systems through additional capital expenditures. Delays in siting, permitting, and interconnection could defer the introduction of new generation or energy storage resources that could address resource adequacy concerns. PJM’s systems and operations are designed to ensure the reliable operation of the transmission grid and prevent the operations of one utility from having an adverse impact on the operations of the other utilities. However, service interruptions at other utilities may cause interruptions in the Utility Registrants’ service areas. Additionally, efforts to artificially manipulate power demand on the grid, or even accidental activity that results in sharp fluctuations of demand, could disrupt grid operations.

View prior text (2025)

Demand for electricity within the Utility Registrants' service areas could stress available transmission capacity requiring alternative routing or curtailment of electricity usage. Also, insufficient availability of electric supply to meet customer demand could jeopardize the Utility Registrants' ability to comply with reliability standards and strain customer and regulatory agency relationships. As is the case for electric utilities generally, potential concerns over transmission capacity or generation facility retirements could result in PJM or FERC requiring the 27 27 27 Table of Contents Table of Contents Utility Registrants to upgrade or expand their respective transmission systems through additional capital expenditures. Delays in siting, permitting, and interconnection could defer the introduction of new generation resources that could address resource adequacy concerns. PJM’s systems and operations are designed to ensure the reliable operation of the transmission grid and prevent the operations of one utility from having an adverse impact on the operations of the other utilities. However, service interruptions at other utilities may cause interruptions in the Utility Registrants’ service areas. Additionally, efforts to artificially manipulate power demand on the grid, or even accidental activity that results in sharp fluctuations of demand, could disrupt grid operations.