Newmont Corporation: 10-K Risk Factor Changes

2024 vs 2023  ·  SEC EDGAR  ·  2026-05-10
Other years: 2026 vs 2025 · 2025 vs 2024
⚠ AI-Generated

The summary below was generated by an AI language model and may contain errors or omissions. All other content on this page is deterministically extracted from the original SEC EDGAR filing.

Newmont added 13 new risk factors in 2024, predominantly addressing operational hazards at specific assets - particularly the Cadia mine in Australia (waste management, tailings storage, environmental sampling, and parliamentary inquiry) - and geographic exposures in PNG, Canada, and Mexico. The additions also reflect integration risks from the Newcrest acquisition, including post-combination execution and disclosure standard differences between Australian and SEC requirements. Simultaneously, 13 existing risk factors were substantively modified, with changes likely reflecting updated assessments of impairment risks, community relations, illegal mining threats, and Argentine operations, while 30 risks remained unchanged.

✓ Deterministic extraction — no AI-generated data

Classification is based on semantic text similarity scoring and may include approximations. “No match” means no high-confidence textual match was found — not necessarily that a section was removed.

13
New Risks
0
Removed
13
Modified
30
Unchanged
🟢 New in Current Filing

Mining operations involve a high degree of risk, including hazards related to the use of explosives and hazardous chemicals and critical equipment failure.

Our operations are subject to risks associated with the transportation, storage, handling and use of explosives and hazardous chemicals. These include unplanned detonation of explosives and catastrophic release of hazardous chemicals (for example, due to vessel rupture resulting…

Read full text

Our operations are subject to risks associated with the transportation, storage, handling and use of explosives and hazardous chemicals. These include unplanned detonation of explosives and catastrophic release of hazardous chemicals (for example, due to vessel rupture resulting in an explosion or toxic gas release). Critical equipment related risks that apply to various Newmont sites include for example, mill failure arising from catastrophic failure of a component, or unavailability of mine haul fleet. Other critical equipment related risks may be site specific. For example, asset integrity at Lihir may be impacted by the proximity of the mine to a corrosive marine environment. The occurrence of such catastrophic events may result in work stoppages, damage to or destruction of mines and other producing facilities, damage to or loss of life and property, environmental damage and possible legal liability for any or all damage or loss and may adversely affect the Company’s operating results and financial condition 25 25 25 Table of Contents Table of Contents

🟢 New in Current Filing

Waste Rock and Tailings Management

Our gold and copper mining and ore refining/metals extraction processes generate waste by-products such as waste rock (managed in waste rock dumps or, in the case of Lihir, harbor waste rock platforms and permitted barge dumping locations) and tailings (managed by the use of…

Read full text

Our gold and copper mining and ore refining/metals extraction processes generate waste by-products such as waste rock (managed in waste rock dumps or, in the case of Lihir, harbor waste rock platforms and permitted barge dumping locations) and tailings (managed by the use of tailings storage facilities, lacustrine deposition in the case of Brucejack or deep sea tailings placement in the case of Lihir and as proposed at Wafi-Golpu). Tailings storage facilities are constructed progressively throughout the life of the mine to support increasing capacity requirements. If there is a failure in the integrity of a tailings storage facility, there is a risk that tailings or large volumes of water and/or potentially contaminating materials may be released and cause material harm to human health and/or the environment downstream of the facility. Such an occurrence could severely damage our reputation and materially adversely impact our operating results and financial condition. It may also subject us to civil and/or criminal action, penalties and claims from environmental and planning regulators and/or affected third parties, and may lead to the suspension or disruption of our operations and projects. For example, in December 2023 at our Telfer operation in Western Australia, cracking and sinkholes were detected on an internal embankment of the site’s TSF. Upon detection, the Company suspended its processing operations and a prohibition notice limiting the use of the facility was issued by the local regulator. Prolonged or extended limitations on use of the TSF would adversely impact our production and profitability. See also risk factor under the heading "Our operations are dependent on the availability of sufficient water supplies and subject to water-related risk."

🟢 New in Current Filing

Tailings Storage Facilities and Dust Emissions at Cadia

Tailings deposition was suspended at Cadia Holdings Pty Ltd’s (“Cadia Holdings”) tailings storage facilities in March 2018 following an embankment slump of its Northern Tailings Storage Facility (“NTSF”). Use of the NTSF is subject to a prohibition notice issued by the NSW…

Read full text

Tailings deposition was suspended at Cadia Holdings Pty Ltd’s (“Cadia Holdings”) tailings storage facilities in March 2018 following an embankment slump of its Northern Tailings Storage Facility (“NTSF”). Use of the NTSF is subject to a prohibition notice issued by the NSW Resources Regulator and deposition is expected to remain suspended until repairs of the NTSF wall are completed. In December 2019, Cadia Holdings received approval from the New South Wales Department of Planning and Environment (the “NSW DPE”) to fully utilize the decommissioned Cadia Hill mine pit for deposition of thickened tailings. In December 2021, the NSW DPE granted approval to increase the permitted processing capacity from 32 to 35 million tonnes of ore in a calendar year. Such approval is subject to certain conditions, including that Cadia Holdings commission and publish an independent air quality audit report that includes a description of the details and scheduling of all reasonable and feasible best practice measures that are being implemented by Cadia Holdings to minimize off-site air quality impacts of the mine. The independent air quality audit report published by Cadia Holdings in August 2022 indicated that dust emitted from two ventilation exhaust rises which vent emissions from underground processing operations exceeded levels permitted by applicable law. During the quarter ended June 2023, the New South Wales Environment Protection Authority (“NSW EPA”) issued variations to its Environment Protection License (“EPL”), a Prevention Notice and Notices to Provide Information regarding the management of, and investigation into potential breaches relating to, dust emissions and other air pollutants from the Cadia tailings storage facilities and ventilation rises. The license variations largely formalized the actions Cadia Holdings had developed in consultation with the NSW EPA and was already undertaking across a range of measures. Cadia Holdings received a letter from the NSW EPA in June 2023 requiring it to immediately comply with specific statutory requirements and EPL conditions. Adjustments were implemented underground, including a reduction in mining rates, modifications to the ventilation circuit and the installation of additional dust sprays and spray curtains. Additional dust collection units were subsequently installed enabling normal mining rates to be restored. In August 2023, the NSW EPA commenced proceedings in the Land and Environment Court of NSW (the “NSW Land and Environment Court”) against Cadia Holdings, alleging that air emissions from Cadia in March 2022 exceeded the standard of concentration for total solid particles permitted under applicable laws due to the use of surface exhaust fans at the mine. On September 29, 2023, Cadia Holdings entered a plea of guilty and the NSW Land and Environmental Court listed the case for a sentencing hearing on March 28, 2024. On October 13, 2023, the NSW EPA commenced additional proceedings in the NSW Land and Environment Court against Cadia Holdings, alleging two additional contraventions of applicable air emissions requirements in November 2021 and May 2023 and two contraventions related to alleged air pollution from tailings storage facilities on October 13 and 31, 2022. On November 24, 2023 Cadia Holdings entered a plea of guilty to the two additional charges relating to applicable air emissions requirements and the NSW Land and Environmental Court listed the case for a sentencing hearing on March 28, 2024. The proceedings related to alleged air pollution from the tailings storage facilities are adjourned for further directions on February 23, 2024. The NSW EPA’s investigation regarding the management of air emissions from the mine is ongoing. Failure to maintain compliance with applicable law or Cadia Holdings’ EPL may result in the NSW EPA suspending or revoking Cadia Holdings’ EPL, seeking court orders or issuing additional prevention notices to modify or cease certain activities. Ongoing enforcement, and challenges in maintaining compliance, may impact Cadia Holdings’ ability to secure a future expansion of its project approval to extend the life of mine from 2031 to 2055. In addition, Cadia Holdings has previously been, and may in the future be, subject to prosecutions and penalties for noncompliance with air quality requirements or the terms of its EPL, including in respect of emissions from any vent rise or emissions from the NTSF and the Southern Tailings Storage Facility (“STSF”). Operational changes 29 29 29 Table of Contents Table of Contents required to achieve or maintain compliance, including reductions in mining rates and other limitations on mining or processing operations, or additional requirements to install costly pollution control equipment, may adversely impact our operating results and financial condition.

🟢 New in Current Filing

Environmental Sampling in the Cadia Area

In early 2023, residents living near Cadia raised concerns about potential impacts to drinking water supplies by various contaminants, including metals such as lead, nickel and copper, which they allege are related to emissions from the vent rises at Cadia, as well as periodic…

Read full text

In early 2023, residents living near Cadia raised concerns about potential impacts to drinking water supplies by various contaminants, including metals such as lead, nickel and copper, which they allege are related to emissions from the vent rises at Cadia, as well as periodic dust emission events at NTSF and STSF. In response to community concerns, the New South Wales Ministry of Health tested the quality of residents’ kitchen tap water and reported that it was safe to drink. The NSW EPA is also undertaking water testing in the local area and to date, the majority of results from the kitchen tap samples show metal concentrations below the Australian Drinking Water Guidelines values. The majority of the instances of non-compliance from both Cadia Holdings’ and the NSW EPA’s sampling programs showed that such instances of non-compliance were influenced by building and plumbing materials. A particulate characterization study, which was undertaken by the Australian government’s Australian Nuclear Science Technology Organisation (the “ANSTO”) and commissioned by Cadia Holdings in collaboration with the local community, assessed the PM2.5 dust contribution from Cadia to the regional air shed over a 12-month period and concluded that Cadia contributed only a small percentage of soil particulate matter. In fact, soil was determined to be the least significant source of air pollution over the 12-month period, contributing less than 10% to the total PM2.5 mass. The ANSTO study also determined that metals of concern recently identified by the community, such as lead, nickel, selenium and chromium, occurred at very low levels in the PM2.5 fraction and did not exceed any national standard. The report is part of a comprehensive suite of independent air and water quality investigations, including with respect to sampling of drinking water sources, air quality monitoring, dispersion modelling and lead fingerprinting, that have been or are being conducted to determine the source of metals within the local airshed and to assess any health risks to the local community, if any, from air emissions from the Cadia mine site. In light of these developments at Cadia, there is a heightened level of community concern relating to the perceived impact of mining activities on the health of the community, and the condition of residential properties, located in proximity to Cadia. These developments, including community complaints associated with our activities at Cadia could give rise to reputational harm, operational disruptions, increased regulatory scrutiny of mining activities or delays to project development.

🟢 New in Current Filing

New South Wales Parliamentary Inquiry

In July 2023, a New South Wales Parliamentary Inquiry (Legislative Council’s Portfolio Committee No. 2 – Health) (the “Parliamentary Inquiry”) was initiated into current and potential community impacts of gold, silver, lead and zinc mining on human health, land, air and water…

Read full text

In July 2023, a New South Wales Parliamentary Inquiry (Legislative Council’s Portfolio Committee No. 2 – Health) (the “Parliamentary Inquiry”) was initiated into current and potential community impacts of gold, silver, lead and zinc mining on human health, land, air and water quality in New South Wales. The inquiry process included written submissions, public hearings and witness testimony. The committee released its report including non-binding recommendations to the New South Wales Government on December 15, 2023. The government is required to respond to the report within three months. Newmont acknowledges and understands that some local residents living close to Cadia have concerns about dust emissions from Cadia’s tailings storage facilities and ventilation rises. Prior to our acquisition of Newcrest, Newcrest provided a submission to the committee and hosted a number of committee members on a tour of Cadia. Newcrest’s Interim CEO and Cadia’s General Manager also appeared before the committee as witnesses. The Parliamentary Inquiry and the community concerns could give rise to reputational harm, operational disruptions, increased regulatory scrutiny of mining activities and delays to project development.

🟢 New in Current Filing

Our operations and projects are subject to risks related to our relationships and/or agreements with local communities and laws for the protection of cultural heritage.

The Company’s relationships with the communities that are located near its operations or on whose land it operates are essential to the success of its existing operations, exploration activities and the construction and development of its projects. A failure to manage…

Read full text

The Company’s relationships with the communities that are located near its operations or on whose land it operates are essential to the success of its existing operations, exploration activities and the construction and development of its projects. A failure to manage relationships with such communities may lead to local dissatisfaction which, in turn, may lead to interruptions to the Company’s operations, exploration activities and development projects. Specific challenges in community relations include community concerns over management of increased traffic, migratory workforces, environmental impacts and resource depletion, social, environmental and cultural heritage impacts, increasing expectations regarding the level of benefits that communities receive, benefits sharing with Indigenous peoples’ governments, concerns focused on the level of transparency regarding the payment of compensation and the provision of other benefits to affected landholders and the wider community. In particular, opposition by Indigenous communities to the Company’s activities may require modifications to or preclude operation or development of its projects or may require entry into additional agreements with Indigenous communities, which may result in additional costs. Newmont’s current and future operations are subject to a risk that one or more Indigenous communities in the locations in which we may oppose continued operation, further development or new development of its projects or operations. Claims and protests driven by such opposition may disrupt or delay activities, including permitting, at the Newmont’s operations and projects. The negotiation and review of agreements, including components such as business development, participation, co-management and compensation and other benefits, involve complicated and sensitive issues, associated expectations and often competing interests. The nature and subject matter of these negotiations may result in community unrest which, in some instances, may lead to interruptions in our exploration programs, operational activities or delays to project implementation or development. Additionally, the evolving obligations of governments and Indigenous people under international, national and local legislation and international conventions pertaining to the rights of Indigenous people may impact Newmont’s operations and projects. For example, the Government of British Columbia, Canada has adopted the Declaration on the Rights of Indigenous Peoples Act (2019) to 35 35 35 Table of Contents Table of Contents implement the United Nations Declaration on the Rights of Indigenous Peoples ("UNDRIP") in British Columbia, which may impact Red Chris and Brucejack. Our operations are also subject to laws and regulations that provide for the protection and management of cultural heritage in the jurisdictions in which we operate. For example, following the destruction of Indigenous heritage sites at Juukan Gorge in Western Australia in 2020 and the inquiry and reports issued by the Commonwealth Parliament Joint Standing Committee on Northern Australia in 2021, mining companies have come under heightened scrutiny regarding cultural heritage management, including, for example, with respect to their governance and management processes and procedures around cultural heritage, engagement with Indigenous communities and protection of cultural landscapes. Although the parliamentary inquiry focused on Indigenous cultural heritage, laws to protect and manage cultural heritage also cover non-Indigenous (historic) heritage. Another example, in Western Australia, where Telfer and Havieron, in which Newmont holds a 70% interest, are located, a new Aboriginal Cultural Heritage Act 2021 (WA) came into force in 2023, replacing the Aboriginal Heritage Act 1972 (WA) and introducing new offenses and increased penalties aimed at better protecting Aboriginal cultural heritage in Western Australia. In 2023, the WA Premier announced that the Aboriginal Cultural Heritage Act 2021 (WA) will be completely repealed, with an amended Aboriginal Heritage Act 1972 (WA) replacing it. Further, cultural heritage in PNG is protected under the National Cultural Property (Preservation) Act 1965 (PNG). The main government bodies responsible for enforcing this Act are the National Museum and Art Gallery of PNG and the National Cultural Commission. The Lihir operation has a culturally significant site called the Ailaya Rock, located near the mining operations. Significant civil reinforcement work is being undertaken to protect the surrounding area's structural integrity. A failure to maintain the integrity of the surrounding area could inadvertently damage the site, resulting in impacts to community relations and reputation. Newmont’s operations could inadvertently disturb protected cultural heritage assets, resulting in international scrutiny by investors and non-governmental organizations, negative impact on shareholder value, compensation and/or offset claims, increased costs to projects and operations, delays impacting construction or production or project development, court action or other legal proceedings and lasting reputational damage.

🟢 New in Current Filing

Our operations at Lihir and Wafi-Golpu in PNG are subject to political and regulatory risks and other uncertainties.

Our Lihir operation, which comprises an open pit mine that produces gold doré, is located on the island of Aniolam, PNG. We also hold a 50% interest in a joint venture that owns the Wafi-Golpu exploration project (“Wafi-Golpu” and such joint venture, “WGJV”), which is located in…

Read full text

Our Lihir operation, which comprises an open pit mine that produces gold doré, is located on the island of Aniolam, PNG. We also hold a 50% interest in a joint venture that owns the Wafi-Golpu exploration project (“Wafi-Golpu” and such joint venture, “WGJV”), which is located in the province of Morobe, PNG. The current PNG administration, led by Prime Minister James Marape, has stated that it wants to increase benefits for PNG from extractive projects. Potential policy changes could include introducing a new production sharing regime for minerals and oil/gas, amending or replacing the PNG Mining Act of 1992, introducing domestic processing/refining requirements, changing the level and manner of local equity participation in projects and introducing new taxation regimes, banking and foreign exchange controls and/or controls pertaining to the holding of cash and remittance of profits and capital to parent companies. Any such change could impact our operating results and financial condition. In 2020, the PNG Government announced that the special mining lease ("SML") for the Porgera mining operation (a major mining operation in PNG which was owned and operated by the Porgera JV and not Newcrest) would not be renewed. It subsequently amended the Mining Act and issued a new SML for Porgera to Kumul Mineral Holdings Limited (a State-owned company). Since taking this decision, the PNG Government has been working with the Porgera JV participants and other key stakeholders to establish new arrangements for restarting and operating Porgera. During 2023, the parties signed various agreements and the Government passed specific enabling legislation for a restart of operations at Porgera under new commercial terms. The restart occurred in December 2023. The PNG Government has stated that the decision not to renew the Porgera SML is specifically related to environmental damages claims and resettlement at the Porgera mine and has no bearing on any other operations, including Lihir, or advanced exploration projects, including Wafi-Golpu. In 2020, the PNG government prepared and submitted to the National Parliament of PNG (the “PNG Parliament”) a proposed new organic law to introduce a production sharing regime for the mining sector. The proposed organic law will require the approval of a two thirds majority of the PNG Parliament and, if passed in its current proposed form, purports to transfer ownership of minerals from the State of PNG to state-owned entities who would then be responsible for negotiating mineral production sharing arrangements. As currently drafted, the bill containing the proposed organic law will not apply to Lihir, but could potentially apply to Wafi-Golpu if a mining lease or mining development contract is not in place before the effective date for the proposed organic law. Prime Minister Marape has indicated that the law is intended to become effective in 2025. The bill is yet to be debated in the PNG Parliament. On October 29, 2021, Prime Minister Marape announced proposed legislation which, if enacted, would regulate the export of gold from PNG and require that mining companies operating in PNG refine gold with a new national mint. At this stage, it is unclear whether this proposed legislation will become law and, if so, when it would take effect. In addition, in June 2023, the PNG government released a new national gold bullion policy setting out the government’s objective of establishing a domestic gold bullion program to refine gold, hold gold reserves and eventually enter into trading in the world gold market. It is unclear when or how the new national gold bullion policy will be implemented, and how the policy will interact with the legislation proposed in 2021. Under the terms of the Lihir mining development contract, we may be required to refine a portion of our Lihir gold production within PNG if certain quality and security requirements are met and the terms offered are commercially competitive, but it is otherwise free to enter into arms’ length refining contracts with refineries outside of PNG. The PNG government has also announced that it is considering replacing the current PNG Income Tax Act with a new Income Tax Act (the “NITA”) with limited consultation undertaken to date. The latest draft legislation provides that the NITA will come into force from January 1, 2025. It remains uncertain as to whether existing tax attributes of Lihir and Wafi-Golpu will be transitioned under 40 40 40 Table of Contents Table of Contents the new law due to the lack of transitional provisions, key regulations and other key ancillary pieces of legislation. Any adverse changes to the tax laws and regulations will affect Lihir because its Mining Development Contract does not provide protection against income tax law change. Such changes may also affect Wafi-Golpu depending on the terms of any project agreements that may be entered into with the PNG Government. There is also the potential for legal challenges to the Wafi-Golpu permitting process as it progresses towards completion, including by PNG provincial governments, landowner groups and civil society organizations. For example, in March 2021 and December 2022, the governor of Morobe Province and certain residents of the surrounding areas of Wafi-Golpu, respectively, commenced judicial review applications against the State of PNG, challenging the December 2020 grant of the environmental permit for Wafi-Golpu. Both reviews are still to be heard and determined. Any such legal challenges may adversely impact the Wafi-Golpu permitting process. In addition, WGJV is currently engaging with the State of PNG to progress the permitting of Wafi-Golpu and has commenced discussions relating to its application for a special mining lease, which was submitted to the PNG Mineral Resources Authority in 2016. In April 2023, WGJV signed a Framework Memorandum of Understanding with the State of PNG, which confirmed the parties’ intent to proceed with the project at Wafi-Golpu, subject to finalizing the permitting process and approvals of the boards of both Newcrest and Harmony Gold, and progress toward signing a mining development contract, which is a prerequisite to granting a special mining lease. The timing for completing the discussions is uncertain and there is no assurance of the outcomes. Changes in the laws, regulations and policies described above, or to the manner in which they are interpreted or applied to us, may also adversely impact our ability to extend the Lihir special mining lease upon its expiration in 2035.

🟢 New in Current Filing

Our operations in Canada are subject to political and regulatory risks and other uncertainties.

First Nations have made claims in respect of Indigenous rights and title to substantial portions of land and water across Canada, which could impact our exploration projects, and operations at Red Chris, Porcupine, Musselwhite, Éléonore and Brucejack. Some of these claims are…

Read full text

First Nations have made claims in respect of Indigenous rights and title to substantial portions of land and water across Canada, which could impact our exploration projects, and operations at Red Chris, Porcupine, Musselwhite, Éléonore and Brucejack. Some of these claims are made outside of treaty and other processes. The effect of such claims on any particular area of land will not be determinable until the exact nature of historical use, occupancy and rights to such property have been clarified, whether by a decision of the Canadian courts or definition in a treaty or otherwise. First Nations throughout Canada are seeking settlements with respect to these claims, including compensation from governments, and are seeking rights to regulate activities by companies within their traditional territories. The effect of these claims cannot be estimated at this time. The federal and provincial governments in Canada have been seeking to negotiate settlements with respective groups in order to resolve many of these claims, and the government routinely delegates procedural aspects of its duty to consult the First Nations to project proponents, particularly with respect to the permitting process. We hold a 70% interest in the Red Chris operation, which comprises an open pit mine that produces gold, copper and silver concentrate, located in British Columbia, Canada. Our Brucejack operation, which comprises an underground mine that produces gold/silver doré and flotation concentrate and hosts the Valley of the Kings high-grade gold deposit, is also located in British Columbia, Canada. In British Columbia, as well as in Canada more generally, the nature and extent of Indigenous rights and title remains the subject of active debate, claims and litigation issues surrounding Indigenous title and rights remain ongoing. In addition, the government of British Columbia has adopted the UNDRIP and committed to implement UNDRIP in British Columbia, with federal government following suit in 2021 where UNDRIP became federal law in 2021. The provincial and federal legislations commits to systematically review the province’s laws for alignment with UNDRIP principles, while also encouraging new agreements with Indigenous groups that are intended to address outstanding governance questions around the nature of Indigenous rights and title interests in Canada and in British Columbia. In November 2023 a consent-based decision making agreement under section 7 of the UNDRIP was entered into between the government of British Columbia and the Tahltan Central Government (“TCG”) of the Tahltan Nation outlining the process for consent-based decision making for the review of substantial changes to the environmental assessment certificate for the Red Chris mine. The processes outlined in this agreement will apply to changes to the Red Chris environmental assessment certificate relating to the proposed development and operation of the Red Chris block cave mine. Failure or delays in implementing the agreement or to obtain prior informed consent of the TCG may impact the proposed development of the Red Chris block cave mine. Additionally, several First Nations in British Columbia have recently launched challenges against the constitutionality of the “free entry” mineral staking regime in the province and the government of British Columbia pledged to reform the Mineral Tenure Act, which governs the acquisition and holding of mineral tenures in British Columbia, in consultation with First Nations and First Nation organizations. In September 2023, the Supreme Court of British Columbia held that the province of British Columbia has a duty to consult Indigenous groups when registering mineral claims under the Mineral Tenure Act within their traditional territories. The court suspended the implementation of its declaration for 18 months to facilitate the establishment of a mineral claims regime that allows for consultation with Indigenous groups or for the government to amend the Mineral Tenure Act, if necessary. The impacts of these developments on the acquisition and renewal of mineral tenures in British Columbia are not yet known. 41 41 41 Table of Contents Table of Contents

🟢 New in Current Filing

Our Peñasquito operation in Mexico is subject to social, political, regulatory, and economic risks.

Our Peñasquito operation has in the past, and may in the future, be affected significantly and adversely by social, political, regulatory, or economic developments in Mexico. A wide range of general and industry-specific Mexican federal and state environmental laws and…

Read full text

Our Peñasquito operation has in the past, and may in the future, be affected significantly and adversely by social, political, regulatory, or economic developments in Mexico. A wide range of general and industry-specific Mexican federal and state environmental laws and regulations apply to our operations. These laws and regulations are often difficult and costly to comply with and carry substantial penalties for non-compliance. For example, in the State of Zacatecas, Mexico, environmental taxes became effective in 2017 with little clarity on how the taxes are to be calculated. An ecological tax agreement was ratified in 2021 which provides clarity for 2021 to 2024, after which, the Company, along with other companies in the State of Zacatecas, will need to engage with governmental authorities to understand how the environmental tax would be levied year-over-year. Additionally, in May 2023, the Mexican government published several amendments to laws relating to the country's mining industry, which includes changes to Mexico's Mining Law, National Waters Law, General Law of Ecological Equilibrium and Environmental Protection and General Law for the Prevention and Integral Handling of Wastes (“Mining Reform”). The Mining Reform is expected to add significant uncertainty for foreign investors in Mexico and companies operating in the mining sector, including Newmont. As a result of the Mining Reform, we expect that it will be more difficult for us to access/maintain rights to land and water, thereby negatively impacting our mining activities within Mexico, raising concerns around exploration programs, security of concessions, and out of cycle community negotiations. If political and regulatory trends continue in a manner that is increasingly less supportive of mining, it can have an adverse impact on our operations and financial results. On June, 2023, the Company filed an injunction (Amparo) against the reforms, and was served with a provisional suspension to the applicability of several provisions of the Mining Reform on January 2024. Additionally, in February 2024, Mexico's president presented before parliament a series of new constitutional reforms. The proposed reforms include a possible ban on the granting of open pit mining concessions and banning activities related to the exploration, exploitation, benefit or use of minerals or metals using open pit mining methods, and potential limitations on water concessions in certain areas of the country. If proposed reforms were to be enacted it could materially impact our exploration activities and operations at Peñasquito and adversely impact financial results. Production at our Peñasquito operation is dependent upon the efforts of our employees and, consequently, our maintenance of good relationships with our employees. In recent years, we have had several disputes with the National Union of Mine and Metal Workers of the Mexican Republic (“the Union”). Following negotiations in 2022, Newmont and the Union reached a CBA in June 2022 whereby Union represented workforce will participate in uncapped profit-sharing bonus up to 10%, which resulted in increased labor costs. In June 2023, the Union made claims regarding violations of legal regulations and labor agreements (which the Company refuted) and notified the Company of a strike action demanding an increase in the uncapped profit-sharing benefit provided for in the CBA that represented a 100 percent increase equivalent to a 20 percent instead of 10 percent profit-sharing. The Company urged the 42 42 42 Table of Contents Table of Contents Union to abide by the mutually agreed CBA and engaged in dialogue with the Union and the government, but the disagreement remained unresolved until October 2023 when the parties reached a definitive agreement to end the strike. Per the agreement, the Company will pay Peñasquito workers a fixed amount equivalent to approximately 60% of wages for the duration of the strike, and an additional bonus of two months’ wages to be paid out in the second quarter of 2024, given that the Peñasquito mine reported no profit in 2023 as a consequence of the strike. Additionally, as a part of a separate annual negotiation under the Collective Bargaining Agreement, the Company agreed to an annual salary increase of 8% effective as of August 1, 2023, which is in line with the Mexican mining industry wage increases for 2023. From June 2023 to October 2023, Minera Peñasquito suspended operations, which negatively impacted production and revenue. Any failure to successfully resolve future union complaints could result in additional work stoppages and/or other future disruptions in production and labor issues that could adversely affect our operations and financial performance and our ability to achieve expected results and guidance. A deterioration in Mexico’s economy, social instability, political unrest, or other adverse social developments in Mexico could also adversely affect operating results at Peñasquito, as well as the safety and security of the site and workforce. For example, in recent years, Mexico has experienced a period of increasing criminal activity, primarily due to the activities of drug cartels and related criminal organizations, including in the State of Zacatecas. Any increase in the level of violence or a concentration of violence near or around the Peñasquito mine could have an adverse effect on operating results.

🟢 New in Current Filing

Risks Related to the Combined Company Following the Newcrest Transaction

As disclosed in this Form 10-K, on November 6, 2023, Newmont closed its acquisition of Newcrest following receipt of all regulatory approvals and approval by Newmont’s and Newcrest’s shareholders of the resolutions at the shareholder meetings on October 11 and October 13, 2023,…

Read full text

As disclosed in this Form 10-K, on November 6, 2023, Newmont closed its acquisition of Newcrest following receipt of all regulatory approvals and approval by Newmont’s and Newcrest’s shareholders of the resolutions at the shareholder meetings on October 11 and October 13, 2023, respectively. The Newcrest transaction could subject us to significant risks, including those described below.

🟢 New in Current Filing

Significant demands will be placed on the combined company as a result of the combination.

As a result of the Newcrest transaction, significant demands will be placed on the managerial, operational and financial personnel and systems of Newmont. There can be no assurance that the systems, procedures and controls of Newmont will be adequate to support the expansion of…

Read full text

As a result of the Newcrest transaction, significant demands will be placed on the managerial, operational and financial personnel and systems of Newmont. There can be no assurance that the systems, procedures and controls of Newmont will be adequate to support the expansion of operations and associated increased costs and complexity following and resulting from the combination. The future operating results of Newmont will be affected by the ability of our officers and key employees to manage changing business conditions, to integrate Newmont and Newcrest, to implement a new business strategy and to improve our operational and financial controls and reporting systems.

🟢 New in Current Filing

We may not realize the anticipated benefits of the Newcrest transaction and the integration of Newcrest and Newmont may not occur as planned.

The Newcrest transaction was pursued with the expectation that its implementation will result in an increase in sustained profitability, cost savings and enhanced growth opportunities for Newmont. These anticipated benefits will depend in part on whether Newcrest’s and Newmont’s…

Read full text

The Newcrest transaction was pursued with the expectation that its implementation will result in an increase in sustained profitability, cost savings and enhanced growth opportunities for Newmont. These anticipated benefits will depend in part on whether Newcrest’s and Newmont’s operations can be integrated in an efficient and effective manner. The on-going integration of the two companies will present challenges to management, including the integration of systems and personnel of the two companies which may be geographically separated, anticipated and unanticipated liabilities, unanticipated costs (including substantial capital expenditures required by the integration) and the loss of key employees. The performance of operations could be adversely affected if, among other things, Newmont is not able to achieve the anticipated savings and synergies expected to be realized in entering the Newcrest transaction, or retain key employees to assist in the integration and operation of Newcrest and Newmont. The integration of Newmont and Newcrest may pose special risks, including one-time write-offs, restructuring charges and unanticipated costs. In addition, the integration process could result in diversion of the attention of management and disruption of existing relationships with suppliers, employees, customers and other constituencies of Newmont. Although Newmont and its advisors have conducted due diligence on the operations of Newcrest, there can be no guarantee that Newmont is aware of any and all liabilities of Newcrest. For example, the compliance mechanisms and monitoring programs adopted and implemented by Newcrest prior to the Newcrest transaction may not adequately prevent or detect possible violations of environmental, health and safety, taxes, employment, labor standards, money laundering, terrorist financing and other applicable laws and failure by Newcrest to comply with any of the foregoing legislation prior to the Newcrest transaction could result in severe criminal or civil sanctions and may subject Newmont to other liabilities, including fines, prosecution and reputational damage, all of which could have a material adverse effect on the business, consolidated results of operations and consolidated financial condition of Newmont. As a result of these factors, it is possible that certain benefits expected from the Newcrest transaction may not be realized.

🟢 New in Current Filing

Newcrest’s public filings were subject to Australian disclosure standards, which differ from SEC disclosure requirements.

Prior to the Newcrest transaction, Newcrest’s Ore Reserve and Mineral Resource estimates (the “Newcrest Historical Estimates”) have been prepared by Newcrest in accordance with the applicable reporting requirements of, and are based on confidence categories defined in, the…

Read full text

Prior to the Newcrest transaction, Newcrest’s Ore Reserve and Mineral Resource estimates (the “Newcrest Historical Estimates”) have been prepared by Newcrest in accordance with the applicable reporting requirements of, and are based on confidence categories defined in, the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, December 2012 (the “JORC Code”), and the reporting requirements of the ASX Listing Rules Chapter 5, July 2022 (together, “the Australian Standards”), each of which differs from the requirements of Subpart 1300 of Regulation S-K adopted by the SEC (the “S-K 1300 Standard”). The S-K 1300 Standard and the Australian Standards have similar goals in terms of conveying an appropriate level of confidence in the disclosures being reported but embody different approaches and definitions. For example, the terms “Ore Reserve,” “Proved Ore Reserve,” “Probable Ore Reserve,” “Mineral Resource,” “Measured Mineral Resource,” “Indicated Mineral Resource,” and “Inferred Mineral Resource” are Australian mining terms as defined in the JORC Code, and their definitions differ from the definitions of the terms “mineral reserve,” “proven mineral reserve,” “probable mineral reserve,” “mineral resource,” “measured mineral resource,” “indicated mineral resource” and “inferred mineral resource” under the S-K 1300 Standard. “Inferred mineral resources” have a great 46 46 46 Table of Contents Table of Contents amount of uncertainty as to the existence of such resources and their economic and legal feasibility. A significant amount of exploration must be completed in order to determine whether an inferred mineral resource may be upgraded to a higher category. Under the S-K 1300 Standard, a pre-feasibility study, as defined under the S-K 1300 Standard, is typically required to report mineral reserves supported by a discounted cash flow analysis. The requirements for the declaration of mineral reserves under the S-K 1300 Standard are generally stricter than what is acceptable under JORC and have required the reclassification of previously declared mineral reserves to mineral resources, and there have also been adjustments to the amounts of previously declared mineral reserves and resources pending further study work. In addition to such adjustments, the JORC Code allows Measured and Indicated Mineral Resources to be reported inclusive of Mineral Resources modified to produce its Ore Reserves whereas the S-K 1300 Standard requires mineral resources to be reported exclusive of mineral reserves. Future adjustments may occur due to differing standards, required study levels, price assumptions, future divestments and acquisitions and other factors.

🟡 Modified

Our long-lived assets and goodwill could become impaired, which could have a material non-cash adverse effect on our results of operations.

high match confidence

Sentence-level differences:

  • Reworded sentence: "Management makes multiple assumptions in estimating future cash flows, which include production levels based on life of mine plans, future costs of production, estimates of future production levels based on value beyond proven and probable reserves at our operations, prices of metals, the historical experience of our operations and other factors."
  • Added sentence: "We recorded substantial goodwill, primarily as the result of our acquisition of Newcrest in 2023."
  • Added sentence: "We accounted for the acquisition of Newcrest using the acquisition method of accounting, which requires that purchase price is allocated to the underlying tangible and intangible assets acquired and liabilities assumed of Newcrest based on their respective fair market values."
  • Added sentence: "Any excess 23 23 23 Table of Contents Table of Contents purchase price is allocated to goodwill."
  • Added sentence: "Our balance sheet reflects additions to the carrying amount of goodwill recognized in connection with the Newcrest transaction."

Current (2024):

We review our operations for events and circumstances that could indicate that the carrying value of our long-lived assets may not be recoverable. If indicators of impairment are determined to exist at our mine operations, we review the recoverability of the carrying value of…

Read full text

We review our operations for events and circumstances that could indicate that the carrying value of our long-lived assets may not be recoverable. If indicators of impairment are determined to exist at our mine operations, we review the recoverability of the carrying value of long-lived assets by estimating the future undiscounted cash flows expected to result from the use and eventual disposition of the asset. We also review our goodwill for impairment annually and when events or changes in circumstances indicate that the carrying value of a reporting unit exceeds its fair value. Management makes multiple assumptions in estimating future cash flows, which include production levels based on life of mine plans, future costs of production, estimates of future production levels based on value beyond proven and probable reserves at our operations, prices of metals, the historical experience of our operations and other factors. There are numerous uncertainties inherent in estimating production levels of gold, copper, silver, lead and zinc and the costs to mine recoverable reserves, including many factors beyond our control that could cause actual results to differ materially from expected financial and operating results or result in future impairment charges. We may be required to recognize material non-cash charges relating to impairments of long-lived assets and/or goodwill in the future if actual results differ materially from management’s estimates, which include metal prices, our ability to reduce or control production costs or capital costs through strategic mine optimization initiatives, increased costs or decreased production due to regulatory issues or if we do not realize the mineable reserves, resources or exploration potential at our mining properties. Additions to asset retirement costs could result in impairment charges. We recorded substantial goodwill, primarily as the result of our acquisition of Newcrest in 2023. We accounted for the acquisition of Newcrest using the acquisition method of accounting, which requires that purchase price is allocated to the underlying tangible and intangible assets acquired and liabilities assumed of Newcrest based on their respective fair market values. Any excess 23 23 23 Table of Contents Table of Contents purchase price is allocated to goodwill. Our balance sheet reflects additions to the carrying amount of goodwill recognized in connection with the Newcrest transaction. The Company continues to evaluate strategic priorities and deployment of capital to projects in the pipeline. A decision to reprioritize, sell or abandon a development project could result in a future impairment charge. For example, in response to challenging market conditions, which included inflationary pressures and supply chain disruptions, in 2023 the Company announced the deferral for at least two years of the full-funds investment decision for the Yanacocha Sulfides project in Peru. With the delay of the Yanacocha Sulfides project, management will focus on optimizing its allocation of funds to current operations and other capital commitments, while also assessing execution options and project plans options, up to and including transitioning Yanacocha operations into full closure. The Company also periodically updates the economic model for its Conga project to understand changes to the estimated capital costs, cash flows, and economic returns from the project. Certain decisions or changes in circumstances could result in determinations that carrying value is not recoverable and could result in impairment. See Part II, Item 7 under the heading “Critical Accounting Estimates – Carrying value of long-lived assets and Carrying value of Conga” for additional information. If an impairment charge is incurred, such charges are not reversible at a later date even when favorable modifications to our proven and probable reserves and measured, indicated and inferred resources, favorable revisions to environmental obligations, favorable changes in legislation and/or our political or economic environment, or other favorable events occur. As a result of these uncertainties, our operating results may be significantly impacted from both the impairment and the underlying trends in the business that triggered the impairment, and actual results may be less favorable than estimated returns and initial financial outlook. For additional information regarding goodwill, refer to Note 19 to our Consolidated Financial Statements.

View prior text (2023)

We review our operations for events and circumstances that could indicate that the carrying value of our long-lived assets may not be recoverable. If indicators of impairment are determined to exist at our mine operations, we review the recoverability of the carrying value of long-lived assets by estimating the future undiscounted cash flows expected to result from the use and eventual disposition of the asset. We also review our goodwill for impairment annually and when events or changes in circumstances indicate that the carrying value of a reporting unit exceeds its fair value. Management makes multiple assumptions in estimating future cash 22 22 22 Table of Contents Table of Contents flows, which include production levels based on life of mine plans, future costs of production, estimates of future production levels based on value beyond proven and probable reserves at our operations, prices of metals, the historical experience of our operations and other factors. There are numerous uncertainties inherent in estimating production levels of gold, silver, copper, zinc and lead and the costs to mine recoverable reserves, including many factors beyond our control that could cause actual results to differ materially from expected financial and operating results or result in future impairment charges. We may be required to recognize material non-cash charges relating to impairments of long-lived assets and/or goodwill in the future if actual results differ materially from management’s estimates, which include metal prices, our ability to reduce or control production costs or capital costs through strategic mine optimization initiatives, increased costs or decreased production due to regulatory issues or if we do not realize the mineable reserves, resources or exploration potential at our mining properties. Additions to asset retirement costs could result in impairment charges. The Company continues to evaluate strategic priorities and deployment of capital to projects in the pipeline. A decision to reprioritize, sell or abandon a development project could result in a future impairment charge. For example, in response to the current challenging market conditions, which include inflationary pressures and supply chain disruptions, in the third quarter of 2022 the Company announced the delay of the full-funds investment decision for the Yanacocha Sulfides project in Peru. The Company is currently in the process of assessing project plan options for the Yanacocha Sulfides project. The Company also periodically updates the economic model for its Conga project to understand changes to the estimated capital costs, cash flows, and economic returns from the project. Certain decisions or changes in circumstances could result in determinations that carrying value is not recoverable and could result in impairment. See Part II, Item 7 under the heading “Critical Accounting Estimates – Carrying value of long-lived assets and Carrying value of Conga” for additional information. If an impairment charge is incurred, such charges are not reversible at a later date even when favorable modifications to our proven and probable reserves and measured, indicated and inferred resources, favorable revisions to environmental obligations, favorable changes in legislation and/or our political or economic environment, or other favorable events occur. As a result of these uncertainties, our operating results may be significantly impacted from both the impairment and the underlying trends in the business that triggered the impairment, and actual results may be less favorable than estimated returns and initial financial outlook. For additional information regarding goodwill, refer to Note 19 to our Consolidated Financial Statements.

🟡 Modified

Mining companies are increasingly required to consider and provide benefits to the communities and countries in which they operate in order to maintain operations.

high match confidence

Sentence-level differences:

  • Reworded sentence: "These businesses are increasingly required to meaningfully engage with impacted stakeholders; understand and avoid or mitigate negative impacts while optimizing economic participation and uplift opportunities associated with their operations."
  • Reworded sentence: "In Canada, for instance, there is increased expectation that is also increasingly supported by regulations and/or case law for Indigenous communities on whose traditional territories mineral development occurs or is impacted by mineral development to share in the economic prosperity of the mine, and for such communities to share in joint decision making with government regulators on various permitting efforts."

Current (2024):

Greater scrutiny on the private sector broadly and multi-national companies specifically, to contribute to sustainable outcomes in the places where they operate, has led to a proliferation of standards and reporting initiatives focused on environmental stewardship, social…

Read full text

Greater scrutiny on the private sector broadly and multi-national companies specifically, to contribute to sustainable outcomes in the places where they operate, has led to a proliferation of standards and reporting initiatives focused on environmental stewardship, social performance and transparency. Extractive industries, and mining in particular, have seen significant increases in stakeholder expectations. These businesses are increasingly required to meaningfully engage with impacted stakeholders; understand and avoid or mitigate negative impacts while optimizing economic participation and uplift opportunities associated with their operations. The expectation is for companies to create shared value for shareholders, employees, governments, local communities and host countries. Such expectations tend to be particularly focused on companies whose activities are perceived to have high socio-economic and environmental impacts. In Canada, for instance, there is increased expectation that is also increasingly supported by regulations and/or case law for Indigenous communities on whose traditional territories mineral development occurs or is impacted by mineral development to share in the economic prosperity of the mine, and for such communities to share in joint decision making with government regulators on various permitting efforts. Newmont has over many years developed and continues to evolve a robust system of ESG management that includes policies, standards, guidance, assurance, participation in international organizations focused on improved performance and outcomes for host communities and the environment. In Ghana, for instance, in response to resettlement-related complaints, Newmont worked with national and local government authorities, traditional leaders, impacted farmers/landowners and other concerned stakeholders to analyze impacts, extend programs to support vulnerable households and provide enhanced and/or alternative livelihood support. Despite the Company’s commitment to on-going engagement with communities and stakeholders, no assurances can be provided that increased stakeholder expectations will not result in adverse financial and operational impacts to the business, including, without limitation, operational disruption, increased costs, increased investment obligations, increased commitments to local and/or Indigenous communities with fiscal implications, and increased taxes and royalties payable to governments.

View prior text (2023)

Greater scrutiny on the private sector broadly and multi-national companies specifically, to contribute to sustainable outcomes in the places where they operate, has led to a proliferation of standards and reporting initiatives focused on environmental stewardship, social performance and transparency. Extractive industries, and mining in particular, have seen significant increases in stakeholder expectations. These businesses are increasingly required to meaningfully engage with impacted stakeholders; understand and avoid or mitigate negative impacts while optimizing economic development and employment opportunities associated with their operations. The expectation is for companies to create shared value for shareholders, employees, governments, local communities and host countries. Such expectations tend to be particularly focused on companies whose activities are perceived to have high socio-economic and environmental impacts. In response, Newmont has over many years developed and continues to evolve a robust system of ESG management that includes standards, guidance, assurance, participation in international organizations focused on improved performance and outcomes for host communities and the environment. In Ghana, for instance, in response to resettlement-related complaints, Newmont worked with national and local government authorities, traditional leaders, impacted farmers/landowners and other concerned stakeholders to analyze impacts, extend programs to support vulnerable households and provide enhanced livelihood support. Despite the Company’s commitment to on-going engagement with communities and stakeholders, no assurances can be provided that increased stakeholder expectations will not result in adverse financial and operational impacts to the business, including, without limitation, operational disruption, increased costs, increased investment obligations and increased taxes and royalties payable to governments.

🟡 Modified

Illegal mining and artisanal mining occurs on or adjacent to certain of our properties exposing such sites to security risks.

high match confidence

Sentence-level differences:

  • Reworded sentence: "Artisanal, small scale and illegal miners have been active on, or adjacent to, some of Newmont’s African and South American properties, including in Peru, Suriname and Ghana in recent years."
  • Reworded sentence: "While we are working collaboratively with the artisanal miners in Suriname on a program that includes improving mining practices for improved safety, environmental and processing practices as well as alternative livelihood opportunities, this not always possible."
  • Reworded sentence: "Illegal mining could also result in lost gold production and reserves, mine and development stoppages, and have a material adverse effect on financial condition or results of operations or project development."

Current (2024):

Artisanal, small scale and illegal miners have been active on, or adjacent to, some of Newmont’s African and South American properties, including in Peru, Suriname and Ghana in recent years. For example, in Ghana in 2019, illegal miners attacked a field team of security guards…

Read full text

Artisanal, small scale and illegal miners have been active on, or adjacent to, some of Newmont’s African and South American properties, including in Peru, Suriname and Ghana in recent years. For example, in Ghana in 2019, illegal miners attacked a field team of security guards employed by a security contractor, tragically resulting in a fatality. While we are working collaboratively with the artisanal miners in Suriname on a program that includes improving mining practices for improved safety, environmental and processing practices as well as alternative livelihood opportunities, this not always possible. Illegal mining, which involves trespass into the development or operating area of the mine, poses security, safety and environmental issues, which may present a security threat to property and human life. The illegal miners from time to time have clashed with security staff and law enforcement personnel who have attempted to move them away from the facilities. Although, under certain circumstances, artisanal mining may be a legally sanctioned activity, artisanal mining is also associated with a number of negative impacts, including environmental degradation, poor working practices, erosion of civil society, human rights abuse and funding of conflict. The environmental, social, safety and health impacts of artisanal and illegal mining are frequently attributed to formal large scale mining activity, and it is often assumed that artisanally-mined gold is channeled through large-scale mining operators, even though artisanal and large-scale miners normally have separate and distinct supply chains. These misconceptions impact negatively on the reputation of the industry. The activities of the illegal miners could cause damage to Newmont’s properties or result in inappropriate or unlawful use of force for which Newmont could potentially be held responsible. The presence of illegal miners could lead to exploration and project delays and disputes regarding the development or operation of commercial gold deposits. Illegal mining could also result in lost gold production and reserves, mine and development stoppages, and have a material adverse effect on financial condition or results of operations or project development. Finally, it is difficult to separate potential or actual environmental impacts from Newmont's activities from those of artisanal miners who have illegally accessed and are operating on our mine leases. This can cause both reputational and compliance challenges. 27 27 27 Table of Contents Table of Contents

View prior text (2023)

Artisanal and illegal miners have been active on, or adjacent to, some of Newmont’s African and South American properties, including in Suriname and Ghana in recent years. For example, in Ghana in 2019, illegal miners attacked a field team of security guards employed by a security contractor, tragically resulting in a fatality. Illegal mining, which involves trespass into the development or operating area of the mine, is both a security and safety issue, which may present a security threat to property and human life. The illegal miners from time to time have clashed with security staff and law enforcement personnel who have attempted to move them 25 25 25 Table of Contents Table of Contents away from the facilities. Although, under certain circumstances, artisanal mining may be a legally sanctioned activity, artisanal mining is also associated with a number of negative impacts, including environmental degradation, poor working practices, erosion of civil society, human rights abuse and funding of conflict. The environmental, social, safety and health impacts of artisanal and illegal mining are frequently attributed to formal large scale mining activity, and it is often assumed that artisanally-mined gold is channeled through large-scale mining operators, even though artisanal and large-scale miners normally have separate and distinct supply chains. These misconceptions impact negatively on the reputation of the industry. The activities of the illegal miners could cause damage to Newmont’s properties or result in inappropriate or unlawful use of force for which Newmont could potentially be held responsible. The presence of illegal miners could lead to exploration and project delays and disputes regarding the development or operation of commercial gold deposits. Illegal mining and theft could also result in lost gold production and reserves, mine and development stoppages, and have a material adverse effect on financial condition or results of operations or project development.

🟡 Modified

Our operations in Argentina are susceptible to risk as a result of economic and political instability in Argentina and labor unrest.

high match confidence

Sentence-level differences:

  • Reworded sentence: "In 2023, a new National President and a new Governor of Santa Cruz province were elected."
  • Added sentence: "For more information see the risk factor under the heading “Our business depends on good relations with our employees.”"

Current (2024):

There continue to be risks relating to the uncertain and unpredictable political and economic environment in Argentina, especially at the provincial level in Santa Cruz where our Cerro Negro mine is located. In 2023, a new National President and a new Governor of Santa Cruz…

Read full text

There continue to be risks relating to the uncertain and unpredictable political and economic environment in Argentina, especially at the provincial level in Santa Cruz where our Cerro Negro mine is located. In 2023, a new National President and a new Governor of Santa Cruz province were elected. The recent elections have resulted in further uncertainty, significant political change to the country and related protests. The new administration is assessing, and in some cases have already enacted, changes to address the economic challenges in Argentina. Inflation remains a challenge in Argentina. Argentina’s central bank instituted a number of foreign currency controls in an effort to stabilize the local currency, and is also possible to announce further measures in early 2024. For information on Argentina’s foreign currency controls and their effect on our operations, see the section titled “Foreign Currency Exchange Rates” in Item 7, Management’s Discussion and Analysis of Consolidated Financial Condition and Results of Operations. Maintaining operating revenues in Argentine pesos could expose us to the risks of peso devaluation and high domestic inflation. In recent years, we experienced work stoppages by miners represented by unions at the Cerro Negro Mine. Disruptions may arise again in the future with the unions at the Cerro Negro mine or with the local communities and unions that could adversely affect access to, and operations at, the Cerro Negro Mine. For more information see the risk factor under the heading “Our business depends on good relations with our employees.”

View prior text (2023)

There continue to be risks relating to the uncertain and unpredictable political and economic environment in Argentina, especially at the provincial level in Santa Cruz where our Cerro Negro mine is located. Inflation remains a challenge in Argentina and Argentina’s central bank enacted a number of foreign currency controls in 2019 and 2020 in an effort to stabilize the local currency. For information on Argentina’s foreign currency controls and their effect on our operations, see the section titled “Foreign Currency Exchange Rates” in Item 7, Management’s Discussion and Analysis of Consolidated Financial Condition and Results of Operations. Maintaining operating revenues in Argentine pesos could expose us to the risks of peso devaluation and high domestic inflation. In recent years, we experienced work stoppages by miners represented by unions at the Cerro Negro Mine. Disruptions may arise again in the future with the unions at the Cerro Negro mine or with the local communities and unions that could adversely affect access to, and operations at, the Cerro Negro Mine.

🟡 Modified

Our operations at Ahafo and Akyem in Ghana are subject to political, economic and other risks.

high match confidence

Sentence-level differences:

  • Added sentence: "The tenure of the Revised Investments Agreement is linked to the mining leases."
  • Added sentence: "The Akyem mining leases are due to expire in January 2025 and a renewal application has been submitted to the Minerals Commission."
  • Reworded sentence: "To address budgetary deficits, the Government of Ghana initiated measures to generate additional revenue from the mining industry and other sectors of the economy as it attempted to increase revenue collection through various tax audits and investigations, proposed new fees, increased revenue and tax initiatives and other vehicles, such as the Growth and Sustainability Levy, and in 2024, Emissions Levy and VAT on electricity."

Current (2024):

Newmont operates in Ghana pursuant to a Revised Investment Agreement ratified by Ghana’s Parliament in 2015, which established a fixed fiscal and legal regime, including fixed royalty and tax rates, for Newmont operations in Ghana. The financial and tax stability periods…

Read full text

Newmont operates in Ghana pursuant to a Revised Investment Agreement ratified by Ghana’s Parliament in 2015, which established a fixed fiscal and legal regime, including fixed royalty and tax rates, for Newmont operations in Ghana. The financial and tax stability periods established by such agreements expire as early as 2025 for Ahafo and 2027 for Akyem. The tenure of the Revised Investments Agreement is linked to the mining leases. The Akyem mining leases are due to expire in January 2025 and a renewal application has been submitted to the Minerals Commission. The Republic of Ghana has experienced worsening socioeconomic conditions in recent years. The Ghanaian cedi has experienced significant depreciation with inflation accelerating to 54.1% at the end of 2022. Ghana’s credit rating worsened to speculative grade, at near default to default levels, as the Ghanaian Finance Ministry announced suspension of debt service payments in December 2022 on the majority of its external debt, including commercial and bilateral loans, and that Ghana was seeking to restructure its debt. Efforts in early 2023 to put in place a domestic debt exchange program have faced setbacks from pension funds and by individual bond holders leading to amended terms. Continued economic recession and/or unfavorable macroeconomic indicators have also resulted in pressures from the Government of Ghana to obtain more revenue and benefits from mining companies on the back of anti-mining sentiment and perceived inequities that the industry is not contributing its fair share. To address budgetary deficits, the Government of Ghana initiated measures to generate additional revenue from the mining industry and other sectors of the economy as it attempted to increase revenue collection through various tax audits and investigations, proposed new fees, increased revenue and tax initiatives and other vehicles, such as the Growth and Sustainability Levy, and in 2024, Emissions Levy and VAT on electricity. While the second half of 2023 experienced an improvement in the macroeconomic situation with inflation reducing to 23.2% in December 2023, the Ghanaian cedi being relatively stable, with support from the International Monetary Fund and World Bank in early 2024, significant economic risks remain. Other risks include impacts to supply chain, restrictions and local procurement requirements under local content regulations, increase in key commodity prices, more restrictive local banking requirements including requirements for repatriation of proceeds to banks domiciled in Ghana, limitations on capacity of banks to provide reclamation bonds, requests for further local employment requirements, requests for contract renegotiation and increases in contract rates and other costs. Additionally, the government may grant artisanal mining rights or 39 39 39 Table of Contents Table of Contents alternative mining rights, such as sand and gravel, in locations in which the Company has land rights, but no active operations, impacting the Company’s non-operational land positions. Economic setbacks and anti-mining sentiment can also result in an increase in community frustration and friction with artisanal small-scale mining resulting in conflicts, which can negatively impact our operations in Ghana.

View prior text (2023)

Newmont operates in Ghana pursuant to a Revised Investment Agreement ratified by Ghana’s Parliament in 2015, which established a fixed fiscal and legal regime, including fixed royalty and tax rates, for Newmont operations in Ghana. The financial and tax stability periods established by such agreements expire as early as 2025 for Ahafo and 2027 for Akyem. The Republic of Ghana has experienced worsening socioeconomic conditions in recent years. The Ghanaian cedi has experienced significant depreciation with inflation accelerating to 54.1% at the end of 2022. Ghana’s credit rating worsened to speculative grade, at near default to default levels, as the Ghanaian Finance Ministry announced suspension of debt service payments in December 2022 on the majority of its external debt, including commercial and bilateral loans, and that Ghana was seeking to restructure its debt. Efforts in early 2023 to put in place a domestic debt exchange program have faced setbacks from pension funds and by individual bond holders leading to amended terms. Continued economic recession and/or unfavorable macroeconomic indicators have also resulted in pressures from the Government of Ghana to obtain more revenue and benefits from mining companies on the back of anti-mining sentiment and perceived inequities that the industry is not contributing its fair share. To address budgetary deficits, the Government of Ghana has in the past, and is expected in 2023, to initiate measures to generate additional revenue from the mining industry and other sectors of the economy as it attempts to increase revenue collection through various tax audits and investigations, proposed new fees, increased revenue and tax initiatives and other vehicles, such as the proposed Growth and Stabilization Levy as well as new local content regulation. Other risks include impacts to supply chain, restrictions and local procurement requirements, increase in key commodity prices, more restrictive local banking requirements including requirements for repatriation of proceeds to banks domiciled in Ghana, limitations on capacity of banks to provide reclamation bonds, requests for further local employment requirements, requests for contract renegotiation and increases in contract rates and other costs. Additionally, the government may grant artisanal mining rights or alternative mining rights, such as sand and gravel, in locations in which the Company has land rights, but no active operations, impacting the Company’s non-operational land positions. Economic setbacks and anti-mining sentiment can also result in an increase in community frustration and friction with artisanal small-scale mining resulting in conflicts, which can negatively impact our operations in Ghana.

🟡 Modified

Our operations are subject to a range of transitional and physical risks related to climate change.

high match confidence

Sentence-level differences:

  • Reworded sentence: "Unusually dry climates can increase the chance of our operations being impacted by bush or forest fires."
  • Added sentence: "In 2019, Cadia experienced droughts, which resulted in temporary process plant water shortages and lower processed volumes."
  • Added sentence: "In 2023, the Éléonore mine in Quebec Canada had to shut down for several weeks due to prolonged wildfires conditions nearby, and Lihir’s operating and financial performance was impacted by lower feed grade reflecting a higher proportion of low grade material being processed in the second half of the year, following extreme rainfall that limited pit access and caused materials handling issues at the mine crusher."
  • Added sentence: "This followed prolonged drought conditions across the province of New Ireland in PNG, where Lihir is located, which resulted in limited raw water supply to Lihir."
  • Added sentence: "Floods and wildfires have also occurred near Cadia, Telfer, and Red Chris in recent years."

Current (2024):

We believe that climate change has the potential to impact the regions and sites in which Newmont operates, as well as the surrounding communities. Long-term potential physical climate risks include, but are not limited to, higher temperature in all regions, higher intensity…

Read full text

We believe that climate change has the potential to impact the regions and sites in which Newmont operates, as well as the surrounding communities. Long-term potential physical climate risks include, but are not limited to, higher temperature in all regions, higher intensity storm events in all regions, impacts to annual precipitation depending upon the latitude and proximity of the site to oceans, and more extreme heat for sites near the equator or in Australia. Unusually dry climates can increase the chance of our operations being impacted by bush or forest fires. Physical risks related to extreme weather events such as extreme precipitation, flooding, longer wet or dry seasons, flooding and drought conditions, increased temperatures, sea level rise, landslides, mine flooding, tsunami, geysers and outbursts, avalanches, landslides, wildfires or brushfires, or more severe storms may have financial implications for the business. In particular, the effects of changes in rainfall and intensities, water shortages and changing storm patterns have from time to time adversely impacted, and may in the future adversely impact, our costs, production levels and financial performance. For example, we experienced severe flooding in 31 31 31 Table of Contents Table of Contents early 2017 at our Tanami mine in Australia which led to shutdown of operations for several weeks. In 2019, Tanami completed the construction of a natural gas pipeline to deliver fuel to the site to replace diesel fuel that is trucked to the site on roads that regularly flood due to increasing seasonal rainfall. Our operations in Suriname and Peru have also experienced delays in the connection with the delivery of key production supplies due to temporary flooding. In 2019, Cadia experienced droughts, which resulted in temporary process plant water shortages and lower processed volumes. In 2023, the Éléonore mine in Quebec Canada had to shut down for several weeks due to prolonged wildfires conditions nearby, and Lihir’s operating and financial performance was impacted by lower feed grade reflecting a higher proportion of low grade material being processed in the second half of the year, following extreme rainfall that limited pit access and caused materials handling issues at the mine crusher. This followed prolonged drought conditions across the province of New Ireland in PNG, where Lihir is located, which resulted in limited raw water supply to Lihir. Floods and wildfires have also occurred near Cadia, Telfer, and Red Chris in recent years. There is also the potential for disruption to transport routes associated with the distribution of our products. For example, Brucejack’s glacial access road, which is an essential means of entering that mine site, may be subject to a risk of thawing due to the potential for an increase in average temperatures, which may be related to climate change. Severe storm events can also result in unpermitted off-site discharges, slope instability, mine pit erosion and structural failures, tailings storage facility overtopping and other impacts, including water storage and treatment facility capacity considerations. Extended dry seasons or unseasonal dry conditions could exacerbate dust generation from operating activities that may require additional controls for continued operation or result in compliance breaches. Changing climatic conditions may also affect the likelihood of meeting closure success criteria and require adjustments to mine site rehabilitation and closure plans. The higher potential for extreme heat conditions may affect equipment efficiency. For additional information, see risk factors under the headings “Our operations are dependent on the availability of sufficient water supplies and subject to water-related risks” and “Our Company and the mining industry are facing continued geotechnical, geothermal and hydrogeological challenges, which could adversely impact our production and profitability.” Such events can temporarily slow or halt operations due to physical damage to assets, reduced worker productivity for safety protocols on site related to extreme temperatures or lightening events, worker aviation and bus transport to or from the site, and local or global supply route disruptions that may limit transport of essential materials, chemicals and supplies, which could have an adverse impact on our results of operations and financial position. Additional financial impacts could include increased capital or operating costs to increase water storage and treatment capacity, obtain or develop maintenance and monitoring technologies, increase resiliency of facilities and establish supplier climate resiliency and contingency plans. An increase in frequency and duration of extreme weather conditions can be followed by extended power outages. Energy disruptions can have an adverse impact on our results of operations and financial position due to production delays or additional costs to ensure business continuity through reliable sources of on-site power generation. Energy transmission and supply may be impacted by wildfires, such as those that occurred in Australia in 2020, which may interrupt electrical power transmission lines to mine sites, and that may pose risks to on-site facilities and energy generators, fuel dispensing systems and supplies. In jurisdictions that rely on purchased hydroelectric power, such as in Ghana and Peru, extreme drought and extended dry seasons may impact the electric utility’s water supplies needed to generate hydroelectric power purchased by the mine to run operations, which would result in higher costs and/or limit energy availability for continuity of operations as well as impact our environmental systems and processes.

View prior text (2023)

We believe that climate change has the potential to impact the regions and sites in which Newmont operates, as well as the surrounding communities. Long-term potential physical climate risks include, but are not limited to, higher temperature in all regions, higher intensity storm events in all regions, impacts to annual precipitation depending upon the latitude and proximity of the site to oceans, and more extreme heat for sites near the equator or in Australia. Physical risks related to extreme weather events such as extreme precipitation, flooding, longer wet or dry seasons, increased temperatures and drought, landslides, wildfires or brushfires, or more severe storms may have financial implications for the business. For example, we experienced severe flooding in early 2017 at our Tanami mine in Australia which led to shutdown of operations for several weeks. In 2019, Tanami completed the construction of a natural gas pipeline to deliver fuel to the site to replace diesel fuel that is trucked to the site on roads that regularly flood due to increasing seasonal rainfall. Our operations in Suriname and Peru have also experienced delays in the connection with the delivery of key production supplies due to temporary flooding. There is also the potential for disruption to transport routes associated with the distribution of our products. Severe storm events can also result in unpermitted off-site discharges, slope instability, mine pit erosion and structural failures, tailings storage facility overtopping and other impacts, including water storage and treatment facility capacity considerations. Extended dry seasons or unseasonal dry conditions could exacerbate dust generation from operating activities that may require additional controls for continued operation or result in compliance breaches. Changing climatic conditions may also affect the likelihood of meeting closure success criteria and require adjustments to mine site rehabilitation and closure plans. The higher potential for extreme heat conditions may affect equipment efficiency. For additional information, see risk factors under the headings “Our operations are dependent on the availability of sufficient water supplies and subject to water-related risks” and “Our Company and the mining industry are facing continued geotechnical challenges, which could adversely impact our production and profitability.” Such events can temporarily slow or halt operations due to physical damage to assets, reduced worker productivity for safety protocols on site related to extreme temperatures or lightening events, worker aviation and bus transport to or from the site, and local or global supply route disruptions that may limit transport of essential materials, chemicals and supplies, which could have an adverse impact on our results of operations and financial position. Additional financial impacts could include increased capital or operating costs to increase water storage and treatment capacity, obtain or develop maintenance and monitoring technologies, increase resiliency of facilities and establish supplier climate resiliency and contingency plans. An increase in frequency and duration of extreme weather conditions can be followed by extended power outages. Energy disruptions can have an adverse impact on our results of operations and financial position due to production delays or additional costs to ensure business continuity through reliable sources of on-site power generation. Energy transmission and supply may be impacted by wildfires, such as those that occurred in Australia in 2020, which may interrupt electrical power transmission lines to mine sites, and that may pose risks to on-site facilities and energy generators, fuel dispensing systems and supplies. In jurisdictions that rely on purchased hydroelectric power, such as in Ghana and Peru, extreme drought and extended dry seasons may impact the electric utility’s 28 28 28 Table of Contents Table of Contents water supplies needed to generate hydroelectric power purchased by the mine to run operations, which would result in higher costs and/or limit energy availability for continuity of operations as well as impact our environmental systems and processes.

🟡 Modified

New or changing legislation and tax risks in certain operating jurisdictions could negatively affect us.

high match confidence

Sentence-level differences:

  • Reworded sentence: "For instance, a 12% export duty was imposed by the Argentina government in 2018, revised down to 8% thereafter, however, with the election of new government in 2023, the rate is now currently 0% with the expectation it will increase again to 8% in the near future upon the ratification of new laws awaiting approval by the Argentina government."
  • Reworded sentence: "For example, NGM could be impacted by the resolutions brought to the State of Nevada Legislature to amend the State Constitution to increase mining taxes."
  • Reworded sentence: "In 2024, Pillar II is set to take effect."

Current (2024):

We have operations and conduct business in a number of jurisdictions, which may increase our susceptibility to sudden tax changes. For instance, a 12% export duty was imposed by the Argentina government in 2018, revised down to 8% thereafter, however, with the election of new…

Read full text

We have operations and conduct business in a number of jurisdictions, which may increase our susceptibility to sudden tax changes. For instance, a 12% export duty was imposed by the Argentina government in 2018, revised down to 8% thereafter, however, with the election of new government in 2023, the rate is now currently 0% with the expectation it will increase again to 8% in the near future upon the ratification of new laws awaiting approval by the Argentina government. The state of New South Wales, Australia, passed 2023 legislation that imposes an increased stamp duty which materially affected the Newcrest transaction. Also in Australia, the proposed introduction of a Debt Deduction Creation Rule is currently being considered by Parliament, which could have the potential to limit the tax deductibility of intercompany interest expense. In the State of Zacatecas, Mexico, environmental taxes became effective in 2017 with little clarity on how the taxes are to be calculated. An ecological tax agreement was ratified in 2021 which provides clarity for 2021 to 2024, after which, the Company, along with other companies in the State of Zacatecas, will need to engage with governmental authorities to understand how the environmental tax would be levied year-over-year. Also, in Mexico, a 2021 tax reform bill proposed federal fees on revenue generated from mining which could impact our operations if passed. Furthermore, a new Economic Plan for 2022 (the "Proposal") was enacted. While the changes under the Proposal are not substantive in nature (in the sense that they do not create new taxes or increase applicable rates), they may increase the future cost of our compliance and pose additional uncertainties in application of the law. In the United States, at the federal and state level, regulatory changes which may be implemented in the area of tax reform remain uncertain and may adversely affect companies in the mining sector. For example, NGM could be impacted by the resolutions brought to the State of Nevada Legislature to amend the State Constitution to increase mining taxes. An example of this was the passing of Assembly Bill 495 in 2021 that results in a new excise tax on mining companies engaged in the business of extracting gold and silver in the state of Nevada. In 2024, Pillar II is set to take effect. The Pillar II agreement was signed by 138 countries with the intent to equalize corporate tax around the world by implementing a global minimum tax of 15%. As Newmont primarily does business in jurisdictions with a tax rate greater than 15%, the Company does not anticipate a material impact to its financial statements. A number of changes in the laws, regulations and policies in PNG have recently been proposed or are currently being considered. See the risk factor under the heading “Our operations at Lihir and Wafi-Golpu in PNG are subject to political and regulatory risks and other uncertainties”. Taxation laws and other regulations of the jurisdictions in which we operate are complex, subject to varying interpretations and applications by the relevant tax authorities and 37 37 37 Table of Contents Table of Contents subject to changes and revisions in the ordinary course. It is difficult to predict whether proposed changes to regulations will be passed or to what extent they will impact the Company. Any additional and/or unexpected taxes imposed on us could have a material and adverse impact on our Company. See also the risk factor under the heading “Our operations are subject to a range of risks related to transitioning the business to meet regulatory, societal and investor expectations for operating in a low-carbon economy” for a discussion of uncertainties and potential tax increases in connection with climate change considerations.

View prior text (2023)

We have operations and conduct business in a number of jurisdictions, which may increase our susceptibility to sudden tax changes. For instance, a 12% export duty was imposed by the Argentine government in 2018, revised down to 8% thereafter, which could affect our Argentine operations. In the province of Santa Cruz, Argentina, a local procurement law was passed in 2021 requiring extractive industries to procure at least 50% of their goods and services from registered local providers, which could further impact our operational results. In the State of Zacatecas, Mexico, environmental taxes became effective in 2017 with little clarity on how the taxes are to be calculated. An ecological tax agreement was ratified in 2021 which provides clarity for 2021 to 2024, after which, the Company, along with other companies in the State of Zacatecas, will need to engage with governmental authorities to understand how the environmental tax would be levied year-over-year. Also, in Mexico, a 2021 tax reform bill proposed federal fees on revenue generated from mining which could impact our operations if passed. Furthermore, a new Economic Plan for 2022 (the "Proposal") was enacted. While the changes under the Proposal are not substantive in nature (in the sense that they do not create new taxes or increase applicable rates), they may increase the future cost of our compliance and pose additional uncertainties in application of the law. In the United States, at the federal and state level, regulatory changes which may be implemented in the area of tax reform remain uncertain and may adversely affect companies in the mining sector. For example, NGM could be impacted by the resolutions before the State of Nevada Legislature to amend the State Constitution to increase mining taxes. An example of this was the passing of Assembly Bill 495 in 2021 that results in a new excise tax on mining companies engaged in the business of extracting gold and silver in the state of Nevada. Taxation laws and other regulations of the jurisdictions in which we operate are complex, subject to varying interpretations and applications by the relevant tax authorities and subject to changes and revisions in the ordinary course. It is difficult to predict whether proposed changes to regulations will be passed or to what extend they will impact the Company. Any additional and/or unexpected taxes imposed on us could have a material and adverse impact on our Company. See also the risk factor under the heading “Our operations are subject to a range of risks related to transitioning the business to meet regulatory, societal and investor expectations for operating in a low-carbon economy” for a discussion of uncertainties and potential tax increases in connection with climate change considerations.

🟡 Modified

A substantial or extended decline in gold, copper, silver, lead or zinc prices would have a material adverse effect on us.

high match confidence

Sentence-level differences:

  • Reworded sentence: "Our business is dependent on the prices of gold, copper, silver, lead and zinc, which fluctuate on a daily basis and are affected by numerous factors beyond our control."
  • Reworded sentence: "dollar; •The monetary policies employed by the world’s major Central Banks; •The fiscal policies employed by the world’s major industrialized economies; •Expectations of the future rate of inflation; •Interest rates; •Recession or reduced economic activity in the United States, Australia, China, India and other industrialized or developing countries; •Decreased industrial, jewelry, base metal or investment demand; •Increased import and export taxes; •Increased supply from production, disinvestment and scrap; •Forward sales by producers in hedging or similar transactions; •Availability of cheaper substitute materials; and •Changing investor or consumer sentiment, including in connection with transition to a low-carbon economy, investor interest in crypto currencies and other investment alternatives and other factors."

Current (2024):

Our business is dependent on the prices of gold, copper, silver, lead and zinc, which fluctuate on a daily basis and are affected by numerous factors beyond our control. Factors tending to influence prices include: •Gold sales, purchases or leasing by governments and central…

Read full text

Our business is dependent on the prices of gold, copper, silver, lead and zinc, which fluctuate on a daily basis and are affected by numerous factors beyond our control. Factors tending to influence prices include: •Gold sales, purchases or leasing by governments and central banks; •Speculative short positions taken by significant investors or traders in gold, copper, silver, lead, zinc or other metals; •The relative strength of the U.S. dollar; •The monetary policies employed by the world’s major Central Banks; •The fiscal policies employed by the world’s major industrialized economies; •Expectations of the future rate of inflation; •Interest rates; •Recession or reduced economic activity in the United States, Australia, China, India and other industrialized or developing countries; •Decreased industrial, jewelry, base metal or investment demand; •Increased import and export taxes; •Increased supply from production, disinvestment and scrap; •Forward sales by producers in hedging or similar transactions; •Availability of cheaper substitute materials; and •Changing investor or consumer sentiment, including in connection with transition to a low-carbon economy, investor interest in crypto currencies and other investment alternatives and other factors. Average gold prices for 2023 were $1,941 per ounce (2022: $1,800; 2021: $1,799), average copper prices for 2023 were $3.85 per pound (2022: $3.99; 2021: $4.23), average silver prices for 2023 were $23.35 per ounce (2022: $21.73; 2021: $25.12), average lead prices for 2023 were $0.97 per pound (2022: $0.98; 2021: $1.00), and average zinc prices for 2023 were $1.20 per pound (2022: $1.58; 2021: $1.36). Any decline in our realized prices adversely impacts our revenues, net income and operating cash flows, particularly in light of our strategy of not engaging in hedging transactions with respect to sales of gold, copper, silver, lead or zinc. We have recorded impairments in the current year and may experience additional impairments in future years as a result of lower gold, copper, silver, lead or zinc prices. In addition, sustained lower gold, silver, copper, zinc or lead prices can: •Reduce revenues further through production declines due to cessation of the mining of deposits, or portions of deposits, that become uneconomic at sustained lower metal prices; •Reduce or eliminate the profit that we currently expect from ore stockpiles and ore on leach pads and increase the likelihood and amount that the Company might be required to record write downs related to the carrying value of its stockpiles and ore on leach pads; •Halt or delay the development of new projects; 16 16 16 Table of Contents Table of Contents •Reduce funds available for exploration and advanced projects with the result that depleted reserves may not be replaced; and •Reduce existing reserves by removing ores from reserves that can no longer be economically processed at prevailing prices.

View prior text (2023)

Our business is dependent on the prices of gold, silver, copper, zinc and lead, which fluctuate on a daily basis and are affected by numerous factors beyond our control. Factors tending to influence prices include: •Gold sales, purchases or leasing by governments and central banks; •Speculative short positions taken by significant investors or traders in gold, copper, silver, lead, zinc or other metals; •The relative strength of the U.S. dollar; •The monetary policies employed by the world’s major Central Banks; •The fiscal policies employed by the world’s major industrialized economies; •Expectations of the future rate of inflation; •Interest rates; •Recession or reduced economic activity in the United States, China, India and other industrialized or developing countries; •Decreased industrial, jewelry, base metal or investment demand; •Increased import and export taxes; •Increased supply from production, disinvestment and scrap; •Forward sales by producers in hedging or similar transactions; •Availability of cheaper substitute materials; and •Changing investor or consumer sentiment, including in connection with transition to a low-carbon economy, investor interest in crypto currencies and other investment alternatives and other factors. 15 15 15 Table of Contents Table of Contents Average gold prices for 2022 were $1,800 per ounce (2021: $1,799; 2020: $1,770), average copper prices for 2022 were $3.99 per pound (2021: $4.23; 2020: $2.80), average silver prices for 2022 were $21.73 per ounce (2021: $25.12; 2020: $20.55), average lead prices for 2022 were $0.98 per pound (2021: $1.00; 2020: $0.83) and average zinc prices for 2022 were $1.58 per pound (2021: $1.36; 2020: $1.03). Any decline in our realized prices adversely impacts our revenues, net income and operating cash flows, particularly in light of our strategy of not engaging in hedging transactions with respect to sales of gold, silver, copper, lead or zinc. We have recorded impairments in the current year and may experience additional impairments in future years as a result of lower gold, silver, copper, zinc or lead prices. In addition, sustained lower gold, silver, copper, zinc or lead prices can: •Reduce revenues further through production declines due to cessation of the mining of deposits, or portions of deposits, that become uneconomic at sustained lower metal prices; •Reduce or eliminate the profit that we currently expect from ore stockpiles and ore on leach pads and increase the likelihood and amount that the Company might be required to record write downs related to the carrying value of its stockpiles and ore on leach pads; •Halt or delay the development of new projects; •Reduce funds available for exploration and advanced projects with the result that depleted reserves may not be replaced; and •Reduce existing reserves by removing ores from reserves that can no longer be economically processed at prevailing prices

🟡 Modified

We may be unable to obtain or retain necessary permits, leases, or other types of land tenure, which could adversely affect our operations.

high match confidence

Sentence-level differences:

  • Added sentence: "New or amended permits may also be required to continue existing activities, as new laws come into effect or regulators change their application of laws."
  • Reworded sentence: "Certain of our mining and processing operations, including tailings storage, and project expansion and development activities require mineral and/or surface properties that are leased or otherwise granted to the Company for a specific period of time."
  • Reworded sentence: "Following advancement of the life of mine tailings study to explore options for continued tailings deposition, the Company decided to expand the existing F1/F3 Residue Disposal Area ("RDA") from an ultimate capacity of 600Mt to 750Mt to provide storage capacity to 2029, subject to permitting and other approvals, and approved commencement of studies for a new nearby tailings facility, termed RDA2."

Current (2024):

Our mining and processing operations and development and exploration activities are subject to extensive permitting requirements. The requirements to obtain and/or achieve or maintain full compliance with such permits can be costly and involve extended timelines. While we strive…

Read full text

Our mining and processing operations and development and exploration activities are subject to extensive permitting requirements. The requirements to obtain and/or achieve or maintain full compliance with such permits can be costly and involve extended timelines. While we strive to obtain and comply with all permits required of us, there can be no assurance that we will obtain all such permits and/or achieve or maintain full compliance with such permits at all times. Previously obtained permits may be suspended or revoked for a number of reasons, including through government or court action. New or amended permits may also be required to continue existing activities, as new laws come into effect or regulators change their application of laws. Failure to obtain and/or comply with required permits can have serious consequences, including damage to our reputation; cessation of the development of a project; increased costs of development or production and litigation or regulatory action, any of which could materially adversely affect our business, results of operations or financial condition. Our ability to obtain the required permits and approvals to explore for, develop and operate mines and to successfully operate near communities in the jurisdictions in which we operate depends in part on our ability to develop, operate and close mines in a manner that is consistent with the creation of social and economic benefits in the surrounding communities, which may or may not be required by law. Our ability to obtain permits and approvals and to operate near certain communities may be adversely impacted by real or perceived detrimental events associated with our activities or those of other mining companies affecting the environment, health and safety of communities in which we operate. Key permits and approvals may be revoked or suspended or may be adjusted in a manner that adversely affects our operations, including our ability to explore or develop properties, commence production or continue operations. Permit review and approval could be delayed, adversely impacting project implementation due to delays in review and development of permits from limited resources at the regulatory agencies. Certain of our mining and processing operations, including tailings storage, and project expansion and development activities require mineral and/or surface properties that are leased or otherwise granted to the Company for a specific period of time. Obtaining and/or maintaining, extending, and renewing the Company’s rights, titles, or interests ("Legal Title") in and to these properties can be costly, subject to political and social risks, and no assurance can be provided that all necessary leases or other types of land tenure will be granted, maintained, extended, or renewed. For example, additional tailings capacity is needed to support future growth and sustainability of Boddington operations beyond 2025. Boddington’s existing tailings facility is expected to reach the permitted capacity in 2026. Following advancement of the life of mine tailings study to explore options for continued tailings deposition, the Company decided to expand the existing F1/F3 Residue Disposal Area ("RDA") from an ultimate capacity of 600Mt to 750Mt to provide storage capacity to 2029, subject to permitting and other approvals, and approved commencement of studies for a new nearby tailings facility, termed RDA2. The cost and viability of other options remains uncertain at this time. The Company continues to work through incorporating the requirements of the GISTM. Further, the Boddington operation is primarily located on mining leases with renewal dates commencing in 2028. The lease renewal, as well as additional leases required in connection with tailings expansion, require cooperation and agreements with third parties. No assurances can be provided that such renewals and additional lease scope for 26 26 26 Table of Contents Table of Contents further tailings capacity will be secured at similar cost, commercially reasonable terms, or at all. A failure to secure agreement on commercially reasonable terms could result in increased costs, requirements to move infrastructures, modification to future plans, including cessation of mining. Similarly, the current capacity of the TSFs at Cadia should support operations through to late 2029 by exhausting capacity within the current Pit TSF ("PTSF") and by constructing a raise to the South Tailings Storage Facility ("STSF"), as has been permitted. Studies evaluating potential options to increase tailings storage capacity are underway, including the proposal to construct an extension to the current STSF "STSFX") to provide capacity to approximately 2050. Failure to obtain necessary leases and other types of land tenure can have serious consequences, including loss of Legal Title in and to mineral and/or surface properties that are owned or controlled by the Company, cessation of operations and processing or the development of a project and/or increased costs, litigation or regulatory action, any of which could materially adversely affect our business, results of operations or financial condition. See also the risk factors under the headings “Our Company and the mining industry are facing continued geotechnical, geothermal and hydrogeological challenges, which could adversely impact our production and profitability,” and “Title to some of our properties may be insufficient, defective, or challenged”.

View prior text (2023)

Our mining and processing operations and development and exploration activities are subject to extensive permitting requirements. The requirements to obtain and/or achieve or maintain full compliance with such permits can be costly and involve extended timelines. While we strive to obtain and comply with all permits required of us, there can be no assurance that we will obtain all such permits and/or achieve or maintain full compliance with such permits at all times. Previously obtained permits may be suspended or revoked for a number of reasons, including through government or court action. Failure to obtain and/or comply with required permits can have serious consequences, including damage to our reputation; cessation of the development of a project; increased costs of development or production and litigation or regulatory action, any of which could materially adversely affect our business, results of operations or financial condition. Our ability to obtain the required permits and approvals to explore for, develop and operate mines and to successfully operate near communities in the jurisdictions in which we operate depends in part on our ability to develop, operate and close mines in a manner that is consistent with the creation of social and economic benefits in the surrounding communities, which may or may not be required by law. Our ability to obtain permits and approvals and to operate near certain communities may be adversely impacted by real or perceived detrimental events associated with our activities or those of other mining companies affecting the environment, health and safety of communities in which we operate. Key permits and approvals may be revoked or suspended or may be adjusted in a manner that adversely affects our operations, including our ability to explore or develop properties, commence production or continue operations. Permit review and approval could be delayed, adversely impacting project implementation due to delays in review and development of permits from limited resources at the regulatory agencies. Certain of our mining and processing operations, including tailings storage, and project expansion and development activities require the lease of land, rights and properties. Obtaining and/or maintain and renewing lease arrangements can be costly, and no assurance can be provided that all necessary lease arrangements and renewals will be achieved or maintained at all times. For example, additional tailings capacity is needed to support future growth and sustainability of Boddington operations beyond 2025. Boddington’s existing tailings facility is expected to reach the permitted capacity in 2026. As the Company continues to work through incorporating the requirements of the GISTM, the life of mine tailings study has been re-initiated to explore options for tailings deposition. This study is due to be completed in 2023 and requires extensive environmental assessment. As such, the cost and viability of other options remains uncertain at this time. Further, the Boddington operation is primarily located on mining leases with renewal dates commencing in 2028 and no assurances can be provided that such renewals and additional lease scope for further tailings capacity will be secured at similar cost or at all. Failure to obtain necessary leases can have serious consequences, including cessation of operations and processing or the development of a project and/or increased costs, litigation or regulatory action, any of which could materially adversely affect our business, results of operations or financial condition. See also the risk factors under the headings “Our Company and the mining industry are facing continued geotechnical challenges, which could adversely impact our production and profitability,” and “Title to some of our properties may be insufficient, defective, or challenged”.

🟡 Modified

Our operations and business have in the past been affected by the COVID-19 pandemic, and may be materially and adversely impacted in the future by pandemics, epidemics and other health emergencies.

high match confidence

Sentence-level differences:

  • Reworded sentence: "For example, the global COVID-19 pandemic significantly impacted our operations in 2020 and 2021, and to a lesser extent in 2022."
  • Reworded sentence: "In addition, the Company incurred costs during 2020 and 2021 as a result of actions taken to protect against the impact of the COVID-19 pandemic and comply with local mandates, and could be required to incur such costs in the future."
  • Removed sentence: "The Company incurred, and could continue to incur costs as a result of actions taken to protect against the impacts of the COVID-19 pandemic and to comply with local mandates, including but not limited additional health screenings, incremental travel, security and employee-related costs."
  • Removed sentence: "Other impacts of changing government restrictions and the evolving health environment in connection with pandemics, epidemics or health outbreaks and emergencies could include prolonged travel restraints, more stringent shipment restraints, delays in product refining and smelting due to restrictions or temporary closures, other supply chain disruptions and workforce interruptions, including loss of life, and reputational damage in connection with challenges or reactions to action or perceived inaction by the Company, which could have a material adverse effect on the Company’s cash flows, earnings, results of operations and financial position."

Current (2024):

The Company faces risks related to health epidemics and other outbreaks of communicable diseases, which could significantly disrupt operations and may materially and adversely affect its business and financial conditions. For example, the global COVID-19 pandemic significantly…

Read full text

The Company faces risks related to health epidemics and other outbreaks of communicable diseases, which could significantly disrupt operations and may materially and adversely affect its business and financial conditions. For example, the global COVID-19 pandemic significantly impacted our operations in 2020 and 2021, and to a lesser extent in 2022. In order to protect nearby communities and align with government travel restrictions or health considerations, certain of Newmont’s operations were temporarily put into care and maintenance resulting in a temporary decrease in production at these sites in 2020 and 2021. Additionally, the majority of our sites experienced pandemic-related absenteeism in 2021 and early 2022. In addition, the Company incurred costs during 2020 and 2021 as a result of actions taken to protect against the impact of the COVID-19 pandemic and comply with local mandates, and could be required to incur such costs in the future. Reductions in our operational activities due to COVID-19, or another pandemic, epidemic or health outbreak, could result in additional sites being placed into care and maintenance for extended periods of time and/or have a material adverse impact on our business, or financial condition, results of operations and cash flows. If the majority of our sites are placed into care and maintenance, this could significantly reduce our cash flow and impact our ability to meet certain covenants related to our revolving credit facility and borrowing capacity.

View prior text (2023)

The Company faces risks related to health epidemics and other outbreaks of communicable diseases, which could significantly disrupt operations and may materially and adversely affect its business and financial conditions. The global COVID-19 pandemic has had major impacts on the world, our industry and our Company. Despite protocols we have developed and deployed, COVID-19 and its variants present ongoing risks and challenges, and could continue to impact our people, operations and surrounding Communities. Efforts to control the spread of COVID-19 impacted the operation of Newmont’s mines and the development of projects and exploration activities and may continue to do so in the future. The governments in many of the jurisdictions in which we operate implemented restrictive measures such as travel bans, quarantine and self-isolation at various times during the pandemic and may do so again in the future. The scope and duration of any such restrictions remains outside of the Company’s control. The Company carefully considers government restrictions and the needs of its employees and host communities. Additionally, based upon evolving contagion rates or occurrences at our operating sites, senior management or the Board may be required to or decide to reduce or limit operational activities to essential care and maintenance procedures including the management of critical environmental systems. For example, in order to protect nearby communities and align with government travel restrictions or health considerations certain of Newmont’s operations were temporarily put into care and maintenance resulting in a temporary decrease in production at these sites in 2020 and 2021. Additionally, the majority of our sites experienced pandemic-related absenteeism in 2021 and early 2022. Reductions in our operational activities due to COVID-19, or another pandemic, epidemic or health outbreak, could result in additional sites being placed 19 19 19 Table of Contents Table of Contents into care and maintenance for extended periods of time and/or have a material adverse impact on our business, or financial condition, results of operations and cash flows. If the majority of our sites are placed into care and maintenance, this could significantly reduce our cash flow and impact our ability to meet certain covenants related to our revolving credit facility and borrowing capacity. The Company incurred, and could continue to incur costs as a result of actions taken to protect against the impacts of the COVID-19 pandemic and to comply with local mandates, including but not limited additional health screenings, incremental travel, security and employee-related costs. Other impacts of changing government restrictions and the evolving health environment in connection with pandemics, epidemics or health outbreaks and emergencies could include prolonged travel restraints, more stringent shipment restraints, delays in product refining and smelting due to restrictions or temporary closures, other supply chain disruptions and workforce interruptions, including loss of life, and reputational damage in connection with challenges or reactions to action or perceived inaction by the Company, which could have a material adverse effect on the Company’s cash flows, earnings, results of operations and financial position.

🟡 Modified

Our business depends on good relations with our employees.

high match confidence

Sentence-level differences:

  • Reworded sentence: "For example, in recent years, there have been work stoppages by miners represented by unions at our Peñasquito, Cerro Negro and Merian mines, which have disrupted operations."
  • Reworded sentence: "Although 99.8% of eligible employees accepted the new fixed term contract and, received severance for their years of service, following implementation of the new employment model, the two unions requested and were granted new collective bargaining certificates from Ghana’s Chief Labor Officer for bargaining rights for the class of workers to be represented."
  • Reworded sentence: "In Suriname, the collective bargaining with the union for our Merian mine was entered into in 2023, and will expire in 2025."
  • Added sentence: "The current collective bargaining agreement will expire on 2024."
  • Added sentence: "Red Chris has a unionized workforce and has a collective agreement in place from April 2023 until April 2025."

Current (2024):

Production at our mines is dependent upon the efforts of our employees and, consequently, our maintenance of good relationships with our employees. Due to union activities or other employee actions, we could experience labor disputes, work stops or other disruptions in…

Read full text

Production at our mines is dependent upon the efforts of our employees and, consequently, our maintenance of good relationships with our employees. Due to union activities or other employee actions, we could experience labor disputes, work stops or other disruptions in production that could adversely affect us. For example, in recent years, there have been work stoppages by miners represented by unions at our Peñasquito, Cerro Negro and Merian mines, which have disrupted operations. Certain regions in which we operate, including Central and Latin America, have witnessed notable trends in labor relations, including increasing emphasis on workers' rights and labor protections. Governments and civil society organizations have been advocating for improved labor standards, wages and working conditions, leading to the implementation of new labor laws and regulations in a number of jurisdictions. Additionally, collective bargaining has gained prominence as a means to negotiate and secure favorable terms for workers. At December 31, 2023, various unions represented approximately 31.2% of our employee workforce worldwide. In 2022, Newmont implemented a new employment model in Ghana converting permanent employees into two-year fixed term contracts. Although 99.8% of eligible employees accepted the new fixed term contract and, received severance for their years of service, following implementation of the new employment model, the two unions requested and were granted new collective bargaining certificates from Ghana’s Chief Labor Officer for bargaining rights for the class of workers to be represented. The two unions are litigating for bargaining rights to be determined based on membership numbers resulting in targeted efforts to increase membership and a writ of summons, which is expected to be heard in February 2024. In Peru, our two labor agreements expire in 2026 and 2027. In Suriname, the collective bargaining with the union for our Merian mine was entered into in 2023, and will expire in 2025. In Argentina where there are three district unions; one union has an expired agreement and another has an agreement in place until 2024. In Timmins, Ontario, we renegotiated a five-year collective bargaining agreement for our Porcupine mine with the United Steelworkers Union in October 2023, which will be in effect through October 2028. In Mexico, following negotiations, we reached a profit sharing agreement in 2022 whereby union represented workforce will participate in uncapped profit-sharing bonus up to 10%, which will result in increased labor costs in the future. The current collective bargaining agreement will expire on 2024. Red Chris has a unionized workforce and has a collective agreement in place from April 2023 until April 2025. One provision of the Red Chris Collective Bargaining Agreement (“CBA”) is still being resolved through arbitration. There are existing employee enterprise bargaining agreements in place at Cadia and Telfer, which expire in 2025 and 2024, respectively. A failure to successfully enter into new contracts or resolve ongoing union complaints could result in future labor disputes, work stoppages or other disruptions in production that could adversely affect our operations and financial performance. Future disputes at the Company’s operations, projects or joint ventures may not be resolved without disruptions.

View prior text (2023)

Production at our mines is dependent upon the efforts of our employees and, consequently, our maintenance of good relationships with our employees. Due to union activities or other employee actions, we could experience labor disputes, work stops or other disruptions in production that could adversely affect us. For example, in recent years, there have been work stoppages by miners represented by unions at our Cerro Negro and Merian mines, which have disrupted operations. At December 31, 2022, various unions represented approximately 33% of our employee workforce worldwide. In 2022, Newmont implemented a new employment model in Ghana converting permanent employees into two-year fixed term contracts. Although 99.8% of eligible employees accepted the new fixed term contract and, received severance for their years of service, following implementation of the new employment model, the two unions requested and were granted a new collective bargaining certificates from Ghana’s Chief Labor Officer. Both certificates have been placed on hold to engage in proper process in accordance with Ghana’s Labor laws, and until Newmont and the unions agree on the class of workers to be represented. The outcome of that engagement and whether such certificates will be granted remains to be determined. In Peru, our two labor agreements expire in 2026 and 2027. In Suriname, the previous labor agreement held with the union for our Merian mine expired in 2021, and negotiations remain in progress. In Argentina where there are two unions; one union has an expired agreement under negotiation and another has an agreement in place until 2024. In Timmins, Ontario, we renegotiated a three-year collective bargaining agreement for our Porcupine mine with the United Steelworkers Union which will be in effect through 34 34 34 Table of Contents Table of Contents October 2023. In Mexico, following negotiations, we reached a profit sharing agreement in 2022 whereby union represented workforce will participate in uncapped profit-sharing bonus up to 10%, which will result in increased labor costs in the future. A failure to successfully enter into new contracts or resolve ongoing union complaints could result in future labor disputes, work stoppages or other disruptions in production that could adversely affect our operations and financial performance. Future disputes at the Company’s operations, projects or joint ventures may not be resolved without disruptions.

🟡 Modified

Our Company and the mining industry are facing continued geotechnical, geothermal, and hydrogeological challenges, which could adversely impact our production and profitability.

medium match confidence

Sentence-level differences:

  • Reworded sentence: "Newmont and the mining industry are facing continued geotechnical, geothermal and hydrogeological challenges due to the older age of certain of our mines and a trend toward mining of more complex deposits, the use of deeper and larger pits and the use of deep, bulk or selective underground mining techniques."
  • Reworded sentence: "Additionally, there are a number of risks and uncertainties associated with the block cave mining methods applied at Cadia, in New South Wales, Australia."
  • Reworded sentence: "Annually, Newmont manages and disposes more than 150 million tonnes of milled rock slurry, referred to as tailings, that are placed within engineered, surface containment facilities, or placed as structural backfill paste in underground mines (e.g., Éléonore, Porcupine), or managed subaqueously in-lake (i.e., Brucejack) or disposed of using deep sea tailings placement (i.e., Lihir)."
  • Reworded sentence: "Recognizing this risk, Newmont continues to review and refine our existing practices and, as a member of the International Council on Mining & Metals ("ICMM"), commits to implementation of the GISTM."
  • Reworded sentence: "For example, in December 2023 the Company temporarily suspended its processing operations at Telfer in Western Australia after cracking and sinkholes were detected on an internal embankment of the site’s TSF."

Current (2024):

Newmont and the mining industry are facing continued geotechnical, geothermal and hydrogeological challenges due to the older age of certain of our mines and a trend toward mining of more complex deposits, the use of deeper and larger pits and the use of deep, bulk or selective…

Read full text

Newmont and the mining industry are facing continued geotechnical, geothermal and hydrogeological challenges due to the older age of certain of our mines and a trend toward mining of more complex deposits, the use of deeper and larger pits and the use of deep, bulk or selective underground mining techniques. This leads to higher pit walls, more complex underground environments and increased exposure to geotechnical instability and geothermal and hydrogeological impacts. As our operations are maturing, the open pits at many of our sites are getting deeper and we have experienced geotechnical failures (such as pit wall and slope failures) at some of our mines, including, without limitation, at our operations in Australia, Ghana, Peru, Canada, Colorado and at NGM, in Nevada. See also the risk factor under the heading “Mining companies are increasingly required to consider and provide benefits to the communities and countries in which they operate in order to maintain operations”. Additionally, there are a number of risks and uncertainties associated with the block cave mining methods applied at Cadia, in New South Wales, Australia. These risks include a cave not propagating as anticipated, excessive air gaps forming during the cave propagation, unplanned ground movement occurring due to changes in stresses released in the surrounding rock and larger or more frequent mining-induced seismicity than anticipated. Additionally, during cave establishment and propagation, higher levels of seismic activity, and higher likelihood of damage to excavations from seismic events, are expected. This has been observed during the cave establishment phase of Cadia’s PC2-3 project and is expected during the establishment of Cadia’s PC1-2 project in the coming years. Such seismic events and associated damage may require changes to the mining plan and upgrades to ground support systems, which could take several months. Large seismic events may also occur after cave establishment and propagation and during steady state caving, although the likelihood of this is lower. Excessive water ingress, disturbance and the presence of fine materials may also give rise to unplanned releases of material of varying properties and of water through drawbells. Cadia recorded sudden unplanned releases of both dry fine ore material and wet mud material through drawbells in 2023. 32 32 32 Table of Contents Table of Contents In addition, there are a number of risks and uncertainties associated with the application of techniques used in the civil engineering industry for the stabilization of steep open pit slopes by Newmont at Lihir, which is located in Papua New Guinea. These risks include variation to technical models when compared to actual conditions, performance of reinforcement system in hot ground and delays with the execution of the civil works due to lack of experience with these techniques. The success of our operations depends, in part, on implementing engineering solutions to particular geotechnical, hydrogeological and geothermal conditions. For example, underground operations, large vertical shafts need to be excavated in order to provide ventilation to the underground environment, and sometimes these shafts are excavated using unsupported techniques such as raiseboring, whereby the walls of the shafts cannot be supported until the excavation is completed. If adverse and unexpected geotechnical and hydrogeological conditions are encountered, the shaft walls may become unstable. To prevent this type of incident occurring, thorough geotechnical and hydrogeological investigations and stability assessments are required and, if needed, alternate excavation locations or techniques need to be implemented. One such shaft wall failure incident occurred at Cadia in 2022, resulting in the need to abandon and backfill a shaft shortly after the completion of excavation to prevent further unravelling of the shaft wall and potential interruptions to other operations. Operations may also experience challenges to operating conditions, such as inundation, inrush of water or other materials, airblast and those relating to elevated temperatures (including management and discharge of hot water encountered in the underground workings). These risks could result in damage to, or destruction of, mineral properties, production facilities, equipment or other properties, personal injury or death of employees or third parties, environmental damage, community outrage, delays in mining, increased production costs, monetary losses and possible legal liability. Our operations are also subject to risks associated with a natural disaster, which include risk of tsunami, wildfires, mine flooding, geysers and outbursts, cyclones, avalanches and landslides. In addition, seismic activity may impact operations that are located in seismically active areas and subject to risks of earthquakes, such as Cadia and, as regards the related risks of tidal surge and tsunamis, Lihir. For instance, a large seismic event in 2017 impacted Cadia resulting in a temporary suspension of operations. Seismic activity has also been experienced at our Éléonore mine. Additionally, our Lihir operation is located within the Luise Caldera of the Luise Volcano which is located on the east coast of the Aniolam Island. The caldera is geothermally active in the form of hot springs and fumaroles. Adverse geotechnical, geothermal and hydrogeological conditions, including surface or underground fires, floods, droughts, geysers and outbursts, coastal erosion and landslides, avalanches, cyclones and pit wall failures, can be difficult to predict. Such conditions are often affected by risks and hazards outside of our control, such as severe weather and considerable rainfall, which may lead to periodic floods, mudslides, wall instability and seismic activity, which may result in slippage of material. Such events may not be detected in advance. In addition, Newmont has both operational (active and inactive) and closed tailings storage facilities ("TSFs") in a variety of climatic and geographic settings. Annually, Newmont manages and disposes more than 150 million tonnes of milled rock slurry, referred to as tailings, that are placed within engineered, surface containment facilities, or placed as structural backfill paste in underground mines (e.g., Éléonore, Porcupine), or managed subaqueously in-lake (i.e., Brucejack) or disposed of using deep sea tailings placement (i.e., Lihir). Newmont has experienced seepage and/or localized instability at TSFs which required us to re-evaluate our emergency response systems and make modifications to our TSFs. Issues with TSFs, such as instability, failure and/or seepage could occur in the future, and Newmont conducts detailed risk assessments considering potential failure modes to support understanding and development of risk mitigation measures in accordance with the As Low As Reasonably Practicable principle. The failure of a TSF embankment or a water storage dam at one of our mine sites could cause severe, and in some cases catastrophic, property and environmental damage and loss of life. For example, in early 2019, the extractive industry experienced a large-scale tailings dam failure at an unaffiliated mine in Brazil, which resulted in numerous fatalities and caused extensive property, environmental and reputational damage. Recognizing this risk, Newmont continues to review and refine our existing practices and, as a member of the International Council on Mining & Metals ("ICMM"), commits to implementation of the GISTM. Work is underway to bring all TSFs in our portfolio to substantial conformance with the GISTM by August 2025, and no assurance can be given that conformance will be achieved by such deadline. Conformance with the GISTM as well as improved understanding of our tailings risks and requisite mitigation remains on-going and has and may continue to result in increases to our estimated sustaining costs and closure costs for existing tailings facilities. Despite these efforts, no assurance can be given that TSF failure events will not occur in the future. A geotechnical failure of a TSF, dam, or pit slope could result in limited or restricted access to mine sites, suspension of operations, government investigations, regulatory actions or penalties, increased monitoring costs, remediation costs and other impacts, which could result in a material adverse effect on our results of operations and financial position. For example, in December 2023 the Company temporarily suspended its processing operations at Telfer in Western Australia after cracking and sinkholes were detected on an internal embankment of the site’s TSF. A failure to safely resolve any unexpected problems relating to these conditions at a commercially reasonable cost may result in damage to infrastructure or equipment or injury to personnel and may adversely impact the Company’s operating results and financial position. See also the risk factors under the heading “We may experience increased costs or losses resulting from the hazards and uncertainties associated with mining” and “Damage to our reputation may result in decreased investor confidence, challenges in maintaining positive community relations and can pose additional obstacles to our ability to develop our projects, which may result in a material adverse impact on our business, financial position, results of operations and growth prospects” and “Our operations are subject to extensive environmental laws and regulations.” 33 33 33 Table of Contents Table of Contents

View prior text (2023)

Newmont and the mining industry are facing continued geotechnical challenges due to the older age of certain of our mines and a trend toward mining deeper pits and more complex deposits. This leads to higher pit walls, more complex underground environments and increased exposure to geotechnical instability and hydrogeological impacts. As our operations are maturing, the open pits at many of our sites are getting deeper and we have experienced geotechnical failures (such as pit wall and slope failures) at some of our mines, including, without limitation, at our operations in Australia, Ghana, Peru, Canada, Colorado and at NGM, in Nevada. See also the risk factor under the heading “Mining companies are increasingly required to consider and provide benefits to the communities and countries in which they operate in order to maintain operations”. Unanticipated adverse geotechnical and hydrogeological conditions, may occur. For example, seismic activity, such as seismic activity experienced at our Éléonore mine, surface or underground fires, floods, landslides and pit wall failures, can be difficult to predict. Such conditions are often affected by risks and hazards outside of our control, such as severe weather and considerable rainfall, which may lead to periodic floods, mudslides, wall instability and seismic activity, which may result in slippage of material. Such events may not be detected in advance. In addition, Newmont has both operational (active and inactive) and closed tailings storage facilities ("TSFs") in a variety of climatic and geographic settings. Annually, Newmont manages and disposes more than 100 million tonnes of milled rock slurry, referred to as tailings, that are placed within engineered, surface containment facilities, or placed as structural backfill paste in underground mines. Newmont has experienced seepage at site TSFs in the past which required us to re-evaluate our emergency response systems and make facility and storage modifications. TSF seepage or failures event could occur in the future. The failure of a TSF embankment or a water storage dam at one of our mine sites could cause severe, and in some cases catastrophic, property and environmental damage and loss of life. For example, in early 2019, the extractive industry experienced a large-scale tailings dam failure at an unaffiliated mine in Brazil, which resulted in numerous fatalities and caused extensive property, environmental and reputational damage. Recognizing this risk, Newmont continues to review our existing practices and supported the International Council on Mining & Metals and the co-convenors in development of the Global Industry Standard on Tailings Management (“GISTM”). Newmont is committed to the implementation of the GISTM. We are working to bring our priority facilities (those with 'very high' or 'extreme' consequence classification) in conformance by August 2023, and all other TSFs are expected to be in conformance with the GISTM in the second half of 2025. Compliance with the GISTM remains on-going and has and may continue to result in increases to our estimated sustaining costs and closure costs for existing facilities. Despite these efforts, no assurance can be given that TSF failure events will not occur in the future. A geotechnical failure of a TSF, dam, or pit slope could result in limited or restricted access to mine sites, suspension of operations, government investigations, regulatory actions or penalties, increased monitoring costs, remediation costs and other impacts, which could result in a material adverse effect on our results of operations and financial position. See also the risk factors under the heading “We may experience increased costs or losses resulting from the hazards and uncertainties associated with mining” and “Damage to our reputation may result in decreased investor confidence, challenges in maintaining positive community relations and can pose additional obstacles to our ability to develop our projects, which may result in a material adverse impact on our business, financial position, results of operations and growth prospects.”

🟡 Modified

We rely on our supply chain operations to procure goods and services to conduct aspects of our operations and projects, and competition with other natural resource companies, and shortage of critical parts and equipment may adversely affect our operations and development projects.

low match confidence

Sentence-level differences:

  • Reworded sentence: "Production continuity and cost profile can be impacted by risks associated with the management and operation of the Company’s inbound global supply chain (including risks associated with the inventory management of critical equipment, spares and consumables)."
  • Removed sentence: "24 24 24 Table of Contents Table of Contents"

Current (2024):

Production continuity and cost profile can be impacted by risks associated with the management and operation of the Company’s inbound global supply chain (including risks associated with the inventory management of critical equipment, spares and consumables). We rely on our…

Read full text

Production continuity and cost profile can be impacted by risks associated with the management and operation of the Company’s inbound global supply chain (including risks associated with the inventory management of critical equipment, spares and consumables). We rely on our global supply chain to procure goods and services from contractors to conduct aspects of our operations and projects. We are exposed to material availability, disruption and performance risks across our supply chain, including lack of suitable suppliers or contractors, cost increases, impacts of pandemics and epidemics on the supply chain, transportation and logistics issues including delays in delivery, disruption to trade flows due to geopolitical tensions and/or changes in legislation, performance of suppliers and contractors to contractual terms, and damage to our reputation caused by actions of our suppliers or contractors. See the risk factors “We rely on contractors to conduct a significant portion of our operations and construction projects” and “Our operations may be adversely affected by rising energy prices or energy shortages” below for further information. Inbound supply chain disruptions could lead to mine site production curtailment or stoppage if a critical material or labor input unavailability. This could have a material adverse impact to our financial condition depending on the duration of the curtailment or stoppage. The Company is also exposed to outbound supply chain risk, particularly fluctuating transportation charges, delays in delivery of shipments, theft, terrorism, geopolitical tensions and border closures and adverse weather conditions. In addition, we compete with other natural resource companies for specialized equipment and supplies necessary for exploration and development, as well as for rights to mine properties containing gold, copper, silver, lead, zinc, and other minerals. The mining industry has been impacted, from time to time, by increased demand for critical resources such as input commodities, drilling equipment, trucks, shovels and tires. These shortages have, at times, impacted the efficiency of our operations, and resulted in cost increases and delays in construction of projects; thereby impacting operating costs, capital expenditures and production and construction schedules. We may be unable to obtain the services of skilled personnel and contractors or specialized equipment or supplies, or to acquire additional rights to mine properties, which could have an adverse effect on our competitive position or adversely impact our results of operations.

View prior text (2023)

We compete with other natural resource companies for specialized equipment and supplies necessary for exploration and development, as well as for rights to mine properties containing gold, silver, copper, zinc, lead and other minerals. The mining industry has been impacted, from time to time, by increased demand for critical resources such as input commodities, drilling equipment, trucks, shovels and tires. These shortages have, at times, impacted the efficiency of our operations, and resulted in cost increases and delays in construction of projects; thereby impacting operating costs, capital expenditures and production and construction schedules. We may be unable to obtain the services of skilled personnel and contractors or specialized equipment or supplies, or to acquire additional rights to mine properties, which could have an adverse effect on our competitive position or adversely impact our results of operations. 24 24 24 Table of Contents Table of Contents