# NextEra Energy Inc.: 10-K Risk Factor Changes 2025 vs 2024

> Source: U.S. Securities and Exchange Commission (EDGAR)  
> Generated: 2026-05-10  
> All data extracted directly from official filings. No hallucinated content.

> **[AI-Generated Summary]** The paragraph below was produced by a language
> model and may contain errors. All other content on this page is deterministically
> extracted from the original SEC filing.

> NextEra Energy added eight new risk disclosures in 2025, including specific risks related to regulatory decisions affecting NEE and FPL and defaults on project-specific limited-recourse financing agreements for consolidated and unconsolidated subsidiaries. The company modified 14 existing risks with substantive changes, including enhanced disclosures around allegations of law violations and operational/maintenance risks at generation, storage, transmission, and distribution facilities. No risks were removed from the prior year, resulting in a net expansion of risk factor disclosure from 50 total risks in 2024 to 58 in 2025.

---

## Summary

| Status | Count |
|--------|-------|
| New risks added | 8 |
| Risks removed | 0 |
| Risks modified | 14 |
| Unchanged | 36 |

---

## New in Current Filing: Regulatory decisions that are important to NEE and FPL may be materially adversely affected by political, regulatory, operational and economic factors.

The local and national political, regulatory and economic environment has had, and may in the future have, an adverse effect on regulatory decisions with negative consequences for NEE and FPL. These decisions, which may come from any level of government, including through actions taken, or not taken, by government agencies as a result of executive orders, may require, for example, FPL or NEER to cancel or delay planned development activities, to reduce or delay other planned capital expenditures or to pay for investments or otherwise incur costs that it may not be able to recover through rates or otherwise, each of which could have a material adverse effect on the business, financial condition, results of operations and prospects of NEE and FPL.

---

## New in Current Filing: Table of Contents

supportive of clean energy project development, generally to be in a state of transition for the foreseeable future. Changes in the structure of the industry or in such laws and regulations could have a material adverse effect on NEE's and FPL's business, financial condition, results of operations and prospects.

---

## New in Current Filing: Table of Contents

alleged compliance failures could result in significant costs and other potentially adverse effects of regulatory investigations, proceedings, settlements, decisions and claims, including, among other items, potentially significant monetary penalties. As an example, under the Energy Policy Act of 2005, NEE and FPL, as owners and operators of bulk-power transmission systems and/or electric generation facilities, are subject to mandatory reliability standards. Compliance with these mandatory reliability standards may subject NEE and FPL to higher operating costs and may result in increased capital expenditures. If FPL or NEE is found not to be in compliance with these standards, they may incur substantial monetary penalties and other sanctions. In addition, certain of NEE's and FPL's sales to retail customers are subject to consumer protection laws and other regulations related to consumer activities that are implemented and enforced by a number of federal, state and local government entities. Both the costs of regulatory compliance and the costs that may be imposed as a result of any actual or alleged compliance failures could have a material adverse effect on NEE's and FPL's business, financial condition, results of operations and prospects.

---

## New in Current Filing: Table of Contents

disruptions in the ability of NEE and FPL to acquire solar panels and batteries on time and at acceptable costs. If any development project or construction or capital improvement project is not completed, is delayed or is subject to cost overruns, certain associated costs may not be approved for recovery or otherwise be recoverable through regulatory mechanisms that may be available, and NEE and FPL could become obligated to make delay or termination payments or become obligated for other damages under contracts, could experience the loss, or reduction, of tax credits, bonus credits or tax incentives, the inability to transfer tax credits, or delayed or diminished returns, and could be required to write off all or a portion of their investment in the project. Any of these events could have a material adverse effect on NEE's and FPL's business, financial condition, results of operations and prospects.

---

## New in Current Filing: Table of Contents

in, and is expected to continue to result in, increased costs. Such events or actions may materially adversely affect NEE's and FPL's business, financial condition, results of operations and prospects.

---

## New in Current Filing: Table of Contents

alternative valuation methods could affect the reported fair value of these derivative instruments and have a material adverse effect on NEE's and FPL's business, financial condition, results of operations and prospects.

---

## New in Current Filing: Table of Contents

and credit markets to provide project-specific or other financing for electric generation or other facilities or acquisitions on favorable terms, whether because of disruptions or volatility in those markets or otherwise, could necessitate additional capital raising or borrowings by NEE and/or NEECH in the future and there can be no assurance that NEE or NEECH will have the ability to complete such financings.

---

## New in Current Filing: Defaults or noncompliance related to project-specific, limited-recourse financing agreements of NEE's consolidated and unconsolidated subsidiaries could materially adversely affect NEE's business, financial condition, liquidity, results of operations and prospects, as well as the availability or terms of future financings for NEE or its subsidiaries.

NEE's consolidated and unconsolidated subsidiaries finance a number of their assets with project-specific, limited-recourse financings. The inability of subsidiaries that have existing project-specific or other financing arrangements to meet the requirements of various agreements relating to those financings, as well as actions by third parties or lenders, could give rise to a project-specific financing default which, if not cured or waived, might result in the specific project, and potentially in some limited instances its parent companies, being required to repay the associated debt or other borrowings earlier than otherwise anticipated. If such repayment were not made, the lenders or security holders would generally have rights to foreclose against the project assets and related collateral. Such an occurrence also could result in NEE expending additional funds or incurring additional obligations over the shorter term to ensure continuing compliance with project-specific financing arrangements based upon the expectation of improvement in the project's performance or financial returns over the longer term. Any of these actions could materially adversely affect NEE's business, financial condition, liquidity, results of operations and prospects, as well as the availability or terms of future financings for NEE or its subsidiaries.

---

## Modified: Allegations of violations of law by FPL or NEE have the potential to result in fines, penalties, or other sanctions or effects, as well as cause reputational damage for FPL and NEE, and could hamper FPL's and NEE's effectiveness in interacting with governmental authorities.

**Key changes:**

- Reworded sentence: "For example, media articles were first published in 2021 that alleged, among other things, Florida state and federal campaign finance law violations by FPL."

**Prior (2024):**

FPL's and NEE's business and reputation could be adversely affected by allegations that FPL or NEE has violated laws, by any investigations or proceedings that arise from such allegations, or by ultimate determinations of legal violations. For example, media articles have been published that allege, among other things, Florida state and federal campaign finance law violations by FPL. These articles are referenced in a complaint subsequently filed with the Federal Election Commission (FEC) that alleges certain violations of the Federal Election Campaign Act. FPL and NEE cannot guarantee that the FEC complaint process will not ultimately result in a finding that FPL or NEE violated federal campaign finance or other laws, that applicable federal or state governmental authorities may not investigate or take enforcement actions with respect to the allegations or assert that legal violations by FPL or NEE have occurred, or that violations may not ultimately be found by a court of competent jurisdiction or other authorities to have occurred. In addition, notwithstanding the completion or pendency of any internal review or investigation by FPL or NEE of any allegations of legal violations, including of the allegations regarding campaign finance laws set forth in the media articles or FEC complaint, FPL and NEE cannot provide assurance that any of the foregoing will not result in the imposition of material fines, penalties, or otherwise result in other sanctions or effects on FPL or NEE, or will not have a material adverse impact on the reputation of NEE or FPL or on the effectiveness of their interactions with governmental regulators or other authorities.

**Current (2025):**

FPL's and NEE's business and reputation could be adversely affected by allegations that FPL or NEE has violated laws, by any investigations or proceedings that arise from such allegations, or by ultimate determinations of legal violations. For example, media articles were first published in 2021 that alleged, among other things, Florida state and federal campaign finance law violations by FPL. FPL and NEE cannot provide assurance that the outcome of any allegations of violations of law will not result in the imposition of material fines, penalties, or otherwise result in other sanctions or effects on FPL or NEE, or will not have a material adverse impact on the reputation of NEE or FPL or on the effectiveness of their interactions with governmental regulators or other authorities.

---

## Modified: The operation and maintenance of NEE's and FPL's electric generation, storage, transmission and distribution facilities, natural gas and oil production and transportation facilities and other facilities are subject to many operational risks, the consequences of which could have a material adverse effect on NEE's and FPL's business, financial condition, results of operations and prospects.

**Key changes:**

- Reworded sentence: "NEE's and FPL's electric generation, storage, transmission and distribution facilities, natural gas and oil production and transportation facilities and other facilities are subject to many operational risks."

**Prior (2024):**

NEE's and FPL's electric generation, transmission and distribution facilities, gas infrastructure facilities and other facilities are subject to many operational risks. Operational risks could result in, among other things, lost revenues due to prolonged outages, increased expenses due to monetary penalties or fines for compliance failures or legal claims, liability to third parties for property and personal injury damage or loss of life, a failure to perform under applicable power sales agreements or other agreements and associated loss of revenues from terminated agreements or liability for liquidated damages under continuing agreements, and replacement equipment costs or an obligation to purchase or generate replacement power at higher prices. Uncertainties and risks inherent in operating and maintaining NEE's and FPL's facilities include, but are not limited to: •risks associated with facility start-up operations, such as whether the facility will achieve projected operating performance on schedule and otherwise as planned; •failures in the availability, acquisition or transportation of fuel or other necessary supplies; •the impact of unusual or adverse weather conditions and natural disasters, including, but not limited to, hurricanes, tornadoes, extreme temperatures, icing events, wildfires, floods, severe convective storms, earthquakes and droughts; •performance below expected or contracted levels of output or efficiency; •breakdown or failure, including, but not limited to, explosions, fires, leaks or other major events, of equipment, transmission or distribution systems or pipelines; •availability of replacement equipment; •risks of property damage, human injury or loss of life from energized equipment, hazardous substances or explosions, fires, leaks or other events, especially where facilities are located near populated areas; •potential environmental impacts of gas infrastructure operations; •risks associated with potential harm to wildlife; •availability of adequate water resources and ability to satisfy water intake and discharge requirements; •inability to identify, manage properly or mitigate equipment defects in NEE's and FPL's facilities; •use of new or unproven technology; •risks associated with dependence on a specific type of fuel or fuel source, such as commodity price risk, availability of adequate fuel supply and transportation, and lack of available alternative fuel sources; •increased competition due to, among other factors, new facilities, excess supply, shifting demand and regulatory changes (such as the passage of the IRA); and •insufficient insurance, warranties or performance guarantees to cover any or all lost revenues or increased expenses from the foregoing.

**Current (2025):**

NEE's and FPL's electric generation, storage, transmission and distribution facilities, natural gas and oil production and transportation facilities and other facilities are subject to many operational risks. Operational risks could result in, among other things, lost revenues due to prolonged outages, increased expenses due to monetary penalties or fines for compliance failures or legal claims, liability to third parties for property and personal injury damage or loss of life, unsatisfied customers, a failure to perform under applicable power sales agreements or other agreements and associated loss of revenues from terminated agreements or liability for liquidated damages under continuing agreements, and replacement equipment costs or an obligation to purchase or generate replacement power at higher prices. Uncertainties and risks inherent in operating and maintaining NEE's and FPL's facilities include, but are not limited to: •risks associated with facility start-up operations, such as whether the facility will achieve projected operating performance on schedule and otherwise as planned; •failures in the availability, acquisition or transportation of fuel or other necessary supplies; •the impact of unusual or adverse weather conditions and natural disasters, including, but not limited to, hurricanes, tornadoes, extreme temperatures, icing events, wildfires, floods, severe convective storms, earthquakes and droughts; •performance below expected or contracted levels of output or efficiency; •breakdown or failure, including, but not limited to, explosions, fires, leaks or other major events, of equipment, transmission or distribution systems or pipelines; •availability of replacement equipment; •risks of property damage, human injury or loss of life from energized equipment, hazardous substances or explosions, fires, leaks or other events, especially where facilities are located near populated areas; •potential environmental impacts of natural gas and oil production and transportation operations; •risks associated with potential harm to wildlife; •availability of adequate water resources and ability to satisfy water intake and discharge requirements; •inability to identify, manage properly or mitigate equipment defects in NEE's and FPL's facilities; •use of new or unproven technology; •inability to anticipate or adapt to changes in the reliability of NEE's or FPL's equipment, operating systems or facilities; •risks associated with dependence on a specific type of fuel or fuel source, such as commodity price risk, availability of adequate fuel supply and transportation, and lack of available alternative fuel sources; •increased competition due to, among other factors, new facilities, excess supply, shifting demand and regulatory changes; and •insufficient insurance, warranties or performance guarantees to cover any or all lost revenues or increased expenses from the foregoing.

---

## Modified: If cost recovery arrangements for increased supply costs necessary to provide NEER's full energy and capacity requirements services are not favorable, operating costs could increase and materially adversely affect NEE's business, financial condition, results of operations and prospects.

**Key changes:**

- Reworded sentence: "If any of these factors materialize, NEER may not be able to recover all of its increased supply costs, which could have a material adverse effect on NEE's business, financial condition, results of operations and prospects."

**Prior (2024):**

NEER provides full energy and capacity requirements services primarily to distribution utilities, which include load-following services and various ancillary services, to satisfy all or a portion of such utilities' power supply obligations to their customers. The supply costs for these transactions may be affected by a number of factors, including, but not limited to, events that may occur after such utilities have committed to supply power, such as weather conditions, transmission constraints, fluctuating prices for, and locational disconnects in, energy and ancillary services, and the ability of the distribution utilities' customers to elect to receive service from competing suppliers. NEER may not be able to recover all of its increased supply costs, which could have a material adverse effect on NEE's business, financial condition, results of operations and prospects.

**Current (2025):**

NEER provides full energy and capacity requirements services primarily to distribution utilities, which include load-following services and various ancillary services, to satisfy all or a portion of such utilities' power supply obligations to their customers. The supply costs for these transactions may be affected by a number of factors, including, but not limited to, events that may occur after such utilities have committed to supply power, such as weather conditions, transmission constraints, fluctuating prices for, and locational disconnects in, energy and ancillary services, and the ability of the distribution utilities' customers to elect to receive service from competing suppliers. If any of these factors materialize, NEER may not be able to recover all of its increased supply costs, which could have a material adverse effect on NEE's business, financial condition, results of operations and prospects.

---

## Modified: Disruptions, uncertainty or volatility in the credit and capital markets, among other factors, may negatively affect NEE's and FPL's ability to fund their liquidity and capital needs and to meet their growth objectives, and could also materially adversely affect their business, financial condition, liquidity, results of operations and prospects.

**Key changes:**

- Reworded sentence: "Disruptions, uncertainty or volatility in those capital and credit markets related to, among others, inflation, rising or sustained higher interest rates and political, regulatory and geopolitical events, could increase NEE's and FPL's cost of capital and affect their ability to fund their liquidity and capital needs, to refinance existing indebtedness and to meet their growth objectives."
- Reworded sentence: "Although certain NEE subsidiaries have used non-recourse or limited-recourse, project-specific or other financing in the past, market conditions, changes to regulatory capital requirements and other factors could adversely affect the future availability of such financing."

**Prior (2024):**

NEE and FPL rely on access to capital and credit markets as significant sources of liquidity for capital requirements, refinancing activities to support existing debt maturities and other requirements that are not satisfied by operating cash flows. Disruptions, uncertainty or volatility in those capital and credit markets, related to, among others, inflation, rising or sustained higher interest rates and geopolitical events, could increase NEE's and FPL's cost of capital and affect their ability to fund their liquidity and capital needs, to refinance existing indebtedness and to meet their growth objectives. If NEE or FPL is unable to access regularly the capital and credit markets on terms that are reasonable, it may have to delay raising capital, issue shorter-term securities and incur an unfavorable cost of capital, which, in turn, could adversely affect its ability to maintain and grow its business, could contribute to lower earnings and reduced financial flexibility, and could have a material adverse effect on its business, financial condition, liquidity, results of operations and prospects. Although NEE's competitive energy and certain other subsidiaries have used non-recourse or limited-recourse, project-specific or other financing in the past, market conditions, changes to regulatory capital requirements and other factors could adversely affect the future availability of such financing. The inability of NEE's subsidiaries, including, without limitation, NEECH and its subsidiaries, to access the capital and credit markets to provide project-specific or other financing for electric generation or other facilities or acquisitions on favorable terms, whether because of disruptions or volatility in those markets or otherwise, could necessitate additional capital raising or borrowings by NEE and/or NEECH in the future and there can be no assurance that NEE or NEECH will have the ability to complete such borrowings. The inability of subsidiaries that have existing project-specific or other financing arrangements to meet the requirements of various agreements relating to those financings, as well as actions by third parties or lenders, could give rise to a project-specific financing default which, if not cured or waived, might result in the specific project, and potentially in some limited instances its parent companies, being required to repay the associated debt or other borrowings earlier than otherwise anticipated, and if such repayment were not made, the lenders or security holders would generally have rights to foreclose against the project assets and related collateral. Such an occurrence also could result in NEE expending additional funds or incurring additional obligations over the shorter term to ensure continuing compliance with project-specific financing arrangements based upon the expectation of improvement in the project's performance or financial returns over the longer term. Any of these actions could materially adversely affect NEE's business, financial condition, liquidity, results of operations and prospects, as well as the availability or terms of future financings for NEE or its subsidiaries.

**Current (2025):**

NEE and FPL rely on access to capital and credit markets as significant sources of liquidity for capital requirements, refinancing activities to support existing debt maturities and other requirements that are not satisfied by operating cash flows. Disruptions, uncertainty or volatility in those capital and credit markets related to, among others, inflation, rising or sustained higher interest rates and political, regulatory and geopolitical events, could increase NEE's and FPL's cost of capital and affect their ability to fund their liquidity and capital needs, to refinance existing indebtedness and to meet their growth objectives. If NEE or FPL is unable to access regularly the capital and credit markets on terms that are reasonable, it may have to delay raising capital, issue shorter-term securities and incur an unfavorable cost of capital, which, in turn, could adversely affect its ability to maintain and grow its business, could contribute to lower earnings and reduced financial flexibility, and could have a material adverse effect on its business, financial condition, liquidity, results of operations and prospects. Although certain NEE subsidiaries have used non-recourse or limited-recourse, project-specific or other financing in the past, market conditions, changes to regulatory capital requirements and other factors could adversely affect the future availability of such financing. The inability of NEE's subsidiaries, including, without limitation, NEECH and its subsidiaries, to access the capital 31 31 31

---

## Modified: NEE's and FPL's business, financial condition, results of operations and prospects could suffer if NEE and FPL do not proceed with projects under development or are unable to complete the construction of, or capital improvements to, electric generation, storage, transmission and distribution facilities, natural gas and oil production and transportation facilities or other facilities on schedule or within budget.

**Key changes:**

- Reworded sentence: "NEE's and FPL's ability to proceed with projects under development and to complete construction of, and capital improvement projects for, their electric generation, storage, transmission and distribution facilities, natural gas and oil production and transportation facilities and other facilities on schedule and within budget have been, from time to time, and in the future may be, adversely affected by escalating costs for materials and labor and regulatory compliance, inability to obtain or renew necessary licenses, rights-of-way, permits or other approvals on acceptable terms or on schedule, disputes involving contractors, labor organizations, land owners, governmental entities, environmental groups, Native American and aboriginal groups, lessors, joint venture partners, suppliers and other third parties, negative publicity, transmission interconnection issues, geopolitical factors, supply chain disruptions, inflation, rising interest rates and other factors."

**Prior (2024):**

NEE's and FPL's ability to proceed with projects under development and to complete construction of, and capital improvement projects for, their electric generation, transmission and distribution facilities, gas infrastructure facilities and other facilities on schedule and within budget have been, in limited instances, and in the future may be, adversely affected by escalating costs for materials and labor and regulatory compliance, inability to obtain or renew necessary licenses, rights-of-way, permits or other approvals on acceptable terms or on schedule, disputes involving contractors, labor organizations, land owners, governmental entities, environmental groups, Native American and aboriginal groups, lessors, joint venture partners, suppliers and other third parties, negative publicity, transmission interconnection issues, geopolitical factors, supply chain disruptions, inflation, rising interest rates and other factors. For example, the ability of NEE and FPL to develop solar generation facilities is dependent on the international supply chain for solar panels and associated equipment, and governmental or regulatory actions have caused minor, and could in the future cause material, disruptions in the ability of NEE and FPL to acquire solar panels on time and at acceptable costs. If any development project or construction or capital improvement project is not completed, is delayed or is subject to cost overruns, certain associated costs may not be approved for recovery or otherwise be recoverable through regulatory mechanisms that may be available, and NEE and FPL could become obligated to make delay or termination payments or become obligated for other damages under contracts, could experience the loss of tax credits or tax incentives, or delayed or diminished returns, and could be required to write off all or a portion of their investment in the project. Any of these events could have a material adverse effect on NEE's and FPL's business, financial condition, results of operations and prospects. 24 24 24 Table of Contents Table of Contents

**Current (2025):**

NEE's and FPL's ability to proceed with projects under development and to complete construction of, and capital improvement projects for, their electric generation, storage, transmission and distribution facilities, natural gas and oil production and transportation facilities and other facilities on schedule and within budget have been, from time to time, and in the future may be, adversely affected by escalating costs for materials and labor and regulatory compliance, inability to obtain or renew necessary licenses, rights-of-way, permits or other approvals on acceptable terms or on schedule, disputes involving contractors, labor organizations, land owners, governmental entities, environmental groups, Native American and aboriginal groups, lessors, joint venture partners, suppliers and other third parties, negative publicity, transmission interconnection issues, geopolitical factors, supply chain disruptions, inflation, rising interest rates and other factors. For example, the ability of NEE and FPL to develop solar generation and battery storage facilities is dependent on the international supply chain for solar panels, batteries and associated equipment, and governmental or regulatory actions have caused minor, and could in the future cause material, 24 24 24

---

## Modified: Due to the potential for significant volatility in market prices for fuel, electricity and environmental and other energy-related commodities, NEE's inability or failure to manage properly or hedge effectively the commodity risks within its portfolio could materially adversely affect NEE's business, financial condition, results of operations and prospects.

**Key changes:**

- Reworded sentence: "There can be significant volatility in market prices for fuel, electricity and environmental and other energy-related commodities, both in general and across geographies."

**Prior (2024):**

There can be significant volatility in market prices for fuel, electricity and renewable and other energy commodities, both in general and across geographies. NEE's inability or failure to manage properly or hedge effectively its assets or positions against changes in commodity prices, volumes, interest rates, counterparty credit risk or other risk measures, based on factors that are either within, or wholly or partially outside of, NEE's control, may materially adversely affect NEE's business, financial condition, results of operations and prospects.

**Current (2025):**

There can be significant volatility in market prices for fuel, electricity and environmental and other energy-related commodities, both in general and across geographies. NEE's inability or failure to manage properly or hedge effectively its assets or positions against changes in commodity prices, volumes, interest rates, counterparty credit risk or other risk measures, based on factors that are either within, or wholly or partially outside of, NEE's control, may materially adversely affect NEE's business, financial condition, results of operations and prospects. 27 27 27

---

## Modified: Table of Contents

**Key changes:**

- Reworded sentence: "Customer growth and customer usage are affected by a number of factors outside the control of NEE and FPL, such as mandated energy efficiency measures, demand side management requirements, installation of distributed generation technologies and economic and demographic conditions, such as population changes, job and income growth, housing starts, new business formation, expanded use of data centers, inflation and the overall level of economic activity."
- Removed sentence: "25 25 25 Table of Contents Table of Contents"

**Prior (2024):**

Growth in customer accounts and growth of customer usage each directly influence the demand for electricity and the need for additional power generation and power delivery facilities, as well as the need for energy-related commodities, such as natural gas. Customer growth and customer usage are affected by a number of factors outside the control of NEE and FPL, such as mandated energy efficiency measures, demand side management requirements, installation of distributed generation technologies and economic and demographic conditions, such as population changes, job and income growth, housing starts, new business formation, inflation and the overall level of economic activity. A lack of growth, or a decline, in the number of customers or in customer demand for electricity or natural gas and other fuels may cause NEE and FPL to fail to fully realize the anticipated benefits from significant investments and expenditures and could have a material adverse effect on NEE's and FPL's growth, business, financial condition, results of operations and prospects. 25 25 25 Table of Contents Table of Contents

**Current (2025):**

Growth in customer accounts and growth of customer usage each directly influence the demand for electricity and the need for additional power generation and power delivery facilities, as well as the need for energy-related commodities, such as natural gas. Customer growth and customer usage are affected by a number of factors outside the control of NEE and FPL, such as mandated energy efficiency measures, demand side management requirements, installation of distributed generation technologies and economic and demographic conditions, such as population changes, job and income growth, housing starts, new business formation, expanded use of data centers, inflation and the overall level of economic activity. A lack of growth, or a decline, in the number of customers or in customer demand for electricity or natural gas and other fuels may cause NEE and FPL to fail to fully realize the anticipated benefits from significant investments and expenditures and could have a material adverse effect on NEE's and FPL's growth, business, financial condition, results of operations and prospects.

---

## Modified: Extensive federal, state and local government regulation of the operations and businesses of NEE and FPL exposes NEE and FPL to significant and increasing compliance costs and may also expose them to substantial monetary penalties and other sanctions for compliance failures.

**Key changes:**

- Reworded sentence: "NEE's and FPL's operations and businesses are subject to extensive federal, state and local government regulation, which generally imposes significant and increasing compliance costs on their operations and businesses."

**Prior (2024):**

NEE's and FPL's operations and businesses are subject to extensive federal regulation, which generally imposes significant and increasing compliance costs on their operations and businesses. Additionally, any actual or alleged compliance failures could result in significant costs and other potentially adverse effects of regulatory investigations, proceedings, settlements, decisions and claims, including, among other items, potentially significant monetary penalties. As an example, under the Energy Policy Act of 2005, NEE and FPL, as owners and operators of bulk-power transmission systems and/or electric generation facilities, are subject to mandatory reliability standards. Compliance with these mandatory reliability standards may subject NEE and FPL to higher operating costs and may result in increased capital expenditures. If FPL or NEE is found not to be in compliance with these standards, they may incur substantial monetary penalties and other sanctions. Both the costs of regulatory compliance and the costs that may be imposed as a result of any actual or alleged compliance failures could have a material adverse effect on NEE's and FPL's business, financial condition, results of operations and prospects. 23 23 23 Table of Contents Table of Contents

**Current (2025):**

NEE's and FPL's operations and businesses are subject to extensive federal, state and local government regulation, which generally imposes significant and increasing compliance costs on their operations and businesses. Additionally, any actual or 23 23 23

---

## Modified: Table of Contents

**Prior (2024):**

Liability for accidents at nuclear power plants is governed by the Price-Anderson Act, which limits the liability of nuclear reactor owners to the amount of insurance available from both private sources and an industry retrospective payment plan. In accordance with this Act, NEE maintains the maximum amount of private liability insurance obtainable, and participates in a secondary financial protection system, which provides liability insurance coverage for an incident at any nuclear reactor in the U.S. Under the secondary financial protection system, NEE is subject to retrospective assessments and/or retrospective insurance premiums, plus any applicable taxes, for an incident at any nuclear reactor in the U.S. or at certain nuclear generation facilities in Europe, regardless of fault or proximity to the incident. Such assessments, if levied, could materially adversely affect NEE's and FPL's business, financial condition, results of operations and prospects.

**Current (2025):**

Liability for accidents at nuclear power plants is governed by the Price-Anderson Act, which limits the liability of nuclear reactor owners to the amount of insurance available from both private sources and an industry retrospective payment plan. In accordance with this Act, NEE maintains the maximum amount of private liability insurance obtainable, and participates in a secondary financial protection system, which provides liability insurance coverage for an incident at any nuclear reactor in the U.S. Under the secondary financial protection system, NEE is subject to retrospective assessments and/or retrospective insurance premiums, plus any applicable taxes, for an incident at any nuclear reactor in the U.S. or at certain nuclear generation facilities in Europe, regardless of fault or proximity to the incident. Such assessments, if levied, could materially adversely affect NEE's and FPL's business, financial condition, results of operations and prospects.

---

## Modified: NEE's and FPL's business, financial condition, results of operations and prospects could be materially adversely affected by new or revised laws, regulations or executive orders, as well as by regulatory action or inaction.

**Key changes:**

- Reworded sentence: "NEE's and FPL's business could be materially adversely affected by a variety of legal activity, such as: 1) the adoption of new or revised laws, such as international trade laws, regulations and interpretations; 2) constitutional ballot or regulatory initiatives, such as those seeking deregulation or restructuring of the energy industry; 3) new or revised regulations, such as those affecting the commodities trading and derivatives markets, emissions, water consumption, water discharges, wetlands, gas and oil infrastructure operations, and environmental and other permitting requirements for energy infrastructure projects; 4) actions taken, or not taken, by government agencies as a result of executive orders, such as failing to issue, delaying the issuance of, or increasing the requirements necessary to obtain approvals, rights-of-way, permits, determinations, leases or loans related to wind or other clean energy projects; and 5) changes in the way government interprets or applies laws, regulations and orders."
- Reworded sentence: "Any changes in Florida law or regulation, whether through new or modified legislation, regulation or executive action or through citizen-approved state constitutional ballot initiatives, which increase competition in the Florida retail electricity market, such as government incentives that would further facilitate the installation of solar generation facilities on residential or other rooftops, would permit third-party sales of electricity or would mandate the transition to renewable energy at FPL, could have a material adverse effect on FPL's business, financial condition, results of operations and prospects."
- Reworded sentence: "There can be no assurance that FPL or NEER will be able to respond adequately or sufficiently quickly to such rules and developments, which may impact the ability, timeline and cost of interconnecting new or repowered energy projects to the transmission system and the availability of transmission system capacity to deliver energy products to market, or to any changes that reverse or restrict the competitive restructuring of the energy industry in those jurisdictions in which such restructuring has occurred."
- Added sentence: "The structure of the energy industry and regulation in the U.S."
- Added sentence: "is currently, and may continue to be, subject to challenges and restructuring proposals."

**Prior (2024):**

NEE's and FPL's business is influenced by various legislative and regulatory initiatives, including, but not limited to, new or revised laws, including international trade laws, regulations and interpretations, constitutional ballot and regulatory initiatives regarding deregulation or restructuring of the energy industry, regulation of the commodities trading and derivatives markets, and regulation of environmental matters, such as regulation of air emissions, regulation of water consumption and water discharges, and regulation of gas and oil infrastructure operations, as well as associated environmental permitting. Changes in the nature of the regulation of NEE's and FPL's business could have a material adverse effect on NEE's and FPL's business, financial condition, results of operations and prospects. NEE and FPL are unable to predict future legislative or regulatory changes, including through constitutional ballot initiatives or changed legal or regulatory interpretations, although any such changes may increase costs and competitive pressures on NEE and FPL, which could have a material adverse effect on NEE's and FPL's business, financial condition, results of operations and prospects. FPL has limited, but growing, competition in the Florida market for retail electricity customers and is not subject to a RPS. Any changes in Florida law or regulation, whether through new or modified legislation or regulation or through citizen-approved state constitutional ballot initiatives, which increase competition in the Florida retail electricity market, such as government incentives that would further facilitate the installation of solar generation facilities on residential or other rooftops, would permit third-party sales of electricity or would mandate the transition to renewable energy at FPL, could have a material adverse effect on FPL's business, financial condition, results of operations and prospects. There can be no assurance that FPL would be able to respond adequately to such regulatory changes, which could have a material adverse effect on FPL's business, financial condition, results of operations and prospects. NEER is subject to FERC rules related to transmission that are designed to facilitate competition in the wholesale market on practically a nationwide basis. NEE cannot predict the impact of changing FERC rules or policies of the RTOs and ISOs, such as rules governing generator interconnection procedures and transmission planning requirements and cost allocation methodologies, or the effect of changes in levels of wholesale supply and demand, which are typically driven by factors beyond NEE's control. There can be no assurance that NEER will be able to respond adequately or sufficiently quickly to such rules and developments, which may impact the ability, timeline and cost of interconnecting new or repowered energy projects to the transmission system and the availability of transmission system capacity to deliver energy products to market, or to any changes that reverse or restrict the competitive restructuring of the energy industry in those jurisdictions in which such restructuring has occurred. Any of these events could have a material adverse effect on NEE's business, financial condition, results of operations and prospects.

**Current (2025):**

NEE's and FPL's business could be materially adversely affected by a variety of legal activity, such as: 1) the adoption of new or revised laws, such as international trade laws, regulations and interpretations; 2) constitutional ballot or regulatory initiatives, such as those seeking deregulation or restructuring of the energy industry; 3) new or revised regulations, such as those affecting the commodities trading and derivatives markets, emissions, water consumption, water discharges, wetlands, gas and oil infrastructure operations, and environmental and other permitting requirements for energy infrastructure projects; 4) actions taken, or not taken, by government agencies as a result of executive orders, such as failing to issue, delaying the issuance of, or increasing the requirements necessary to obtain approvals, rights-of-way, permits, determinations, leases or loans related to wind or other clean energy projects; and 5) changes in the way government interprets or applies laws, regulations and orders. Changes in the nature of the regulation of NEE's and FPL's business through this type or other types of legal activity could have a material adverse effect on NEE's and FPL's business, financial condition, results of operations and prospects. NEE and FPL are unable to predict future legislative, regulatory or executive action or inaction, including through constitutional ballot initiatives or changed government interpretations or applications, although any such changes may increase costs, the challenges associated with developing and operating clean and other energy infrastructure projects, and competitive pressures on NEE and FPL, which could have a material adverse effect on NEE's and FPL's business, financial condition, results of operations and prospects. FPL has limited, but growing, competition in the Florida market for retail electricity customers and is not subject to a RPS. Any changes in Florida law or regulation, whether through new or modified legislation, regulation or executive action or through citizen-approved state constitutional ballot initiatives, which increase competition in the Florida retail electricity market, such as government incentives that would further facilitate the installation of solar generation facilities on residential or other rooftops, would permit third-party sales of electricity or would mandate the transition to renewable energy at FPL, could have a material adverse effect on FPL's business, financial condition, results of operations and prospects. FPL and NEER are also regulated by FERC as transmission providers and sellers of wholesale power. FERC regulation of transmission and wholesale power transactions, including the ability of new energy infrastructure projects to sell the power they produce under power purchase agreements, evolves over time as a result of rulemaking proceedings and new legislative directives from Congress. There can be no assurance that FPL or NEER would be able to respond adequately to the aforementioned state and federal regulatory changes, which could have a material adverse effect on NEE's and FPL's business, financial condition, results of operations and prospects. FPL and NEER are also subject to FERC rules related to transmission that are designed to facilitate competition in the wholesale market on practically a nationwide basis and that evolve over time. NEE cannot predict the impact of changing FERC rules or policies of the RTOs and ISOs, such as rules governing generator interconnection procedures and transmission planning requirements and cost allocation methodologies, or the effect of changes in levels of wholesale supply and demand, which are typically driven by factors beyond NEE's control. There can be no assurance that FPL or NEER will be able to respond adequately or sufficiently quickly to such rules and developments, which may impact the ability, timeline and cost of interconnecting new or repowered energy projects to the transmission system and the availability of transmission system capacity to deliver energy products to market, or to any changes that reverse or restrict the competitive restructuring of the energy industry in those jurisdictions in which such restructuring has occurred. Any of these events could have a material adverse effect on NEE's business, financial condition, results of operations and prospects. The structure of the energy industry and regulation in the U.S. is currently, and may continue to be, subject to challenges and restructuring proposals. Additional regulatory approvals may be required due to changes in law or for other reasons. NEE expects the laws and regulation applicable to its business and the energy industry, including laws and regulations generally 22 22 22

---

## Modified: Certain of NEE's assets and investments are subject to changes in market value and other risks, which may materially adversely affect NEE's liquidity, financial condition and results of operations.

**Key changes:**

- Reworded sentence: "NEE holds certain assets and investments where changes in the fair value affect NEE's financial results."

**Prior (2024):**

NEE holds certain investments where changes in the fair value affect NEE's financial results. In some cases there may be no observable market values for these investments, requiring fair value estimates to be based on other valuation techniques. This type of analysis requires significant judgment and the actual values realized in a sale of these investments could differ materially from those estimated. A sale of an investment below previously estimated value, or other decline in the fair value of an investment, could result in losses or the write-off of such investment, and may have a material adverse effect on NEE's liquidity, financial condition and results of operations.

**Current (2025):**

NEE holds certain assets and investments where changes in the fair value affect NEE's financial results. In some cases there may be no observable market values for these assets and investments, requiring fair value estimates to be based on other valuation techniques. This type of analysis requires significant judgment and the actual values realized in a sale of these assets and investments could differ materially from those estimated. A sale of an asset or investment below previously estimated value, or other decline in the fair value of an asset or investment, could result in losses or the write-off of such asset or investment, and may have a material adverse effect on NEE's liquidity, financial condition and results of operations. NEE has invested in various joint ventures and equity method investments where it does not have full control over operations, management or decision-making. In many cases, NEE shares control rights with its partners, but may lack influence or be dependent on their business priorities. This situation can lead to decisions that differ from NEE's preferences, potentially impacting the profitability and value of these investments. Furthermore, if a joint venture partner becomes insolvent or bankrupt or is otherwise unable to meet its obligations, NEE may be responsible for meeting certain obligations of the joint ventures as stipulated in its governing documents or applicable law. NEE's reliance on the joint venture partners, who may not always share NEE's business priorities, may have a material adverse effect on NEE's liquidity, financial condition and results of operations.

---

## Modified: XPLR may not be able to access sources of capital on commercially reasonable terms, which would have a material adverse effect on its ability to consummate future acquisitions and on the value of NEE's limited partner interest in XPLR OpCo.

**Key changes:**

- Reworded sentence: "Through an indirect wholly owned subsidiary, NEE owns a limited partner interest in XPLR OpCo."

**Prior (2024):**

Through an indirect wholly owned subsidiary, NEE owns a limited partner interest in NEP OpCo. NEP's inability to access capital on commercially reasonable terms when acquisitions, other growth opportunities or capital needs arise could have a material adverse effect on NEP's ability to deliver its cash distributions to its common unitholders, including NEE, and on the value of NEE's limited partnership interest in NEP OpCo. In addition, NEP's issuance of additional common units or other securities in connection with acquisitions or the conversion of outstanding securities convertible into NEP common units could cause significant common unitholder dilution and reduce cash distributions to its common unitholders, including NEE.

**Current (2025):**

Through an indirect wholly owned subsidiary, NEE owns a limited partner interest in XPLR OpCo. XPLR's inability to access capital on commercially reasonable terms when acquisitions, other growth opportunities or capital needs arise could have a material adverse effect on XPLR's ability to deliver its cash distributions to its common unitholders in the future, including NEE, and on the value of NEE's limited partnership interest in XPLR OpCo. In addition, XPLR's issuance of additional common units or other securities in connection with acquisitions or the conversion of outstanding securities convertible into XPLR common units could cause significant common unitholder dilution and reduce future cash distributions, if any, to its common unitholders, including NEE.

---

## Modified: NEE invests in natural gas and oil production assets which are exposed to fluctuating market prices of natural gas, natural gas liquids, oil and other energy commodities. A prolonged period of low natural gas and oil prices, disrupted production or unsuccessful drilling efforts could impact NEER's natural gas and oil production operations and cause NEER to delay or cancel certain natural gas and oil production projects and could result in certain assets becoming impaired, which could materially adversely affect NEE's business, financial condition, results of operations and prospects.

**Key changes:**

- Reworded sentence: "There can be significant volatility in market prices for natural gas and oil, and price fluctuations could have a material effect on the financial performance of natural gas and oil producing assets."

**Prior (2024):**

Natural gas and oil prices are affected by supply and demand, both globally and regionally. Factors that influence supply and demand include operational issues, natural disasters, weather, political instability, conflicts, new discoveries, technological advances, economic conditions and actions by major oil-producing countries. There can be significant volatility in market prices for gas and oil, and price fluctuations could have a material effect on the financial performance of gas and oil producing and transmission assets. For example, in a low gas and oil price environment, NEER would generate less revenue from its gas infrastructure investments in gas and oil producing properties, and as a result certain investments might become less profitable or incur losses. Prolonged periods of low oil and gas prices could also result in the delay or cancellation of oil and gas production and transmission projects, could cause projects to experience lower returns, and could result in certain projects becoming impaired, which could materially adversely affect NEE's business, financial condition, results of operations and prospects.

**Current (2025):**

Natural gas and oil prices are affected by supply and demand, both globally and regionally. Factors that influence supply and demand include operational issues, natural disasters, weather, political instability, conflicts, new discoveries, technological advances, economic conditions and actions by major oil-producing countries. There can be significant volatility in market prices for natural gas and oil, and price fluctuations could have a material effect on the financial performance of natural gas and oil producing assets. For example, in a low natural gas and oil price environment, NEER would generate less revenue from its investments in natural gas and oil production properties, and as a result certain investments might become less profitable or incur losses. Additionally, production could be disrupted due to weather or operational issues, among other causes, or drilling efforts could be unsuccessful. Prolonged periods of low oil and gas prices or low production, including from unsuccessful drilling efforts, could also result in the delay or cancellation of natural gas and oil production projects, could cause projects to experience lower returns, and could result in certain assets becoming impaired, which could materially adversely affect NEE's business, financial condition, results of operations and prospects.

---

## Modified: in clean energy projects and reduced project returns, any of which could have a material adverse effect on NEE's and FPL's business, financial condition, results of operations and prospects.

**Key changes:**

- Reworded sentence: "NEE depends heavily on government policies that support clean energy and enhance the economic feasibility of developing and operating clean energy projects in regions in which NEER and FPL operate or plan to develop and operate such facilities."
- Reworded sentence: "and portions of Canada provide incentives, such as tax incentives, RPS or feed-in-tariffs, that support or are designed to support the sale of energy from clean energy facilities, such as wind and solar energy facilities and energy storage facilities."

**Prior (2024):**

The local and national political, regulatory and economic environment has had, and may in the future have, an adverse effect on regulatory decisions with negative consequences for NEE and FPL. These decisions, which may come from any level of government, may require, for example, FPL or NEER to cancel or delay planned development activities, to reduce or delay other planned capital expenditures or to pay for investments or otherwise incur costs that it may not be able to recover through rates or otherwise, each of which could have a material adverse effect on the business, financial condition, results of operations and prospects of NEE and FPL. Any reductions or modifications to, or the elimination of, governmental incentives or policies that support utility scale renewable energy, including, but not limited to, tax laws, policies and incentives, RPS and feed-in-tariffs, or the imposition of additional taxes, tariffs, duties or other assessments on renewable energy or the equipment necessary to generate or deliver it, could result in, among other items, the lack of a satisfactory market for the development and/or financing of new renewable energy projects, NEE and FPL abandoning the development of renewable energy projects, a loss of investments in renewable energy projects and reduced project returns, any of which could have a material adverse effect on NEE and FPL's business, financial condition, results of operations and prospects. 21 21 21 Table of Contents Table of Contents NEE depends heavily on government policies that support utility scale renewable energy and enhance the economic feasibility of developing and operating wind and solar energy projects in regions in which NEER and FPL operate or plan to develop and operate renewable energy facilities. The federal government, a majority of state governments in the U.S. and portions of Canada provide incentives, such as tax incentives, RPS or feed-in-tariffs, that support or are designed to support the sale of energy from utility scale renewable energy facilities, such as wind and solar energy facilities. The development of renewable energy facilities at acceptable prices has not historically been burdened by actions taken by the U.S. government. However, as a result of budgetary constraints, geopolitical factors, political factors or otherwise, governments from time to time may review their laws and policies that support, or do not overly burden, the development and operation of renewable energy facilities and, instead, consider actions that would make the laws and policies less conducive to the development and operation of renewable energy facilities. Any reductions or modifications to, or the elimination of, governmental incentives or policies that support renewable energy, such as the IRA, or the imposition of additional taxes, tariffs, duties or other assessments on renewable energy or the equipment necessary to generate or deliver it, such as policies in place that limit certain imports from China and other Southeast Asian countries, could result in, among other items, the lack of a satisfactory market for the development and/or financing of new renewable energy projects, NEE and FPL abandoning the development of renewable energy projects, a loss of investments in the projects and reduced project returns, any of which could have a material adverse effect on NEE and FPL's business, financial condition, results of operations and prospects.

**Current (2025):**

NEE depends heavily on government policies that support clean energy and enhance the economic feasibility of developing and operating clean energy projects in regions in which NEER and FPL operate or plan to develop and operate such facilities. The federal government, a majority of state governments in the U.S. and portions of Canada provide incentives, such as tax incentives, RPS or feed-in-tariffs, that support or are designed to support the sale of energy from clean energy facilities, such as wind and solar energy facilities and energy storage facilities. The development of clean energy projects at acceptable prices has not historically been burdened by actions taken by the U.S. government. However, as a result of budgetary constraints, geopolitical factors, political factors or otherwise, governments from time to time may review their laws and policies that support, or do not overly burden, the development and operation of clean energy facilities and, instead, consider actions that would make the laws and policies less conducive to the development and operation of such projects. Any reductions or modifications to, or the elimination of, governmental incentives or policies that support clean energy, such as PTCs or ITCs, or the imposition of additional taxes, tariffs, duties or other costs or assessments on clean energy or the equipment necessary to generate, store or deliver it, such as policies in place that limit certain imports from China and other Southeast Asian countries, could result in, among other items, the lack of a satisfactory market for the development and/or financing of new clean energy projects, NEE and FPL abandoning the development of clean energy projects, a loss of investments in the projects and reduced project returns, any of which could have a material adverse effect on NEE's and FPL's business, financial condition, results of operations and prospects.

---

*Data sourced from SEC EDGAR. Last updated 2026-05-10.*