# PG&E Corporation: 10-K Risk Factor Changes 2024 vs 2023

> Source: U.S. Securities and Exchange Commission (EDGAR)  
> Generated: 2026-05-10  
> All data extracted directly from official filings. No hallucinated content.

> **[AI-Generated Summary]** The paragraph below was produced by a language
> model and may contain errors. All other content on this page is deterministically
> extracted from the original SEC filing.

> PG&E Corporation removed five risks from its 2024 10-K, including pandemic-related impacts, dividend restrictions, and stock market concerns, while adding one new risk focused on cost management inefficiencies at the Utility. The company substantively modified 12 risks, with particular emphasis on expanding disclosures around indebtedness impacts on financial flexibility, regulatory compliance enforcement, and the adequacy of rate recovery mechanisms. Net reduction in total risk factors (38 risks in 2024 versus 38 in 2023) reflects strategic consolidation rather than improved risk profile, with modifications concentrated on financial leverage and regulatory operational challenges.

---

## Summary

| Status | Count |
|--------|-------|
| New risks added | 1 |
| Risks removed | 5 |
| Risks modified | 12 |
| Unchanged | 20 |

---

## New in Current Filing: The Utility may be unable to manage its costs effectively.

The Utility has set a goal to increase its capital investments to meet safety and climate goals, while also achieving operating cost savings. The Utility's ability to achieve such savings depends, in part, on whether the Utility can improve the planning and execution of its work by continuing to implement the Lean operating system. Even if the Utility is able to reduce some costs, other emerging priorities, such as emergency response, public purpose programs, wildfire mitigation initiatives, or California's clean energy transition, could require it to reinvest those savings.

---

## No Match in Current: Parties have appealed the Confirmation Order.

*This section from the 2023 filing does not have a high-confidence textual match in 2024. It may have been removed, merged, or substantially reworded.*

Following entry of the Confirmation Order confirming the Plan, certain parties filed notices of appeal with respect to the Confirmation Order. While a number of such appeals have been dismissed, there can be no assurance that any of the remaining appeals will not be successful and, if successful, that any such appeal would not have a material adverse effect on PG&E Corporation and the Utility. See Note 2 of the Notes to the Consolidated Financial Statements in Item 8. 48 48 48 48 48 48

---

## No Match in Current: Any substantial sale of stock by existing stockholders could depress the market value of PG&E Corporation's common stock, thereby devaluing the market price.

*This section from the 2023 filing does not have a high-confidence textual match in 2024. It may have been removed, merged, or substantially reworded.*

Certain stockholders, including the Fire Victim Trust, received a large number of shares in the Chapter 11 Cases and may continue to hold shares of PG&E Corporation. PG&E Corporation can make no prediction as to the effect, if any, that sales of shares, or the availability of shares for future sale, will have on the prevailing market price of shares of PG&E Corporation common stock. Sales of substantial amounts of shares of common stock in the public market, or the perception that such sales could occur, could depress prevailing market prices for such shares. Such sales may also make it more difficult for PG&E Corporation to sell equity securities or equity-linked securities in the future at a time and price which it deems appropriate. PG&E Corporation may also sell additional shares of common stock in subsequent offerings or issue additional shares of common stock or securities convertible into shares of PG&E Corporation common stock. The issuance of any shares of PG&E Corporation common stock in future financings, acquisitions upon conversion or exercise of convertible securities, or otherwise may result in a reduction of the book value and market price of PG&E Corporation's outstanding common stock. If PG&E Corporation issues any such additional shares, the issuance will cause a reduction in the proportionate ownership and voting power of all current shareholders. PG&E Corporation cannot predict the size of future issuances of shares of PG&E Corporation common stock or securities convertible into shares of PG&E Corporation common stock or, for any issuance, the effect, if any, that such future issuances will have on the market price of PG&E Corporation's common stock.

---

## No Match in Current: Because PG&E Corporation and the Utility have elected to treat the Fire Victim Trust as a grantor trust, the application of the Ownership Restrictions, as defined in PG&E Corporation's Amended Articles of Incorporation, will be determined on the basis of a number of shares outstanding that could differ materially from the number of shares reported as outstanding on the cover page of its periodic reports under the Exchange Act.

*This section from the 2023 filing does not have a high-confidence textual match in 2024. It may have been removed, merged, or substantially reworded.*

The Plan contemplated that the Fire Victim Trust would be treated as a "qualified settlement fund" for U.S. federal and state income tax purposes, subject to PG&E Corporation's ability to elect to treat the Fire Victim Trust as a grantor trust for U.S. federal and state income tax purposes instead. On July 8, 2021, PG&E Corporation, the Utility, ShareCo, and the Fire Victim Trust entered into the Share Exchange and Tax Matters Agreement, pursuant to which PG&E Corporation and the Utility made a grantor trust election for the Fire Victim Trust effective retroactively to the inception of the Fire Victim Trust. As a result of the grantor trust election, shares of PG&E Corporation common stock owned by the Fire Victim Trust are treated as held by the Utility and, in turn attributed to PG&E Corporation for income tax purposes. Consequently, any shares owned by the Fire Victim Trust are effectively excluded from the total number of outstanding equity securities when calculating a person's Percentage Stock Ownership (as defined in the Amended Articles) for purposes of the Ownership Restrictions. See "Tax Matters" in Item 7. MD&A for an example of these calculations. PG&E Corporation does not control the number of shares held by the Fire Victim Trust and is not able to determine in advance the number of shares the Fire Victim Trust will hold. PG&E Corporation intends to periodically make available to investors information about the number of shares of common stock held by the Fire Victim Trust, the Utility, and ShareCo as of a specified date for purposes of the Ownership Restrictions, including in its Quarterly Reports and Annual Reports filed with the SEC. PG&E Corporation intends to enforce the Ownership Restrictions as described in the foregoing paragraph (calculated as excluding any shares owned by the Fire Victim Trust, the Utility, and ShareCo from the number of outstanding equity securities). All current and prospective shareholders are advised to consider the foregoing in determining their ownership and acquisition of PG&E Corporation common stock. 50 50 50 50 50 50

---

## No Match in Current: PG&E Corporation's ability to pay dividends on shares of its common stock is subject to restrictions.

*This section from the 2023 filing does not have a high-confidence textual match in 2024. It may have been removed, merged, or substantially reworded.*

Pursuant to the Confirmation Order, PG&E Corporation may not pay dividends on shares of its common stock until it recognizes $6.2 billion in Non-GAAP Core Earnings following the Emergence Date. "Non-GAAP Core Earnings" means GAAP earnings adjusted for certain non-core items as described in the Plan. Subject to the foregoing restrictions, any decision to declare and pay dividends in the future will be made at the discretion of PG&E Corporation's Board of Directors and will depend on, among other things, PG&E Corporation's results of operations, financial condition, cash requirements, contractual restrictions, and other factors that the Board of Directors may deem relevant. 51 51 51 51 51 51

---

## No Match in Current: PG&E Corporation's and the Utility's financial condition, results of operations, liquidity, and cash flows have been and could continue to be significantly affected by the outbreak of the COVID-19 pandemic.

*This section from the 2023 filing does not have a high-confidence textual match in 2024. It may have been removed, merged, or substantially reworded.*

PG&E Corporation's and the Utility's financial condition, results of operations, liquidity, and cash flows have been (beginning in March 2020) and could continue to be significantly affected by the outbreak of the COVID-19 pandemic (and its variants), but the extent of such impact is uncertain. 52 52 52 52 52 52 PG&E Corporation and the Utility continue to evaluate the impact of the current COVID-19 outbreak on their business and financial results. The consequences of a continued and prolonged outbreak and resulting governmental and regulatory orders have had and could continue to have a negative impact on the Utility's financial condition, results of operations, liquidity, and cash flows. The outbreak of the COVID-19 pandemic and the resulting economic conditions, and resulting decrease in economic and industrial activity in the Utility's service area, have and will continue to have a significant adverse impact on the Utility's customers. These circumstances have impacted and will continue to impact the Utility for a period of time that PG&E Corporation and the Utility are unable to predict. For example, the economic downturn has resulted in a reduction in customer receipts and collection delays throughout the COVID-19 pandemic. The Utility's accounts receivable balances over 30 days outstanding as of December 31, 2022 were approximately $1.1 billion, or $890 million higher as compared to the balances as of December 31, 2019. The Utility is unable to estimate the portion of the increase directly attributable to the COVID-19 pandemic. The Utility expects to continue experiencing an impact on monthly cash collections for as long as current COVID-19 circumstances persist. PG&E Corporation and the Utility are unable to quantify the long-term potential impact of the changes in customer collections or changes in energy demand on earnings and cash flows due, in part, to uncertainties regarding the timing, duration and intensity of the COVID-19 outbreak and the resulting economic downturn. Although the CPUC authorized the establishment of memorandum and balancing accounts to track costs associated with customer protection measures, the timing of regulatory relief, if any, and ultimate cost recovery from such accounts or otherwise, are uncertain. The COVID-19 pandemic and resulting economic downturn have resulted and may continue to result in workforce disruptions, both in personnel availability (including a reduction in contract labor resources) and deployment. Increased governmental regulation of the COVID-19 pandemic protections, including vaccination mandates or testing requirements for workers, could result in employee attrition, workforce disruptions and increased supplier and contractor costs. Although the Utility continues to prioritize customer and community safety, these disruptions necessitate changes to the Utility's operating and capital expenditure plans, which could lead to project delays or service disruptions in certain programs. Delays in production and shipping of materials used in the Utility's operations may also impact operations. The Utility has experienced shortages in certain materials, longer lead times and delivery delays as a result of domestic and international raw material and labor shortages. If these disruptions to the supply chain persist or worsen, the Utility may be delayed or prevented from completing planned maintenance and capital projects work. PG&E Corporation and the Utility expect additional financial impacts in the future as a result of the COVID-19 pandemic. Potential longer-term impacts of the COVID-19 pandemic on PG&E Corporation or the Utility include the potential for higher credit spreads, borrowing costs and incremental financing needs. PG&E Corporation's and the Utility's analysis of the potential impact of the COVID-19 pandemic is ongoing and subject to change. PG&E Corporation and the Utility are unable to predict the timing, duration or intensity of the COVID-19 pandemic situation and any resurgence of the COVID-19 pandemic and any variant strains of the COVID-19 virus, the effectiveness and intensity of measures to contain the COVID-19 pandemic (including availability and effectiveness of vaccines), and the effects of the COVID-19 situation on the business, financial condition and results of operations of PG&E Corporation and the Utility and on the business and general economic conditions in the State of California and the United States of America.

---

## Modified: PG&E Corporation's and the Utility's substantial indebtedness may adversely affect their financial health and operating flexibility.

**Key changes:**

- Reworded sentence: "As of December 31, 2023, PG&E Corporation had approximately $4.65 billion of outstanding indebtedness (such indebtedness consisting of PG&E Corporation's $2.15 billion aggregate principal amount of convertible senior secured notes due 2027, $1.0 billion aggregate principal amount of senior secured notes due 2028, $1.0 billion aggregate principal amount of senior secured notes due 2030, and $500 million of borrowings under the secured term loan agreement entered into in June 2020), and the Utility had approximately $48.0 billion of outstanding indebtedness."
- Reworded sentence: "Furthermore, since a significant percentage of the Utility's assets are used to secure its debt, this reduces the amount of collateral available for future secured debt or credit support and reduces its flexibility in operating these secured assets or using them for other financing transactions."
- Reworded sentence: "As a capital-intensive company, the Utility relies on access to the capital markets, particularly investment grade capital markets."
- Added sentence: "Although the Utility is generally entitled to seek recovery of its cost of capital, because such requests are subject to CPUC review, the Utility may not successfully recover its cost of capital."
- Added sentence: "Even when cost recovery is granted, the timing of such recovery will generally not occur until after the costs are required to be paid."

**Prior (2023):**

PG&E Corporation and the Utility have a substantial amount of indebtedness, most of which is secured by liens on certain assets of PG&E Corporation and the Utility. As of December 31, 2022, PG&E Corporation had approximately $4.68 billion of outstanding indebtedness (such indebtedness consisting of PG&E Corporation's $1.0 billion aggregate principal amount of senior secured notes due 2028, $1.0 billion aggregate principal amount of senior secured notes due 2030, and borrowings under the $2.75 billion secured term loan agreement entered into in June 2020), and the Utility had approximately $45.6 billion of outstanding indebtedness. In addition, PG&E Corporation had $500 million of additional borrowing capacity under the Corporation Revolving Credit Agreement, and the Utility had $1.5 billion of additional borrowing capacity under the Utility Revolving Credit Agreement. In addition, the Utility had outstanding preferred stock with an aggregate liquidation preference of $252 million. Since PG&E Corporation and the Utility have a high level of debt, a substantial portion of cash flow from operations will be used to make payments on this debt. Furthermore, since a significant percentage of the Utility's assets are used to secure its debt, this reduces the amount of collateral available for future secured debt or credit support and reduces its flexibility in operating these secured assets. This relatively high level of debt and related security could have other important consequences for PG&E Corporation and the Utility, including: •limiting their ability or increasing the costs to refinance their indebtedness; 47 47 47 47 47 47 •limiting their ability to borrow additional amounts for working capital, capital expenditures, debt service requirements, execution of their business strategy or other purposes; •limiting their ability to use operating cash flow in other areas of their business; •increasing their vulnerability to general adverse economic and industry conditions, including increases in interest rates, particularly given their substantial indebtedness that bears interest at variable rates, as well as to catastrophic events; and •limiting their ability to capitalize on business opportunities. Under the terms of the agreements and indentures governing their respective indebtedness, PG&E Corporation and the Utility are permitted to incur additional indebtedness, some of which could be secured (subject to compliance with certain tests) and which could further accentuate these risks. As a result of the high level of indebtedness, PG&E Corporation and the Utility may be unable to generate sufficient cash through operations to service such debt, and may need to refinance such indebtedness at or prior to maturity and be unable to obtain financing on suitable terms or at all. As a capital-intensive company, the Utility relies on access to the capital markets. If the Utility were unable to access the capital markets or the cost of financing were to substantially increase, its financial condition, results of operations, liquidity, and cash flows could be materially affected. The Utility's ability to obtain financing, as well as its ability to refinance debt and make scheduled payments of principal and interest, are dependent on numerous factors, including the Utility's levels of indebtedness, maintenance of acceptable credit ratings, financial performance, liquidity and cash flow, and other market conditions. The Utility's inability to service its substantial debt or access the financial markets on reasonable terms could have a material effect on PG&E Corporation's and the Utility's financial condition, results of operations, liquidity, and cash flows.

**Current (2024):**

PG&E Corporation and the Utility have a substantial amount of indebtedness, most of which is secured by liens on certain assets of PG&E Corporation and the Utility. As of December 31, 2023, PG&E Corporation had approximately $4.65 billion of outstanding indebtedness (such indebtedness consisting of PG&E Corporation's $2.15 billion aggregate principal amount of convertible senior secured notes due 2027, $1.0 billion aggregate principal amount of senior secured notes due 2028, $1.0 billion aggregate principal amount of senior secured notes due 2030, and $500 million of borrowings under the secured term loan agreement entered into in June 2020), and the Utility had approximately $48.0 billion of outstanding indebtedness. In addition, PG&E Corporation had $500 million of additional borrowing capacity under the Corporation Revolving Credit Agreement, and the Utility had $2.0 billion of additional borrowing capacity under the Utility Revolving Credit Agreement. In addition, the Utility had outstanding preferred stock with an aggregate liquidation preference of $252 million. Since PG&E Corporation and the Utility have a high level of debt, a substantial portion of cash flow from operations will be used to make payments on this debt. Furthermore, since a significant percentage of the Utility's assets are used to secure its debt, this reduces the amount of collateral available for future secured debt or credit support and reduces its flexibility in operating these secured assets or using them for other financing transactions. This relatively high level of debt and related security could have other important consequences for PG&E Corporation and the Utility, including: •limiting their ability or increasing the costs to refinance their indebtedness; •limiting their ability to borrow additional amounts for working capital, capital expenditures, debt service requirements, execution of their business strategy or other purposes; •limiting their ability to use operating cash flow in other areas of their business; •increasing their vulnerability to general adverse economic and industry conditions, including increases in interest rates, particularly given their substantial indebtedness that bears interest at variable rates, as well as to catastrophic events; and •limiting their ability to capitalize on business opportunities. 48 48 48 48 48 48 Under the terms of the agreements and indentures governing their respective indebtedness, PG&E Corporation and the Utility are permitted to incur additional indebtedness, some of which could be secured (subject to compliance with certain tests) and which could further accentuate these risks. As a result of the high level of indebtedness, PG&E Corporation and the Utility may be unable to generate sufficient cash through operations to service such debt, and may need to refinance such indebtedness at or prior to maturity and be unable to obtain financing on suitable terms or at all. As a capital-intensive company, the Utility relies on access to the capital markets, particularly investment grade capital markets. If the Utility were unable to access the capital markets or the cost of financing were to substantially increase, its financial condition, results of operations, liquidity, and cash flows could be materially affected. Although the Utility is generally entitled to seek recovery of its cost of capital, because such requests are subject to CPUC review, the Utility may not successfully recover its cost of capital. Even when cost recovery is granted, the timing of such recovery will generally not occur until after the costs are required to be paid. The Utility's ability to obtain financing, as well as its ability to refinance debt and make scheduled payments of principal and interest, are dependent on numerous factors, including the Utility's levels of indebtedness, maintenance of acceptable credit ratings, financial performance, liquidity and cash flow, and other market conditions. The Utility's inability to service its substantial debt or access the financial markets on reasonable terms could have a material effect on PG&E Corporation's and the Utility's financial condition, results of operations, liquidity, and cash flows.

---

## Modified: The Utility is subject to extensive regulations and enforcement proceedings in connection with compliance with such regulations could result in penalties.

**Key changes:**

- Reworded sentence: "The Utility could incur material charges, including fines and other penalties, in connection with matters that the CPUC's SED may investigate."

**Prior (2023):**

The Utility is subject to extensive regulations, including federal, state, and local energy, environmental and other laws and regulations, and the risk of enforcement proceedings in connection with compliance with such regulations. The Utility could incur material charges, including fines and other penalties, in connection with the Safety Culture OII (as defined in "Order Instituting an Investigation into PG&E Corporation's and the Utility's Safety Culture" under "Regulatory Matters" in Item 7. MD&A) and other matters that the CPUC's SED may be investigating. The SED could launch investigations at any time on any issue it deems appropriate. In addition, OEIS has authority to approve and oversee compliance with the WMP and may determine that the Utility has failed to substantially comply with its WMP. The Utility could be subject to additional regulatory or governmental enforcement action in the future with respect to compliance with federal, state, or local laws, regulations or orders that could result in additional fines, penalties or customer refunds, including those regarding renewable energy and RA requirements; customer billing; customer service; affiliate transactions; vegetation management; design, construction, operating and maintenance practices; safety and inspection practices; compliance with CPUC GOs or other applicable CPUC decisions or regulations; whether the Utility is able to achieve the targets in its WMPs; federal electric reliability standards; and environmental compliance. CPUC staff could also impose penalties on the Utility in the future in accordance with its authority under the gas and electric safety citation programs. The amount of such fines, penalties, or customer refunds depends on a variety of factors and could have a material effect on PG&E Corporation's and the Utility's financial condition, results of operations, liquidity, and cash flows. The Utility also is a target of a number of investigations, in addition to certain investigations in connection with the wildfires. See "Risks Related to Wildfires" above. The Utility is unable to predict the outcome of pending investigations, including whether any charges will be brought against the Utility, or the amount of any costs and expenses associated with such investigations. If these investigations result in enforcement action against the Utility, the Utility could incur additional fines or penalties, the amount of which could be substantial, and, in the event of a judgment against the Utility, suffer further ongoing negative consequences. Furthermore, a negative outcome in any of these investigations, or future enforcement actions, could negatively affect the outcome of future ratemaking and regulatory proceedings to which the Utility may be subject; for example, by enabling parties to challenge the Utility's request to recover costs that the parties allege are somehow related to the Utility's violations.

**Current (2024):**

The Utility is subject to extensive regulations, including federal, state, and local energy, environmental and other laws and regulations, and the risk of enforcement proceedings in connection with compliance with such regulations. The Utility could incur material charges, including fines and other penalties, in connection with matters that the CPUC's SED may investigate. The SED can launch investigations at any time on any issue it deems appropriate. In addition, the OEIS has authority to approve and oversee compliance with the WMP and may determine that the Utility has failed to substantially comply with its WMP. 46 46 46 46 46 46 The Utility could be subject to additional regulatory or governmental enforcement action in the future with respect to compliance with federal, state, or local laws, regulations or orders that could result in additional fines, penalties or customer refunds, including those regarding renewable energy and RA requirements; customer billing; customer service; affiliate transactions; vegetation management; design, construction, operating and maintenance practices; safety and inspection practices; compliance with CPUC GOs or other applicable CPUC decisions or regulations; whether the Utility is able to achieve the targets in its WMPs; federal electric reliability standards; and environmental compliance. CPUC staff could also impose penalties on the Utility in the future in accordance with its authority under the gas and electric safety citation programs. The amount of such fines, penalties, or customer refunds depends on a variety of factors and could have a material effect on PG&E Corporation's and the Utility's financial condition, results of operations, liquidity, and cash flows. The Utility also is a target of a number of investigations, in addition to certain investigations in connection with the wildfires. See "Risks Related to Wildfires" above. The Utility is unable to predict the outcome of pending investigations, including whether any charges will be brought against the Utility, or the amount of any costs and expenses associated with such investigations. If these investigations result in enforcement action against the Utility, the Utility could incur additional fines or penalties, the amount of which could be substantial, and, in the event of a judgment against the Utility, suffer further ongoing negative consequences. Furthermore, a negative outcome in any of these investigations, or future enforcement actions, could negatively affect the outcome of future ratemaking and regulatory proceedings to which the Utility may be subject; for example, by enabling parties to challenge the Utility's request to recover costs that the parties allege are somehow related to the Utility's violations.

---

## Modified: The Utility's ratemaking and cost recovery proceedings may not authorize sufficient revenues, or the Utility's actual costs could exceed its authorized or forecasted costs due to various factors.

**Key changes:**

- Reworded sentence: "If the CPUC does not authorize sufficient funding for investments in the Utility's infrastructure, it may negatively impact the Utility's ability to modernize the grid and make it resilient to risks related to climate change, including wildfires."
- Reworded sentence: "The Utility may incur additional costs or receive reduced revenue without cost recovery for many reasons including changing market circumstances, unanticipated events (such as wildfires, storms, earthquakes, accidents, or catastrophic or other events affecting the Utility's operations), whether the CAISO wholesale electricity market continues to function effectively, or compliance with new state laws or policies."

**Prior (2023):**

The Utility's financial results depend on its ability to earn a reasonable return on capital, including long-term debt and equity, and to recover costs from its customers, through the rates it charges its customers as approved by the CPUC and the FERC. PG&E Corporation's and the Utility's financial condition, results of operations, liquidity, and cash flows could be materially affected if the CPUC or the FERC does not authorize sufficient revenues for the Utility or if the amount of actual costs incurred differs from the forecast or authorized costs embedded in rates. The outcome of the Utility's ratemaking proceedings can be affected by many factors, including the level of opposition by intervening parties; potential rate impacts; increasing levels of regulatory review; changes in the political, regulatory, or legislative environments; and the opinions of the Utility's regulators, consumer and other stakeholder organizations, and customers, about the Utility's ability to provide safe, reliable, and affordable electric and gas services. If the CPUC does not authorize sufficient funding for investments in the Utility's infrastructure, it may negatively impact the Utility's ability to modernize the grid and make it resilient to risks related to climate change, including wildfires. 46 46 46 46 46 46 In addition to the amount of authorized revenues, PG&E Corporation's and the Utility's financial condition, results of operations, liquidity, and cash flows could be materially affected if the Utility's actual costs differ from authorized or forecast costs. The Utility's ability to recover its costs and earn a reasonable rate of return can be affected by many factors, including the time delay between when costs are incurred and when those costs are recovered through rates. The CPUC or the FERC may not allow the Utility to recover costs on the basis that such costs were not reasonably or prudently incurred or for other reasons. Further, the Utility may be required to incur expenses before the relevant regulatory agency approves the recovery of such costs. For example, the Utility has incurred, and continues to incur, costs to strengthen its wildfire mitigation and prevention efforts before it is clear whether such costs will be recoverable through rates. Also, the CPUC may deny recovery of uninsured wildfire-related costs incurred by the Utility if the CPUC determines that the Utility was not prudent. The Utility may incur additional costs or receive reduced revenue for many reasons including changing market circumstances, unanticipated events (such as wildfires, storms, earthquakes, accidents, or catastrophic or other events affecting the Utility's operations), increased self-generation by customers, an increase in distributed generation, lower customer demand due to adverse economic conditions, the loss of the Utility's customers to other retail providers like CCAs or DA providers, whether the CAISO wholesale electricity market continues to function effectively, returning customers, or compliance with new state laws or policies. See "Trends in Market Demand and Competitive Conditions in the Electricity Industry" in Item 1.

**Current (2024):**

The Utility's financial results depend on its ability to earn a reasonable return on capital, including long-term debt and equity, and to recover costs from its customers, through the rates it charges its customers as approved by the CPUC and the FERC. PG&E Corporation's and the Utility's financial condition, results of operations, liquidity, and cash flows could be materially affected if the CPUC or the FERC does not authorize sufficient revenues for the Utility or if the amount of actual costs incurred differs from the forecast or authorized costs embedded in rates. The outcome of the Utility's ratemaking proceedings can be affected by many factors, including the level of opposition by intervening parties; potential rate impacts; increasing levels of regulatory review; changes in the political, regulatory, or legislative environments; and the opinions of the Utility's regulators, consumer and other stakeholder organizations, and customers, about the Utility's ability to provide safe, reliable, and affordable electric and gas services. If the CPUC does not authorize sufficient funding for investments in the Utility's infrastructure, it may negatively impact the Utility's ability to modernize the grid and make it resilient to risks related to climate change, including wildfires. In addition to the amount of authorized revenues, PG&E Corporation's and the Utility's financial condition, results of operations, liquidity, and cash flows could be materially affected if the Utility's actual costs differ from authorized or forecast costs. The Utility's ability to recover its costs and earn a reasonable rate of return can be affected by many factors, including the time delay between when costs are incurred and when those costs are recovered through rates. The CPUC or the FERC may not allow the Utility to recover costs on the basis that such costs were not reasonably or prudently incurred or for other reasons. Further, the Utility may be required to incur expenses before the relevant regulatory agency approves the recovery of such costs. For example, the Utility has incurred, and continues to incur, costs to strengthen its wildfire mitigation and prevention efforts before it is clear whether such costs will be recoverable through rates. Also, the CPUC may deny recovery of uninsured wildfire-related costs incurred by the Utility if the CPUC determines that the Utility was not prudent. The Utility may incur additional costs or receive reduced revenue without cost recovery for many reasons including changing market circumstances, unanticipated events (such as wildfires, storms, earthquakes, accidents, or catastrophic or other events affecting the Utility's operations), whether the CAISO wholesale electricity market continues to function effectively, or compliance with new state laws or policies. See "Trends in Market Demand and Competitive Conditions in the Electricity Industry" in Item 1. 47 47 47 47 47 47

---

## Modified: Risks related to financial conditions, including risks related to:

**Key changes:**

- Reworded sentence: "•PG&E Corporation's and the Utility's substantial indebtedness; •Restrictions in indebtedness documents; •Potential additional dilution to holders of PG&E Corporation common stock; •Ownership and transfer restrictions associated with PG&E Corporation common stock; •The inability of PG&E Corporation to use some or all of its net operating loss carryforwards and other tax attributes to offset future income; •PG&E Corporation's reliance on dividends, distributions and other payments from the Utility; •Restrictions on shareholders' ability to change the direction or management of PG&E Corporation; 36 36 36 36 36 36 •Increased customer rates; •The Utility's ability to manage its costs effectively; and •Inflation and supply chain issues."

**Prior (2023):**

•PG&E Corporation's and the Utility's substantial indebtedness; •Restrictions in indebtedness documents; •Appeals of the Confirmation Order; •Potential additional dilution to holders of PG&E Corporation common stock; •Any substantial sale of stock by existing stockholders; •Ownership and transfer restrictions associated with PG&E Corporation common stock; •Tax-related risks and uncertainties, including the grantor trust election for the Fire Victim Trust; •The inability of PG&E Corporation to use some or all of its net operating loss carryforwards and other tax attributes to offset future income; •Restrictions on PG&E Corporation's and the Utility's ability to issue dividends; •PG&E Corporation's reliance on dividends, distributions and other payments from the Utility; •Restrictions on shareholders' ability to change the direction or management of PG&E Corporation; •The COVID-19 pandemic; 36 36 36 36 36 36 •Increased customer rates; and •Inflation.

**Current (2024):**

•PG&E Corporation's and the Utility's substantial indebtedness; •Restrictions in indebtedness documents; •Potential additional dilution to holders of PG&E Corporation common stock; •Ownership and transfer restrictions associated with PG&E Corporation common stock; •The inability of PG&E Corporation to use some or all of its net operating loss carryforwards and other tax attributes to offset future income; •PG&E Corporation's reliance on dividends, distributions and other payments from the Utility; •Restrictions on shareholders' ability to change the direction or management of PG&E Corporation; 36 36 36 36 36 36 •Increased customer rates; •The Utility's ability to manage its costs effectively; and •Inflation and supply chain issues.

---

## Modified: The electric power and natural gas industries are undergoing significant changes driven by technological advancements and a decarbonized economy, which could lead to the reduction in demand for natural gas as an energy resource that could impact the Utility's ability to recover through rates its investment.

**Key changes:**

- Reworded sentence: "California utilities also are experiencing increasing deployment by customers and third parties of distributed energy resources, such as on-site solar generation, electric vehicles, electric heat pump space conditioning and water heating, battery electric storage, fuel cells, energy efficiency, and demand response technologies."
- Reworded sentence: "Reducing natural gas use reduces the gas customer base and could diminish the need for gas infrastructure and, as a result, could lead to certain gas assets no longer being "used and useful," potentially causing substantial investment value of gas assets to be stranded (under CPUC precedent, when an asset no longer meets the standard of "used and useful," the asset is removed from rate base, which results in a reduction in associated rate recovery)."

**Prior (2023):**

The electric power industry is undergoing transformative change driven by technological advancements enabling customer choice and state climate policy supporting a decarbonized economy. California utilities also are experiencing increasing deployment by customers and third parties of distributed energy resources, such as on-site solar generation, electric vehicles, energy storage, fuel cells, energy efficiency, and demand response technologies. These developments will require sustained investments in grid modernization, renewable integration projects, energy efficiency programs, energy storage options, electric vehicle infrastructure and state infrastructure modernization (e.g., rail and water projects). The Utility may be unable to effectively adapt to these potential business and regulatory changes, for instance by failing to meet customer demand for new business interconnections in a timely manner. The CPUC is also conducting proceedings to evaluate changes to the planning and operation of the electric distribution grid in order to prepare for higher penetration of distributed energy resources and consider future grid modernization and grid reinforcement investments; evaluate if traditional grid investments can be deferred by distributed energy resources, and if feasible, what, if any, compensation to utilities would be appropriate for enabling those investments; and clarify the role of the electric distribution grid operator. If the Utility is unable to effectively adapt to these potential business and regulatory changes its business model and its ability to execute on its strategy could be materially impacted. Various jurisdictions within California have enacted prohibitions or restrictions on use and consumption of natural gas, for example in buildings, that will reduce the use of natural gas. Reducing natural gas use could lead to a reduction in the gas customer base and a diminished need for gas infrastructure and, as a result, could lead to certain gas assets no longer being "used and useful," potentially causing substantial investment value of gas assets to be stranded (under CPUC precedent, when an asset no longer meets the standard of "used and useful," the asset is removed from rate base, which results in a reduction in associated rate recovery). However, while natural gas demand is projected to decline over time, the costs of operating a safe and reliable gas delivery system in California have been increasing, among other things, to cover the cost of long-term pipeline safety enhancements. Inability by the Utility to recover through rates its investments into the natural gas system while still ensuring gas system safety and reliability could materially affect the Utility's financial condition, results of operations, liquidity, and cash flows. These industry changes, costs associated with complying with new regulatory developments and initiatives and with technological advancements, or the Utility's inability to successfully adapt to changes in the electric and gas industry, could materially affect the Utility's financial condition, results of operations, liquidity, and cash flows.

**Current (2024):**

The electric power industry is undergoing transformative change driven by technological advancements enabling customer choice and state climate policy supporting a decarbonized economy. California utilities also are experiencing increasing deployment by customers and third parties of distributed energy resources, such as on-site solar generation, electric vehicles, electric heat pump space conditioning and water heating, battery electric storage, fuel cells, energy efficiency, and demand response technologies. These developments will require further modernization of the electric distribution grid to, among other things, accommodate increasing two-way flows of electricity and increase the grid's capacity to interconnect these resources. In addition, enabling California's clean energy transition will require sustained investments in grid modernization, renewable energy integration projects, energy efficiency programs, energy storage options, electric vehicle infrastructure, and state infrastructure modernization (e.g., rail and water projects). The Utility may be unable to effectively adapt to these potential business and regulatory changes, for instance by failing to meet customer demand for new business interconnections in a timely manner. The CPUC is also conducting proceedings to evaluate changes to the planning and operation of the electric distribution grid in order to prepare for higher penetration of distributed energy resources and consider future grid modernization and grid reinforcement investments; evaluate if traditional grid investments can be deferred by distributed energy resources, and if feasible, what, if any, compensation to utilities would be appropriate for enabling those investments; and clarify the role of the electric distribution grid operator. If the Utility is unable to effectively adapt to these potential business and regulatory changes its business model and its ability to execute on its strategy could be materially impacted. Various jurisdictions within California have enacted prohibitions or restrictions on use and consumption of natural gas, for example in buildings, that will reduce the use of natural gas. Reducing natural gas use reduces the gas customer base and could diminish the need for gas infrastructure and, as a result, could lead to certain gas assets no longer being "used and useful," potentially causing substantial investment value of gas assets to be stranded (under CPUC precedent, when an asset no longer meets the standard of "used and useful," the asset is removed from rate base, which results in a reduction in associated rate recovery). A substantial reduction in natural gas as an energy source in California without adequate and appropriate recovery of investments could result in impairment of the Utility's natural gas infrastructure assets if they were not permitted to be repurposed for alternative fuels, were required to be depreciated on an accelerated basis, or were to become stranded. However, even as natural gas demand is projected to decline over time, the costs of operating a safe and reliable gas delivery system in California have been increasing, among other things, to cover the cost of long-term pipeline safety enhancements. If the Utility is unable to recover through rates its investments into the natural gas system while still ensuring gas system safety and reliability, its financial condition, results of operations, liquidity, and cash flows could be materially affected. These industry changes, costs associated with complying with new regulatory developments and initiatives and with technological advancements, or the Utility's inability to successfully adapt to changes in the electric and gas industry, could materially affect the Utility's financial condition, results of operations, liquidity, and cash flows.

---

## Modified: Jurisdictions may attempt to acquire the Utility's assets through eminent domain, and third parties may attempt to acquire the Utility's customers by bypassing the Utility's electric infrastructure system.

**Key changes:**

- Reworded sentence: "San Francisco would still need to, among other things, initiate and prevail in an eminent domain action in state court to acquire the Utility's assets, but the Utility may not be successful in defending against such an action or related regulatory proceeding."
- Reworded sentence: "In addition, third parties may attempt to bypass the Utility's existing electric infrastructure system to provide retail electric service to discrete geographic areas or specific customers."

**Prior (2023):**

Jurisdictions may attempt to acquire the Utility's assets through eminent domain ("municipalization"). In particular, the City and County of San Francisco ("San Francisco") has submitted a petition with the CPUC seeking a valuation of the Utility's electric assets in San Francisco and has expressed intent to acquire such assets. While San Francisco would still need to, among other things, initiate and prevail in an eminent domain action in state court to acquire the Utility's assets, there is no guarantee that the Utility would be successful in defending against such an action or related regulatory proceeding. If municipalization proceedings are permitted to move forward and are successful, the Utility would be entitled to receive the fair market value of the assets that are subject to the takeover effort, but the valuation issues in any municipalization proceeding would be highly contentious and could result in the Utility receiving less than what it believes is just compensation for the applicable assets. Any assets acquired by a third party through eminent domain would be excluded from the Utility's rate base, reducing the Utility's revenues and opportunity to earn a return on such assets. Assets that are targeted for municipalization generally are located in geographic areas that have a lower cost of service relative to billed revenues, so municipalization could negatively impact the affordability of the Utility's service for remaining Utility customers served outside of those geographic areas. A successful municipalization attempt could also encourage similar attempts by other municipalities which, if successful, would further divide the Utility's assets and reduce the Utility's rate base, profitability, and affordability for remaining Utility customers. It is also unclear how the CPUC would allocate the compensation received by the Utility for its assets between shareholders and customers. As a result of these factors, municipalization could materially affect the Utility's financial condition, results of operations, liquidity, and cash flow.

**Current (2024):**

Jurisdictions may attempt to acquire the Utility's assets through eminent domain ("municipalization"). In particular, the City and County of San Francisco ("San Francisco") has submitted a petition with the CPUC seeking a valuation of the Utility's electric assets in San Francisco and has expressed intent to acquire such assets. San Francisco would still need to, among other things, initiate and prevail in an eminent domain action in state court to acquire the Utility's assets, but the Utility may not be successful in defending against such an action or related regulatory proceeding. If municipalization proceedings are permitted to move forward and are successful, the Utility would be entitled to receive the fair market value of the assets that are subject to the takeover effort, as well as associated severance damages, but valuation issues in any municipalization proceeding would be highly contentious and could result in the Utility receiving less than what it believes is just compensation for the applicable assets. Any assets acquired by a third party through eminent domain would be excluded from the Utility's rate base, reducing the Utility's revenues and opportunity to earn a return on such assets. In addition, third parties may attempt to bypass the Utility's existing electric infrastructure system to provide retail electric service to discrete geographic areas or specific customers. Utility assets that are targeted for municipalization, as well as existing or potential future Utility customers targeted for electric services by third parties that bypass the Utility's facilities, generally are located in geographic areas that have a lower cost of service relative to billed revenues, so municipalization (or bypass) could negatively impact the affordability of the Utility's service for remaining Utility customers served outside of those geographic areas. A successful municipalization or bypass attempt could also encourage similar attempts by other municipalities or third parties which, if successful, would further divide the Utility's assets and reduce the Utility's rate base, profitability, and affordability for remaining Utility customers. It is also unclear how the CPUC would allocate the compensation received by the Utility for any involuntary sale of its assets between shareholders and customers. As a result of these factors, municipalization or electric bypass could materially affect the Utility's financial condition, results of operations, liquidity, and cash flow.

---

## Modified: Concerns about high rates for the Utility's customers could negatively impact PG&E Corporation's and the Utility's financial condition, results of operations, liquidity, and cash flows.

**Key changes:**

- Reworded sentence: "The Utility's capital investment plan, increasing procurement of renewable power and energy storage, increasing environmental regulations, leveling demand, and the cumulative impact of other public policy requirements, collectively place continuing upward pressure on customers' rates."
- Reworded sentence: "Increasing levels of self-generation of electricity by customers (primarily solar installations) and customer enrollment in NEM and NBT, which allows self-generating customers to receive bill credits for power exported to the grid, shifts costs to other customers."
- Reworded sentence: "Increased renewable portfolio standards in the electric sector could also reduce electric generation gas load."
- Reworded sentence: "52 52 52 52 52 52 A confluence of technology-related cost declines, along with sustained or increased federal or state subsidies, could make a combination of distributed generation and energy storage a viable, cost-effective alternative to the Utility's bundled electric service which could further reduce energy demand."
- Reworded sentence: "If rates were to rise too rapidly, customer usage or the number of customers could decline."

**Prior (2023):**

The rates paid by the Utility's customers are impacted by the Utility's costs, commodity prices, and broader energy trends. The Utility's capital investment plan, increasing procurement of renewable power and energy storage, increasing environmental regulations, leveling demand, and the cumulative impact of other public policy requirements, collectively place continuing upward pressure on customer rates. In particular, the Utility will need to make substantial, sustained investments to its infrastructure to adapt to climate change. For more information on factors that could cause the Utility's costs to increase, see "The Utility's ratemaking and cost recovery proceedings may not authorize sufficient revenues, or the Utility's actual costs could exceed its authorized or forecasted costs due to various factors, including if the Utility is not able to manage its costs effectively" above. If customer rates increase, the CPUC may face greater pressure to approve lesser amounts in the Utility's ratemaking or cost recovery proceedings. 53 53 53 53 53 53 The Utility generally recovers its electricity and natural gas procurement costs through rates as "pass-through" costs. Increases in the Utility's commodity costs directly impact customer bills. Increasing levels of self-generation of electricity by customers (primarily solar installations) and customer enrollment in NEM, which allows self-generating customers to receive bill credits for power exported to the grid at the full retail rate, shifts costs to other customers. Under this structure, NEM customers do not pay their proportionate share of the cost of maintaining and operating the electric transmission and distribution system, including costs associated with funding social equity programs, subject to certain exceptions, while still receiving electricity from the system when their self-generation is inadequate to meet their electricity needs. These unpaid costs are subsidized by customers not participating in NEM. Accordingly, as more electric customers switch to NEM and self-generate energy, the burden on the remaining customers increases, which in turn encourages more self-generation, further increasing rate pressure on existing non-NEM customers. Other long-term trends could also increase costs for gas customers. Natural gas suppliers are subject to compliance with CARB's cap-and-trade program, and natural gas end-use customers have an increasing exposure to carbon costs under the program through 2030 (when the full cost will be reflected in customer bills). CARB may also require aggressive energy efficiency programs to reduce natural gas end use. Increased renewable portfolio standards in the electric sector could reduce electric generation gas load. Additionally, customers replacing natural gas appliances with electric appliances will lead to further reduced gas demand. The combination of reduced load and increased costs to maintain the gas system could result in higher natural gas customer bills. In addition, some local city governments have passed ordinances restricting use of natural gas in new construction and, if other jurisdictions follow suit, this could affect future demand for the provision of natural gas. If fewer customers receive gas from the Utility, the Utility's gas system maintenance costs, many of which cannot be reduced in the short term even if gas quantities decrease, would be borne by fewer customers. Finally, a mandate to purchase renewable natural gas for core customers could lead to increased costs for core customers if utilities are competing with the transportation sector for supplies of renewable natural gas. A confluence of technology-related cost declines and sustained federal or state subsidies could make a combination of distributed generation and energy storage a viable, cost-effective alternative to the Utility's bundled electric service which could further reduce energy demand. Reduced energy demand or significantly slowed growth in demand due to customer migration to other energy providers, adoption of energy efficient technology, conservation, increasing levels of distributed generation and self-generation, unless substantially offset through regulatory cost allocations, could increase the energy rates for other customers. If rates were to rise too rapidly, customer usage could decline. This decline would decrease the volume of sales, among which the Utility's costs are allocated, and increase rates. To relieve some of this upward rate pressure, the CPUC may authorize lower revenues than the Utility requested or increase the period over which the Utility is allowed to recover amounts, which could impact the Utility's ability to timely recover its operating costs. The Utility's level of authorized capital investment could decline as well, leading to a slower growth in rate base and earnings. As a result, PG&E Corporation's and the Utility's financial condition, results of operations, liquidity, and cash flows could be materially affected.

**Current (2024):**

The rates paid by the Utility's customers are impacted by the Utility's costs, commodity prices, and broader energy trends. The Utility's capital investment plan, increasing procurement of renewable power and energy storage, increasing environmental regulations, leveling demand, and the cumulative impact of other public policy requirements, collectively place continuing upward pressure on customers' rates. In particular, the Utility will need to make substantial, sustained investments to its infrastructure to adapt to climate change, enable the clean energy transition, and mitigate wildfire risk. For more information on factors that could cause the Utility's costs to increase, see "The Utility's ratemaking and cost recovery proceedings may not authorize sufficient revenues, or the Utility's actual costs could exceed its authorized or forecasted costs due to various factors" above. The CPUC considers affordability as it adjudicates the Utility's rate cases, and concerns about affordability could cause the CPUC to approve lesser amounts in the Utility's ratemaking or cost recovery proceedings. The Utility generally recovers its electricity and natural gas procurement costs through rates as "pass-through" costs. Increases in the Utility's commodity costs directly impact customer bills. Increasing levels of self-generation of electricity by customers (primarily solar installations) and customer enrollment in NEM and NBT, which allows self-generating customers to receive bill credits for power exported to the grid, shifts costs to other customers. Under this structure, NEM and NBT customers do not pay their proportionate share of the cost of maintaining and operating the electric transmission and distribution system, including costs associated with funding social equity programs, subject to certain exceptions, while still receiving electricity from the system when their self-generation is inadequate to meet their electricity needs. These unpaid costs are subsidized by customers not participating in NEM or NBT. Accordingly, as more electric customers switch to the NBT and self-generate energy, the burden on the remaining customers increases, which in turn encourages more self-generation, further increasing rate pressure on existing non-NEM or non-NBT customers. Other long-term trends could also increase costs for gas customers. Natural gas suppliers are subject to compliance with CARB's cap-and-trade program, and natural gas end-use customers have an increasing exposure to carbon costs under the program through 2030 (when the full cost will be reflected in customer bills). Increased renewable portfolio standards in the electric sector could also reduce electric generation gas load. CARB may also require aggressive energy efficiency programs to reduce natural gas end use consumption. Additionally, the Bay Area Air Quality Management District has adopted rules that restrict the sale of gas space and water heating appliances, and the CARB is considering similar rules. If other jurisdictions also adopt similar rules, reduced gas demand could accelerate customers replacing natural gas appliances with electric appliances. The combination of reduced load and increased costs to maintain the gas system could result in higher natural gas customer bills. In addition, some local city governments have passed ordinances restricting use of natural gas in new construction and, if other jurisdictions follow suit, this could affect future demand for the provision of natural gas. If fewer customers receive gas from the Utility, the Utility's gas system maintenance costs, many of which cannot be reduced in the short term even if gas quantities decrease, would be borne by fewer customers. Finally, a mandate to purchase renewable natural gas for core customers could lead to increased costs for core customers if utilities are competing with the transportation sector for supplies of renewable natural gas. 52 52 52 52 52 52 A confluence of technology-related cost declines, along with sustained or increased federal or state subsidies, could make a combination of distributed generation and energy storage a viable, cost-effective alternative to the Utility's bundled electric service which could further reduce energy demand. Reduced energy demand or significantly slowed growth in demand due to customer migration to other energy providers, adoption of energy efficient technology, conservation, increasing levels of distributed generation and self-generation, unless substantially offset through regulatory cost allocations, could increase the energy rates for other customers. If rates were to rise too rapidly, customer usage or the number of customers could decline. A decrease in the volume of sales, among which the Utility's costs are allocated, could further increase rates. To relieve some of this upward rate pressure, the CPUC may authorize lower revenues than the Utility requested or increase the period over which the Utility is allowed to recover amounts, which could impact the Utility's ability to timely recover its operating costs. The Utility's level of authorized capital investment could decline as well, leading to fewer new business interconnections and a slower growth in rate base and earnings. As a result, PG&E Corporation's and the Utility's financial condition, results of operations, liquidity, and cash flows could be materially affected.

---

## Modified: The Utility's operational networks and information technology systems could be impacted by a cyber incident, cybersecurity breach, or physical attack.

**Key changes:**

- Reworded sentence: "The Utility's electricity and natural gas systems rely on a complex, interconnected network of generation, transmission, distribution, control, and communication technologies, which can be damaged by natural events-such as severe weather or seismic events and by malicious events, such as physical and cyber attacks."
- Reworded sentence: "The Utility often relies on third-party vendors to host, maintain, modify, and update its systems (including providing security updates), and to provide other services to the Utility or the Utility's customers."

**Prior (2023):**

The Utility's electricity and natural gas systems rely on a complex, interconnected network of generation, transmission, distribution, control, and communication technologies, which can be damaged by natural events-such as severe weather or seismic events-and by malicious events, such as cyber and physical attacks. Private and public entities, such as the North American Electric Reliability Corporation, and the U.S. federal government, including the Departments of Defense, Homeland Security and Energy, and the White House, have noted that cyber-attacks targeting utility systems are increasing in sophistication, magnitude, and frequency. The Utility's operational networks also may face new cyber security risks due to modernizing and interconnecting the existing infrastructure with new technologies and control systems. Any failure or decrease in the functionality of the Utility's operational networks could cause harm to the public or employees, significantly disrupt operations, negatively impact the Utility's ability to safely generate, transport, deliver and store energy and gas or otherwise operate in the most safe and efficient manner or at all, and damage the Utility's assets or operations or those of third parties. 41 41 41 41 41 41 The Utility also relies on complex information technology systems that allow it to create, collect, use, disclose, store and otherwise process sensitive information, including the Utility's financial information, customer energy usage and billing information, and personal information regarding customers, employees and their dependents, contractors, and other individuals. The Utility often relies on third-party vendors to host, maintain, modify, and update its systems, and to provide other services to the Utility or the Utility's customers. In addition, the Utility is increasingly being required to disclose large amounts of data (including customer energy usage and personal information regarding customers) to support changes to California's electricity market related to grid modernization and customer choice. These third-party vendors could cease to exist, fail to establish adequate processes to protect the Utility's systems and information, or experience security incidents or inadequate security measures. Any incidents or disruptions in the Utility's information technology systems could impact the Utility's ability to track or collect revenues and to maintain effective internal controls over financial reporting. The Utility and its third-party vendors have been subject to, and will likely continue to be subject to, breaches and attempts to gain unauthorized access to the Utility's information technology systems or confidential data (including information about customers and employees), or to disrupt the Utility's operations. None of these breaches or attempts has individually or in the aggregate resulted in a security incident with a material effect on PG&E Corporation's and the Utility's financial condition, results of operations, liquidity, and cash flows. Despite implementation of security and control measures, there can be no assurance that the Utility will be able to prevent unauthorized access to its operational networks, information technology systems or data, or the disruption of its operations. Such events could subject the Utility to significant expenses, claims by customers or third parties, government inquiries, penalties for violation of applicable privacy laws, investigations, and regulatory actions that could result in material fines and penalties, loss of customers and harm to PG&E Corporation's and the Utility's reputation, any of which could have a material effect on PG&E Corporation's and the Utility's financial condition, results of operations, liquidity, and cash flows. The Utility maintains cyber liability insurance that covers certain damages caused by cyber incidents. However, there is no assurance that adequate insurance will continue to be available at rates the Utility believes are reasonable or that the costs of responding to and recovering from a cyber incident will be covered by insurance or recoverable through rates.

**Current (2024):**

The Utility's electricity and natural gas systems rely on a complex, interconnected network of generation, transmission, distribution, control, and communication technologies, which can be damaged by natural events-such as severe weather or seismic events and by malicious events, such as physical and cyber attacks. Nationally, there has been an increase in physical attacks on substations. Physical attacks targeting the Utility's physical assets or personnel could cause damage, disrupt operations, or cause injuries. Cyber attacks targeting utility systems are significant and are continuing to increase in sophistication, magnitude, and frequency. Any failure, interruption, or decrease in the functionality of the Utility's operational networks could cause harm to the public or employees, significantly disrupt operations, negatively impact the Utility's ability to safely generate, transport, deliver and store energy and gas or otherwise operate in a safe and efficient manner or at all, and damage the Utility's assets or operations or those of third parties. 41 41 41 41 41 41 The Utility also relies on complex information technology systems that allow it to create, collect, use, disclose, store and otherwise process sensitive information, including the Utility's financial information, customer energy usage and billing information, and personal information regarding customers, employees and their dependents, contractors, and other individuals, and portions of such sensitive information may be required to be encrypted by the Utility. In addition, the Utility is increasingly being required to disclose large amounts of data (including customer energy usage and personal information regarding customers) to support changes to California's electricity market related to grid modernization and customer choice. The Utility often relies on third-party vendors to host, maintain, modify, and update its systems (including providing security updates), and to provide other services to the Utility or the Utility's customers. These third-party vendors could cease to exist, fail to adopt and implement adequate processes to protect the Utility's systems and information, fail to provide timely software updates (and even if timely provided, there could be a delay in the installation of the updates), fail to detect security vulnerabilities, or experience security incidents or inadequate security measures. Any such incidents or disruptions in the Utility's information technology systems could impact the Utility's ability to track or collect revenues and to maintain effective internal controls over financial reporting. PG&E Corporation and the Utility face various cybersecurity threats, including attempts to gain unauthorized access to their systems and networks, denial-of-service attacks, threats to their information technology infrastructure, ransomware and phishing attacks, and attempts to gain unauthorized access to confidential or sensitive information about the Utility, customers and employees. These threats come from a variety of highly organized actors, including nation-state actors. PG&E Corporation, the Utility and their third-party vendors have been subject to, and will likely continue to be subject to, threats, breaches and attempts to gain unauthorized access to the Utility's information technology systems or confidential or sensitive data (including information about customers and employees), or to disrupt the Utility's operations. The Utility may not be able to prevent unauthorized access to its operational networks, information technology systems or data, or the disruption of its operations. Such events could subject the Utility to significant expenses, claims by customers or third parties, government inquiries, penalties for violation of applicable privacy laws, investigations, lawsuits, and regulatory actions and could result in material fines, penalties, loss of customers, and harm to PG&E Corporation's and the Utility's reputation, any of which could have a material effect on PG&E Corporation's and the Utility's business strategy, financial condition, or results of operations. For more information, see Item 1C. Cybersecurity. The Utility maintains cyber liability insurance that covers certain losses and damages caused by cyber incidents, but adequate insurance may not continue to be available at rates the Utility believes are reasonable, or the costs of responding to and recovering from a cyber incident may not be covered by insurance or recoverable through rates.

---

## Modified: Risks related to wildfires, including risks related to:

**Key changes:**

- Reworded sentence: "•The extent to which the Wildfire Fund and revised recoverability standard under AB 1054 effectively mitigate the risk of liability for damages arising from catastrophic wildfires; •The 2019 Kincade fire, the 2020 Zogg fire, the 2021 Dixie fire, the 2022 Mosquito fire, or future wildfires; •Recovery of excess costs in connection with wildfires; and •Implementation of wildfire mitigation initiatives."

**Prior (2023):**

•The extent to which the Wildfire Fund and revised recoverability standard under AB 1054 effectively mitigate the risk of liability for damages arising from catastrophic wildfires; •The 2019 Kincade fire, the 2020 Zogg fire, the 2021 Dixie fire, the 2022 Mosquito fire, or future wildfires; •Recovery of excess costs in connection with wildfires; and 35 35 35 35 35 35 •Implementation of wildfire mitigation initiatives.

**Current (2024):**

•The extent to which the Wildfire Fund and revised recoverability standard under AB 1054 effectively mitigate the risk of liability for damages arising from catastrophic wildfires; •The 2019 Kincade fire, the 2020 Zogg fire, the 2021 Dixie fire, the 2022 Mosquito fire, or future wildfires; •Recovery of excess costs in connection with wildfires; and •Implementation of wildfire mitigation initiatives.

---

## Modified: Risk Factors Summary

**Prior (2023):**

The following is a summary of the principal risks that could adversely affect our business, operations, and financial results. These risks are discussed more fully below.

**Current (2024):**

The following is a summary of the principal risks that could adversely affect our business, operations, and financial results. These risks are discussed more fully below. 35 35 35 35 35 35

---

## Modified: The Utility may be unable to attract and retain specialty personnel and may face workforce disruptions.

**Key changes:**

- Reworded sentence: "The Utility's efforts to recruit and train new field service personnel may be ineffective, and the Utility may be faced with a shortage of experienced and qualified personnel in certain specialty operational positions."

**Prior (2023):**

The Utility's workforce is aging, and many employees are or will become eligible to retire within the next few years. Although the Utility has undertaken efforts to recruit and train new field service personnel, the Utility may be faced with a shortage of experienced and qualified personnel in certain specialty operational positions. Additionally, the Utility could experience labor disruptions from personnel in those positions. If the Utility were to experience such a shortage or disruptions, work stoppages could occur. Any such occurrences could materially affect PG&E Corporation's and the Utility's financial condition, results of operations, liquidity, and cash flows.

**Current (2024):**

The Utility's workforce is aging, and many employees are or will become eligible to retire within the next few years. The Utility's efforts to recruit and train new field service personnel may be ineffective, and the Utility may be faced with a shortage of experienced and qualified personnel in certain specialty operational positions. Additionally, the Utility could experience workforce disruptions from personnel in those positions as a result of labor activity, the COVID-19 pandemic or other pandemics, or governmental regulation of pandemic protections. If the Utility were to experience such a shortage or disruptions, work stoppages could occur. Any such occurrences could materially affect PG&E Corporation's and the Utility's financial condition, results of operations, liquidity, and cash flows. 43 43 43 43 43 43

---

## Modified: Inflation and supply chain issues may adversely affect PG&E Corporation and the Utility.

**Key changes:**

- Reworded sentence: "PG&E Corporation and the Utility have observed that prices for equipment, materials, supplies, employee labor, contractor services, and variable-rate debt have increased and may continue to increase more quickly than expected as a result of inflation."

**Prior (2023):**

PG&E Corporation and the Utility have observed that prices for equipment, materials, supplies, employee labor, contractor services, and variable-rate debt have increased. Long-term inflationary pressures may result in such prices continuing to increase more quickly than expected. Increases in inflation raises costs for labor, materials and services, and PG&E Corporation and the Utility may be unable to secure these resources on economically acceptable terms or offset such costs with increased revenues, operating efficiencies, or cost savings, which may adversely impact PG&E Corporation's and the Utility's financial conditions, results of operations, liquidity, and cash flows.

**Current (2024):**

PG&E Corporation and the Utility have observed that prices for equipment, materials, supplies, employee labor, contractor services, and variable-rate debt have increased and may continue to increase more quickly than expected as a result of inflation. Additionally, the Utility has experienced shortages in certain items, longer lead times, and delivery delays as a result of domestic and international raw material and labor shortages. If these disruptions to the supply chain persist or worsen, the Utility may be delayed or prevented from completing planned maintenance and capital projects work. PG&E Corporation and the Utility may be unable to secure these resources on economically acceptable terms or offset such costs with increased revenues, operating efficiencies, or cost savings, which may adversely affect PG&E Corporation's and the Utility's financial condition, results of operations, liquidity, and cash flows.

---