---
ticker: SRE
company: Sempra Energy
filing_type: 10-K
year_current: 2025
year_prior: 2024
risks_added: 15
risks_removed: 15
risks_modified: 34
risks_unchanged: 14
source: SEC EDGAR
url: https://riskdiff.com/sre/2025-vs-2024/
markdown_url: https://riskdiff.com/sre/2025-vs-2024/index.md
generated: 2026-05-10
---

# Sempra Energy: 10-K Risk Factor Changes 2025 vs 2024

> Source: U.S. Securities and Exchange Commission (EDGAR)  
> Generated: 2026-05-10  
> All data extracted directly from official filings. No hallucinated content.

> **[AI-Generated Summary]** The paragraph below was produced by a language
> model and may contain errors. All other content on this page is deterministically
> extracted from the original SEC filing.

> Sempra Energy substantially reorganized its risk disclosure with 34 modified risks representing the largest category of change, while adding 15 new risks and removing 15 others to maintain a total of 78 risk factors. Notable removals include risks specific to Mexican Stock Exchange listing and asset impairment, replaced by new disclosures on capital expenditure execution, infrastructure system risks, and Sempra Infrastructure's financing needs. The modifications concentrated on debt obligations, severe weather exposure, and Mexico property rights issues, reflecting shifts in strategic focus toward capital-intensive growth initiatives and climate-related operational challenges.

---

## Summary

| Status | Count |
|--------|-------|
| New risks added | 15 |
| Risks removed | 15 |
| Risks modified | 34 |
| Unchanged | 14 |

---

## New in Current Filing: Successfully completing our five-year capital expenditures plan is subject to certain risks.

The execution of our five-year capital expenditures plan may not be completed in accordance with current expectations or produce the desired results. Factors that have historically impacted and could continue to impact the amount, timing and types of capital expenditures we make include the cost and availability of financing; economic and market conditions; regulatory approvals; changes in tax law; business opportunities providing desirable rates of return; forecasts related to safety, reliability and load growth, gas system planning, and transportation electrification; safety and environmental requirements and climate-related policies; and cooperation of third-parties, including customers, partners, suppliers, lenders and others. We discuss these and other relevant factors under "Risks Related to All Sempra Businesses" below. We aim to finance our five-year capital expenditures plan in a manner that will maintain our investment-grade credit ratings and capital structure, but there can be no guarantee that we will be able to do so. SDG&E and SoCalGas may be required to make significant expenditures before they can request rate recovery for certain capital projects. There can be no guarantee that such capital expenditures will be recoverable through rates. A significant portion of Oncor's five-year capital expenditures plan is attributable to expected growth in ERCOT, particularly due to increased demand from large commercial and industrial customers. Changes in projected growth in ERCOT could materially impact Oncor's capital expenditures and consequently our capital expenditures plan. Furthermore, there can be no guarantee that any of Oncor's capital expenditures will ultimately be recoverable through rates. The occurrence of any of these risks could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects.

---

## New in Current Filing: 2024 Form 10-K | 39

Table of Contents Table of Contents In such cases, we could be required to issue and deliver shares of our common stock under the terms of the physical settlement, which would result in dilution to our EPS and may adversely affect the market price of our common stock, Series C preferred stock and any other series of preferred stock we may issue in the future. The forward price that we expect to receive upon physical settlement of a forward sale agreement will be subject to adjustment on a daily basis based on a floating interest rate factor. If the specified daily rate is less than the applicable spread on any day, this will result in a daily reduction of the forward price. In addition, the forward price will be subject to decrease on certain dates specified in the relevant forward sale agreement by the amount per share of quarterly dividends we expect to declare on our common stock during the term of such forward sale agreement. We will generally have the right, in lieu of physical settlement of any forward sale agreement, to elect cash or net share settlement in respect of any or all of the shares of our common stock subject to such forward sale agreement. If we elect to cash or net share settle all or any part of any forward sale agreement, we would expect to issue a substantially lower number of shares than if we settled by physical delivery, but would not receive the cash for the shares that would have otherwise been issued if we settled the entire forward sale agreement by physical delivery and, as a result, would not derive the same credit metrics benefits. If the price of our common stock at which these purchases are made by such forward purchaser (or its affiliate) exceeds the applicable forward price, we will pay such forward purchaser an amount in cash equal to such difference (if we elect to cash settle) or we will deliver to such forward purchaser a number of shares of our common stock having a market value equal to such difference (if we elect to net share settle). Any such difference could be significant and could require us to pay a significant amount of cash or deliver a significant number of shares of our common stock to such forward purchaser. The purchase of shares of our common stock by a forward purchaser or its affiliate to unwind the forward purchaser's hedge position could cause the price of our common stock to increase above the price that would have prevailed in the absence of those purchases (or prevent a decrease in such price), thereby increasing the amount of cash (in the case of cash settlement) or the number of shares (in the case of net share settlement) that we would owe such forward purchaser upon settlement of the applicable forward sale agreement or decreasing the amount of cash (in the case of cash settlement) or the number of shares (in the case of net share settlement) that such forward purchaser would owe us upon settlement of the applicable forward sale agreement.

---

## New in Current Filing: Our businesses are subject to risks arising from their infrastructure and systems that support this infrastructure.

Our facilities and the systems that interconnect and/or manage them are subject to risks of, among other things, equipment or process failures due to aging or degrading infrastructure or otherwise; human error; loss or outage of a key technology platform or system; shortages of or delays in obtaining equipment, materials, commodities or labor, which have been and may in the future be

---

## New in Current Filing: We actively seek opportunities in the market through acquisitions, partnerships, JVs and divestitures.

We diligently analyze the financial viability of each acquisition, divestiture, partnership and JV we pursue. However, our diligence may prove to be insufficient and there could be latent or unforeseen defects. In addition, we may not realize all the anticipated benefits from future acquisitions, divestitures, partnerships or JVs for various reasons, including difficulties integrating or separating operations and personnel effectively or in a timely manner, higher or unexpected transaction or operating costs, unknown liabilities, and fluctuations in markets. Any of these outcomes could materially adversely affect our results of operations, financial condition, cash flows and/or prospects.

---

## New in Current Filing: 2024 Form 10-K | 42

Table of Contents Table of Contents able to be passed through to customers. We have sought and continue to seek a variety of federal and state funding opportunities, such as government incentives and subsidies under the IRA, for these activities and projects. These efforts can involve significant employee resources and increased compliance requirements and have not always been successful in securing funding on acceptable terms or at all. In some cases, applicable compliance requirements may cost more than the potential funding opportunity, limiting our ability to pursue available funding. In addition, the timing to complete these activities and projects is inherently uncertain and may require significantly more resources than we initially anticipate. Moreover, many of these technologies are in the early stage of development and may not prove economically and technically feasible or be accepted by regulators, and the applicable activities and projects may not be completed. If any of these circumstances occurs, we may not receive an adequate or any return on our investment in these activities and our results of operations, financial condition, cash flows and/or prospects could be materially adversely affected.

---

## New in Current Filing: 2024 Form 10-K | 44

Table of Contents Table of Contents ▪for Sempra and SDG&E, risks related to California wildfires ▪for Sempra, SDG&E and SoCalGas, any deterioration of or uncertainty in the political or regulatory environment for local natural gas distribution companies operating in California ▪credit ratings downgrades, such as S&P's January 2025 actions that revised Sempra's outlook to negative from stable and downgraded SoCalGas' issuer credit rating to A- from A.

---

## New in Current Filing: An impairment of our goodwill or long-lived assets could result in a material charge to earnings.

We test long-lived assets, including equity method investments, for recoverability when events or changes in circumstances have occurred that may affect the recoverability or the estimated useful lives of the assets. We test goodwill for impairment annually or when events or changes in circumstances necessitate a valuation. We could experience such an event or change in circumstances from, among other things, (i) an inability to operate our existing facilities, (ii) an inability to collect from customers, (iii) changes to laws or regulations or other circumstances affecting the energy sector or our assets in Mexico, (iv) adverse rulings in lawsuits, binding arbitrations, regulatory proceedings, audits and other proceedings materially impacting our businesses, including our equity method investments such as Oncor Holdings and Cameron LNG JV, and (v) more generally any loss of permits or approvals that requires us to adjust or cease certain operations and any failure to complete or receive an adequate return on our investments in capital projects. A material charge to earnings from an impairment loss could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects.

---

## New in Current Filing: We face risks related to environmental and climate change regulation and the costs of the energy transition.

The impacts from the mitigation of climate change and related regulations may increase the costs we incur to procure and transmit energy and provide other services. The changes in costs and preferences for lower carbon and renewable energy sources may impact the demand for, consumption of, and type of energy we transmit and distribute. Environmental and Climate Change Regulation We are subject to extensive federal, state, regional, local and foreign statutes, orders, rules and regulations relating to climate change and environmental protection. To comply with these requirements, we must expend significant capital and employee resources on environmental monitoring, surveillance and other measures to track performance; acquisition and installation of pollution control equipment; mitigation efforts; and emissions fees, which could increase as a result of various factors we may not control, including changing laws and regulations, increased readiness and enforcement activities, delays in the renewal and issuance of permits, and changes to the mix of energy we transmit and distribute. In addition, we are generally responsible for hazardous substances and other contamination on and the conditions of our projects and properties, regardless of when these conditions arose and whether they are known or unknown. We have been and may in the future be required to pay environmental remediation costs at former facilities and off-site waste disposal sites where any of our businesses is identified as a PRP under federal, state and local environmental laws. For our regulated utilities, some or all of these costs may not be recoverable in rates. Failure to comply with environmental laws and regulations may subject us to fines and penalties, including criminal penalties in some cases, and/or curtailment of our operations. Moreover, increasing international, national, regional, state and local environmental concerns and related changes to applicable legal and regulatory frameworks, such as requirements for increased monitoring and surveillance, disclosures on environmental performance, pollution monitoring and control equipment, safety

---

## New in Current Filing: 2024 Form 10-K | 48

Table of Contents Table of Contents we further modify our GHG emissions reduction aims or there are negative views about our environmental disclosures or practices generally. We develop our capital expenditure plans based on forecasts as well as regulatory and compliance requirements, including those related to safety, reliability and load growth, gas system planning, and transportation electrification, which generally assume that California will continue to pursue consistent environmental and climate-related policies. If the federal government withdraws its support for grid and infrastructure modernization or prohibits California from pursuing its environmental and climate-related policies, or if California changes its policies, SDG&E, SoCalGas and Sempra may be unable to meet their respective aims. The occurrence of any of these risks could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects.

---

## New in Current Filing: 2024 Form 10-K | 51

Table of Contents Table of Contents CARB, California's primary regulator for GHG emissions reduction programs, is evaluating various options for reducing natural gas demand through building decarbonization measures and is considering a proposed statewide zero-emissions standard for space and water heaters. Additionally, the CEC adopted changes to the Title 24 California Building Standards Code that require newly constructed residential and commercial buildings to include heat pump technologies for space and water heating beginning in 2026. The CPUC has an open proceeding to establish policies, processes, and rules governing safe and reliable gas system operation and long-term gas system infrastructure planning for natural gas utilities in alignment with California's decarbonization goals. Potential outcomes include reductions in natural gas demand over time in favor of electrification, renewable energy alternatives, and/or cleaner fuels and changes to rate and cost recovery policies. A substantial reduction in or the elimination of natural gas use in California without adequate recovery of investments could result in impairment of some or all of SoCalGas' and SDG&E's natural gas infrastructure assets if they were not permitted to be repurposed for alternative fuels, were required to be depreciated on an accelerated basis or were to become stranded, which could have a material adverse effect on SoCalGas', SDG&E's and Sempra's results of operations, financial conditions, cash flows and/or prospects.

---

## New in Current Filing: SDG&E and SoCalGas are subject to extensive regulation.

Rates and Other Financial Matters The CPUC regulates SDG&E's and SoCalGas' customer rates, except for SDG&E's electric transmission rates that are regulated by the FERC, and conditions of service. The CPUC also regulates SDG&E's and SoCalGas' sales of securities, rates of return, capital structure, rates of depreciation, long-term resource procurement and other financial matters in various ratemaking proceedings. The CPUC periodically approves SDG&E's and SoCalGas' customer rates based on authorized capital expenditures, operating costs, including income taxes, and an authorized rate of return on investments while incorporating a risk-based decision-making framework, as well as certain settlements with third parties and mandatory social programs. The timing and outcome of ratemaking proceedings can be affected by various factors, many of which are not in our control, including the level of opposition by intervening parties; any rejection by the CPUC of settlements with third parties; increasing levels of regulatory review; changes in the political, regulatory, or legislative environments; and the opinions of regulators, customers and other stakeholders.

---

## New in Current Filing: 2024 Form 10-K | 54

Table of Contents Table of Contents was implemented for customers who interconnect their qualifying on-site renewable energy generation after April 2023. The new Net Billing Tariff revised the NEM structure for new customers with a retail export compensation rate that is better aligned with the value provided to the grid by behind-the-meter energy generation systems and retail import rates that encourage electrification and adoption of solar systems paired with storage. The new Net Billing Tariff is designed to compensate customers for the value of their exports to the grid based on avoided cost. Additionally, in response to California legislation adopted in 2022, the CPUC initiated a rulemaking to broadly restructure the way fixed costs are collected, moving away from volumetric only charges and incorporating an income-graduated fixed charge for default residential rates. The intent of such a fixed charge is to establish a rate structure that allows the utility to collect a greater portion of its fixed costs on a non-volumetric basis, advance the state's climate goals through end-use electrification and provide a more affordable rate design on average for lower-income customers. In May 2024, the CPUC adopted a residential fixed charge with implementation expected to begin in the fourth quarter of 2025. Depending on the effectiveness of the new Net Billing Tariff and fixed charge, which are uncertain, the risks associated with the existing NEM tariff and rate design, including adverse impacts on electricity rates and the reliability of the transmission and distribution system and the potential for increased customer dissatisfaction, increased likelihood of noncompliance with CPUC or other safety or operational standards, and increased power procurement, operating, capital and other costs that may not be recoverable, could continue or increase, any of which could have a material adverse effect on SDG&E's and Sempra's results of operations, financial condition, cash flows and/or prospects.

---

## New in Current Filing: 2024 Form 10-K | 56

Table of Contents Table of Contents Merger will not affect the conclusions reached in, respectively, the IRS private letter ruling and tax opinions issued with respect to the spin-off described above. Similar to the IRS private letter ruling and opinions issued with respect to the spin-off, the supplemental private letter ruling is generally binding on the IRS and any opinions issued with respect to the Merger are based on factual representations and assumptions, as well as certain undertakings, made by Sempra and EFH. If such representations and assumptions are untrue or incomplete, any such undertakings are not complied with, or the facts upon which the IRS supplemental private letter ruling or tax opinions (which will not impact the IRS position on the transactions) are based are different from the actual facts relating to the Merger, the tax opinions and/or supplemental private letter ruling may not be valid and could be challenged by the IRS. Even though Sempra Texas Holdings Corp. would have administrative appeal rights if the IRS were to invalidate its private letter ruling and/or supplemental private letter ruling, including the right to challenge any adverse IRS position in court, any such appeal would be subject to uncertainties and could fail. If it is ultimately determined that the Merger caused the spin-off not to qualify for the Intended Tax Treatment, Sempra, through its ownership of Sempra Texas Holdings Corp., could incur substantial tax liabilities, which would materially reduce the value associated with our investment in Oncor and could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects.

---

## New in Current Filing: Sempra Infrastructure's business is capital-intensive and relies on various types of financing arrangements, which may not be adequate or available in the future.

Sempra Infrastructure's business is capital-intensive, with significant and increasing capital spending expected in future periods. It relies on various types of financing to meet its capital requirements, including capital contributions from Sempra and NCI owners, as well as external financing such as loans and other forms of project financing that could impose guarantees, indemnities or other obligations. These arrangements could expose us to risks, including exposure to losses upon the occurrence of certain events related to the development, construction, operation or financing of the applicable projects. In addition, external sources of capital may not be adequate or available on reasonable terms. Any of these outcomes could have a material adverse effect on our future results of operations, financial condition, cash flows and/or prospects.

---

## New in Current Filing: 2024 Form 10-K | 61

Table of Contents Table of Contents U.S. and Foreign Laws and International Relations Our international business activities are subject to laws and regulations in the U.S. and Mexico and other countries where we do business related to foreign operations and doing business internationally, including the U.S. Foreign Corrupt Practices Act, the Mexican Federal Anticorruption Law in Public Contracting (Ley Federal Anticorrupción en Contrataciones Públicas) and similar laws, and are sensitive to foreign policy, trade policy and other geopolitical factors related to or applicable in each of these countries. The current and the last U.S. Administrations have taken different stances with respect to international trade agreements, tariffs, immigration policy and other matters of foreign policy that impact trade and foreign relations. The current U.S. Administration proposed imposing new tariffs on Mexico that are currently deferred, but may become effective in the near term, and other tariffs could potentially be imposed by the current U.S. Administration. The Mexican government has announced plans to implement retaliatory tariffs in response to the U.S. Administration's proposed tariffs, if and when they are imposed, but the details of those tariffs have not yet been disclosed. In addition, the U.S. Administration has announced tariffs on imports of steel and aluminum beginning on March 12, 2025. These materials are integral to the construction of energy infrastructure and could have a significant impact on the costs associated with the construction of the same, whether directly or indirectly. Other shifts in foreign policy could create uncertainty and result in or increase adverse effects on our businesses. Violations or alleged violations of the laws referred to above, as well as foreign policy positions, sanctions or imposition of new or greater tariffs that adversely affect imports and exports between the U.S., Mexican and other foreign countries where we conduct business, could materially adversely affect our results of operations, financial condition, cash flows and/or prospects.

---

## No Match in Current: Any impairment of our assets could negatively impact us.

*This section from the 2024 filing does not have a high-confidence textual match in 2025. It may have been removed, merged, or substantially reworded.*

We could experience a reduction in the fair value of our assets, including our investments that we account for under the equity method, upon the occurrence of many of the risks discussed in these risk factors and elsewhere in this report, such as from any inability to operate our existing facilities or develop new projects in Mexico due to recent and proposed changes to laws or regulations or other circumstances affecting the energy sector or our assets in that country, and more generally any loss of permits or approvals that requires us to adjust or cease certain operations and any failure to complete or receive an adequate return on our investments in capital projects. Any such reduction in the fair value of our assets or investments could result in an impairment loss that could materially adversely affect our results of operations for the period in which the charge is recorded. We discuss our impairment testing of long-lived assets and goodwill and the factors considered in such testing in "Part II - Item 7. MD&A - Critical Accounting Estimates" and in Note 1 of the Notes to Consolidated Financial Statements.

---

## No Match in Current: 2023 Form 10-K | 35

*This section from the 2024 filing does not have a high-confidence textual match in 2025. It may have been removed, merged, or substantially reworded.*

Table of Contents Table of Contents equity (as we did in November 2023) or convertible debt securities, which may materially dilute the voting rights and economic interests of holders of our outstanding common and preferred stock and materially adversely affect the trading price of our common and preferred stock.

---

## No Match in Current: Our common stock is listed on the Mexican Stock Exchange and registered with the CNBV, which subjects us to additional regulation and liability in Mexico.

*This section from the 2024 filing does not have a high-confidence textual match in 2025. It may have been removed, merged, or substantially reworded.*

In addition to being listed on the NYSE, our common stock is listed on the Mexican Stock Exchange and registered with the CNBV. Such listing and registration subjects us to filing and other requirements in Mexico that have increased our costs and risks of noncompliance. In addition, the CNBV, as the Mexican securities market regulator, has the authority to inspect Sempra's business, primarily through requests for information and documents; impose fines or penalties on Sempra and its directors and officers for violations of Mexican securities laws and regulations; and seek criminal liability for certain actions conducted or with effects in Mexico. The occurrence of any of these risks could materially adversely affect our results of operations, financial condition, cash flows and/or prospects.

---

## No Match in Current: 2023 Form 10-K | 36

*This section from the 2024 filing does not have a high-confidence textual match in 2025. It may have been removed, merged, or substantially reworded.*

Table of Contents Table of Contents reasonable terms or at all, we could lose our rights to occupy and use these properties and the related facilities, which could prevent, limit or delay existing or proposed operations or projects, increase our costs, and result in breaches of permits or contracts and related legal costs, impairments, fines or penalties. Any such outcome could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects.

---

## No Match in Current: 2023 Form 10-K | 37

*This section from the 2024 filing does not have a high-confidence textual match in 2025. It may have been removed, merged, or substantially reworded.*

Table of Contents Table of Contents incidents targeting our or our vendors' information systems; the integrity of the energy grid, our pipelines or our distribution, storage and other infrastructure; or our confidential information could result in disruptions to our business operations, regulatory compliance failures, inability to produce accurate and timely financial statements, energy delivery failures, financial and reputational loss, litigation, violations of applicable laws and fines or penalties, any of which could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects. Although Sempra currently maintains cyber liability insurance, this insurance is limited in scope and subject to exceptions, conditions and coverage limitations and may not cover a substantial portion or any of the costs associated with a compromise of our information systems or confidential information, and there is no guarantee that the insurance we currently maintain will continue to be available at rates we believe are reasonable.

---

## No Match in Current: We seek growth opportunities in the market organically and inorganically, including through the acquisition of, or partnerships in, operating companies.

*This section from the 2024 filing does not have a high-confidence textual match in 2025. It may have been removed, merged, or substantially reworded.*

We diligently analyze the financial viability of each acquisition, partnership and JV we pursue. However, our diligence may prove to be insufficient and there could be latent or unforeseen defects. In addition, we may not realize all the anticipated benefits from future acquisitions, partnerships or JVs for various reasons, including difficulties integrating operations and personnel to our standards or in a timely manner, higher and unexpected acquisition and operating costs, unknown liabilities, and fluctuations in markets. Any of these outcomes could materially adversely affect our results of operations, financial condition, cash flows and/or prospects.

---

## No Match in Current: Our businesses face climate change concerns and have environmental compliance and clean energy transition and reporting costs.

*This section from the 2024 filing does not have a high-confidence textual match in 2025. It may have been removed, merged, or substantially reworded.*

Climate change and the costs associated with its impacts and mitigation may adversely affect us, including by increasing the costs we incur to transmit energy and provide other services, impacting the demand for and consumption of the energy we transmit and distribute (due to changes in costs, increasingly common severe weather events and other weather patterns, the type of energy transmitted as a result of increasing customer preference for carbon-neutral and renewable sources of energy, and other factors), and affecting the economic health of the regions in which we operate.

---

## No Match in Current: 2023 Form 10-K | 42

*This section from the 2024 filing does not have a high-confidence textual match in 2025. It may have been removed, merged, or substantially reworded.*

Table of Contents Table of Contents businesses, may not be able to be passed through to customers. Even if such costs are recoverable, these costs, coupled with necessary safety and reliability investments, may negatively impact the affordability of SDG&E's and SoCalGas' customer rates and, for our non-regulated-utility businesses, may cause costs to increase to levels that reduce customer demand and growth. SDG&E and SoCalGas, as well as any of our other businesses affected by GHG emissions mandates, may also be subject to fines and penalties if mandated renewable energy goals are not met, and all our businesses could suffer difficulties attracting investors and business partners, reputational harm and other negative effects if we do not meet or if we scale back our GHG emissions goals or there are negative views about our environmental disclosures or practices generally. The occurrence of any of these risks could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects.

---

## No Match in Current: The electricity industry is undergoing significant change, including increased deployment of DER, technological advancements, evolving procurement service standards, and political and regulatory developments.

*This section from the 2024 filing does not have a high-confidence textual match in 2025. It may have been removed, merged, or substantially reworded.*

Electric utilities in California are experiencing increasing deployment of DER, such as solar generation, energy storage and energy efficiency and demand management technologies, and California's environmental policy objectives are accelerating the pace and scope of these changes. This growth of DER will require further modernization of the electric grid to, among other things, accommodate increasing two-way flows of electricity and increase the grid's capacity to interconnect these resources. In addition, attaining California's clean energy goals will require sustained investments in transmission and distribution grid modernization, renewable integration projects, energy efficiency programs, operational and data management systems, and electric vehicle and energy storage infrastructure. The growth of third-party energy storage alternatives and other technologies also may increasingly compete with SDG&E's traditional transmission and distribution infrastructure in delivering electricity to consumers. Certain FERC transmission development projects are open to competition, allowing independent developers to

---

## No Match in Current: 2023 Form 10-K | 45

*This section from the 2024 filing does not have a high-confidence textual match in 2025. It may have been removed, merged, or substantially reworded.*

Table of Contents Table of Contents ▪uncertainties with respect to the technological and financial aspects of decommissioning the facility SDG&E maintains the SONGS NDT to provide funds for nuclear decommissioning. Trust assets generally have been invested in equity and debt securities, which are subject to market fluctuations. A decline in the market value of trust assets, an adverse change in the law regarding funding requirements for decommissioning trusts, or changes in assumptions or forecasts related to decommissioning dates, technology and the cost of labor, materials and equipment due to inflationary pressures or otherwise could increase the funding requirements for these trusts, which costs may not be fully recoverable in rates. In addition, CPUC approval is required to make withdrawals from the NDT, and CPUC approval for certain expenditures may be denied if the CPUC determines the expenditures are unreasonable. In addition, decommissioning may be materially more expensive than we currently anticipate and therefore decommissioning costs may exceed the amounts in the NDT. Rate recovery for overruns would require CPUC approval, which may not occur. The occurrence of any of these events could result in a reduction in our expected recovery and have a material adverse effect on SDG&E's and Sempra's results of operations, financial condition, cash flows and/or prospects.

---

## No Match in Current: 2023 Form 10-K | 47

*This section from the 2024 filing does not have a high-confidence textual match in 2025. It may have been removed, merged, or substantially reworded.*

Table of Contents Table of Contents Natural Gas Storage Operations and Reliability In February 2017, the CPUC opened proceeding SB 380 OII to determine the feasibility of minimizing or eliminating the use of the Aliso Canyon natural gas storage facility while still maintaining energy and electric reliability for the region, including analyzing alternative means for meeting or avoiding the demand for the facility's services if it were eliminated. If the Aliso Canyon natural gas storage facility were to be permanently closed or if future cash flows from its operation were otherwise insufficient to recover its carrying value, we may record an impairment of the facility, which could be material, incur materially higher than expected operating costs and/or be required to make material additional capital expenditures (any or all of which may not be recoverable in rates), and natural gas reliability and electric generation could be jeopardized. Any such outcome could have a material adverse effect on SoCalGas' and Sempra's results of operations, financial condition, cash flows and/or prospects. Accounting and Other Impacts At December 31, 2023, $31 million is accrued in Reserve for Aliso Canyon Costs and $2 million is accrued in Deferred Credits and Other on SoCalGas' and Sempra's Consolidated Balance Sheets. These accruals do not include any amounts in excess of what has been reasonably estimated to resolve certain matters that we describe in "Litigation" above, nor any amounts that may be necessary to resolve threatened litigation, other potential litigation or other costs. We are not able to reasonably estimate the possible loss or a range of possible losses in excess of the amounts accrued, which could be significant and could have a material adverse effect on SoCalGas' and Sempra's results of operations, financial condition, cash flows and/or prospects.

---

## No Match in Current: 2023 Form 10-K | 48

*This section from the 2024 filing does not have a high-confidence textual match in 2025. It may have been removed, merged, or substantially reworded.*

Table of Contents Table of Contents distribution system, such failure could have a material adverse effect on SDG&E's and Sempra's results of operations, financial condition, cash flows and/or prospects.

---

## No Match in Current: 2023 Form 10-K | 49

*This section from the 2024 filing does not have a high-confidence textual match in 2025. It may have been removed, merged, or substantially reworded.*

Table of Contents Table of Contents approval of its requests in any rate proceeding could adversely impact Oncor, which could adversely impact us, and those impacts could be material. The costs and burdens associated with complying with the various legislative and regulatory requirements to which Oncor is subject at the federal, state, and local levels and adjusting Oncor's business and operations in response to legislative and regulatory developments, including changes in ERCOT, and any fines or penalties that could result from any noncompliance, may have a material adverse effect on Oncor. In addition, insufficient electric capacity within ERCOT or significant changes within ERCOT or to the ERCOT market structure that impact transmission and distribution utilities, including additional regulatory requirements or oversight, could materially adversely affect Oncor. Moreover, legislative, regulatory, market or industry activities could adversely impact Oncor's collections and cash flows and jeopardize the predictability of utility earnings. For instance, the PUCT has instituted various projects reviewing the regulatory framework regarding DER and other non-traditional technologies. As DER usage continues to grow, related regulatory decisions, including with respect to ERCOT market rules and transmission and distribution utilities' ability to invest in non-traditional electricity delivery solutions, could adversely impact Oncor's revenues and operations. If Oncor does not successfully respond to applicable legislative, regulatory, market or industry developments, Oncor could suffer a deterioration in its results of operations, financial condition, cash flows and/or prospects, which could materially adversely affect our results of operations, financial condition, cash flows and/or prospects.

---

## No Match in Current: 2023 Form 10-K | 52

*This section from the 2024 filing does not have a high-confidence textual match in 2025. It may have been removed, merged, or substantially reworded.*

Table of Contents Table of Contents The capital requirements for our LNG export projects can be significant, even if we ultimately decide not to make a positive final investment decision. In addition, our proposed facilities may not be completed in accordance with estimated timelines or budgets or at all as a result of the above or other factors, and delays, cost overruns or our inability to complete one or more of these projects could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects. Financing Arrangements We are and may continue to become involved in various financing arrangements with respect to our energy infrastructure projects, including guarantees, indemnities and loans. These arrangements could expose us to additional risks, including exposure to losses upon the occurrence of certain events related to the development, construction, operation or financing of the applicable projects, which could have a material adverse effect on our future results of operations, financial condition, cash flows and/or prospects.

---

## No Match in Current: 2023 Form 10-K | 55

*This section from the 2024 filing does not have a high-confidence textual match in 2025. It may have been removed, merged, or substantially reworded.*

Table of Contents Table of Contents Sempra Infrastructure's energy infrastructure assets may be considered by the Mexican government to be a public service or essential for the provision of a public service, in which case these assets and the related businesses could be subject to expropriation or nationalization, loss of concessions, renegotiation or annulment of existing contracts, and other similar risks. Any such occurrence could materially adversely affect our results of operations, financial condition, cash flows and/or prospects.

---

## Modified: Our debt service obligations expose us to risks and could require additional equity securities issuances by Sempra or sales of equity interests in subsidiaries or projects under development.

**Key changes:**

- Reworded sentence: "We have significant debt service obligations and an ongoing need for significant amounts of additional capital, which could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects by, among other things: ▪making it more difficult and costly to service, pay or refinance debts as they come due, particularly when interest rates increase or economic or industry conditions are otherwise unfavorable ▪limiting flexibility to pursue strategic opportunities or react to business developments or industry changes ▪causing lenders to require materially adverse terms for new debt, such as restrictions on uses of proceeds, limitations on incurring additional debt, paying dividends, repurchasing stock, or receiving distributions from subsidiaries or equity method investments and the creation of liens In January 2025, S&P revised Sempra's outlook to negative from stable and downgraded SoCalGas' issuer credit rating to A- from A."

**Prior (2024):**

We have significant debt service obligations, which could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects by, among other things: ▪making it more difficult and costly to service, pay or refinance debts as they come due, particularly when interest rates increase or economic or industry conditions are otherwise unfavorable ▪limiting flexibility to pursue strategic opportunities or react to business developments or industry changes ▪causing lenders to require materially adverse terms for new debt, such as restrictions on uses of proceeds, limitations on incurring additional debt, paying dividends, repurchasing stock, or receiving distributions from subsidiaries or equity method investments and the creation of liens Sempra's goal is to maintain or improve its credit ratings, but it may not be able to do so. To maintain these credit ratings, we may seek to reduce our outstanding indebtedness or our need for additional indebtedness by issuing equity securities or selling equity interests in our subsidiaries or development projects. We may not be able to complete any such equity sales on terms we consider acceptable or at all, and any new equity issued by Sempra may dilute the voting rights and economic interests of Sempra's existing equity holders. Any such outcome could have a material adverse effect on Sempra's results of operations, financial condition, cash flows and/or prospects.

**Current (2025):**

We have significant debt service obligations and an ongoing need for significant amounts of additional capital, which could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects by, among other things: ▪making it more difficult and costly to service, pay or refinance debts as they come due, particularly when interest rates increase or economic or industry conditions are otherwise unfavorable ▪limiting flexibility to pursue strategic opportunities or react to business developments or industry changes ▪causing lenders to require materially adverse terms for new debt, such as restrictions on uses of proceeds, limitations on incurring additional debt, paying dividends, repurchasing stock, or receiving distributions from subsidiaries or equity method investments and the creation of liens In January 2025, S&P revised Sempra's outlook to negative from stable and downgraded SoCalGas' issuer credit rating to A- from A. Sempra aims to maintain or improve its credit ratings, but we may not be able to do so. To maintain these credit ratings, we may seek to reduce our outstanding indebtedness or our need for additional indebtedness by reducing or postponing discretionary, non-safety related capital expenditures or investments in new businesses. Additionally, we may issue equity securities, including in our ATM program (such as our November 2024 forward sale agreement under the ATM program for the sale of 2,909,274 shares), or sell equity interests in our subsidiaries or development projects. We may not be able to complete any such equity sales on acceptable terms or at all, and any new equity issued by Sempra may dilute the voting rights and economic interests of Sempra's existing equity holders. Any such outcome could have a material adverse effect on Sempra's results of operations, financial condition, cash flows and/or prospects.

---

## Modified: We face risks related to severe weather, natural disasters, physical attacks and other similar events.

**Key changes:**

- Reworded sentence: "Our facilities and infrastructure may be damaged as a result of physical risks, such as extreme temperatures, storms, droughts and other severe weather; natural disasters, including wildfires (such as the LA Fires), land movement, earthquakes, and solar flares; climate-related conditions, including sea level rise and coastal erosion; accidents, including explosions and excavation damage to pipelines; or acts of terrorism, war, or criminality."
- Reworded sentence: "Such incidents could result in operational disruptions, electric or gas outages, property damage, personal injury or death and could cause secondary incidents that also may have these or other negative effects, such as fires; leaks or spills of gases, natural gas odorant or radioactive material; damage to natural resources; or other impacts to affected communities."
- Reworded sentence: "In some cases, we may be liable for damages even though we are not at fault, such as when the doctrine of inverse condemnation applies, which we discuss below under "Risks Related to Sempra California - Operational Risks." For our regulated utilities, these costs may not be recoverable in rates or recovery may be insufficient or delayed."

**Prior (2024):**

Our facilities and infrastructure may be damaged by severe weather, natural disasters, wildfires, accidents, explosions or acts of terrorism, war, or criminality. Because we are in the business of using, storing, transporting and disposing of highly flammable, explosive and radioactive materials and operating highly energized equipment, the risks such incidents pose to our facilities and infrastructure, as well as to the surrounding communities for which we could be liable, are substantially greater than the potential risks to a typical business. Such incidents could result in operational disruptions, power or gas outages, property damage, personal injury or death and could cause secondary incidents that also may have these or other negative effects, such as fires; leaks of natural gas, natural gas odorant, propane, ethane, other GHG emissions or radioactive material; spills or other damage to natural resources; or other nuisances to affected communities. Any of these occurrences could decrease revenues and earnings and/or increase costs, including maintenance costs or restoration expenses, amounts associated with claims against us, and regulatory fines, penalties and disallowances. In some cases, we may be liable for damages even though we are not at fault, such as when the doctrine of inverse condemnation applies, which we discuss below under "Risks Related to Sempra California - Operational Risks." For our regulated utilities, these costs may not be recoverable in rates. Insurance coverage for these costs may continue to increase or become prohibitively expensive, be disputed by insurers, or become unavailable for certain of these risks or at adequate levels, and any insurance proceeds may be insufficient to cover our losses or liabilities due to limitations, exclusions, high deductibles, failure to comply with procedural requirements or other factors. Such incidents that do not directly affect our facilities may impact our business partners, supply chains and transportation channels, which could negatively affect our ability to operate. Moreover, weather-related incidents have become more prevalent, unpredictable and severe as a result of climate change or other factors. As a result, these incidents could have a greater impact on our businesses than currently anticipated and, for our regulated utilities, rates may not be adequately or timely adjusted to reflect any such increased impact. Any such outcome could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects.

**Current (2025):**

Our facilities and infrastructure may be damaged as a result of physical risks, such as extreme temperatures, storms, droughts and other severe weather; natural disasters, including wildfires (such as the LA Fires), land movement, earthquakes, and solar flares; climate-related conditions, including sea level rise and coastal erosion; accidents, including explosions and excavation damage to pipelines; or acts of terrorism, war, or criminality. Because we are in the business of using, storing, transporting and disposing of highly flammable, explosive and radioactive materials and operating highly energized equipment, the risks such incidents pose to our facilities and infrastructure, as well as to the surrounding communities for which we could be liable, are substantially greater than the potential risks to a typical business. Such incidents could result in operational disruptions, electric or gas outages, property damage, personal injury or death and could cause secondary incidents that also may have these or other negative effects, such as fires; leaks or spills of gases, natural gas odorant or radioactive material; damage to natural resources; or other impacts to affected communities. Any of these occurrences could decrease revenues and earnings and/or increase costs, including maintenance costs or restoration expenses, amounts associated with claims against us, and regulatory fines, penalties and disallowances. In some cases, we may be liable for damages even though we are not at fault, such as when the doctrine of inverse condemnation applies, which we discuss below under "Risks Related to Sempra California - Operational Risks." For our regulated utilities, these costs may not be recoverable in rates or recovery may be insufficient or delayed. Insurance coverage for these costs may continue to increase or become prohibitively expensive, be disputed by insurers, or become unavailable for certain of these risks or at adequate levels or in certain geographic locations, and any insurance proceeds may be insufficient to cover our losses or liabilities due to limitations, exclusions, high deductibles, failure to comply with procedural requirements or other factors. We discuss the risks related to insurance for wildfire liabilities below under "Risks Related to Sempra California  -  Operational Risks." Such incidents that do not directly affect our facilities may impact our business partners, supply chains and transportation and communication channels, which could negatively affect our ability to operate. Moreover, weather-related incidents have become more prevalent, unpredictable and severe due to climate change or other factors. As a result, these incidents could have a greater impact on our businesses than currently anticipated and, for our regulated utilities, rates may not be adequately or timely adjusted to reflect any such increased impact. Any such outcome could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects.

---

## Modified: We face risks related to unsettled property rights and titles in Mexico.

**Key changes:**

- Reworded sentence: "We are engaged in disputes regarding our title to the property in Mexico where our ECA Regas Facility is situated and our ECA LNG projects are expected to be situated, which we discuss in Note 15 of the Notes to Consolidated Financial Statements."
- Added sentence: "Sempra Infrastructure's energy infrastructure assets may be considered by the Mexican government to be a public service or essential for the provision of a public service, in which case these assets and the related businesses could be subject to expropriation or nationalization, loss of concessions, renegotiation or annulment of existing contracts, and other similar risks."
- Added sentence: "Any such occurrence could materially adversely affect our results of operations, financial condition, cash flows and/or prospects."

**Prior (2024):**

We are engaged in disputes regarding our title to the property in Mexico where our ECA Regas Facility is situated and our ECA LNG projects are expected to be situated, which we discuss in Note 16 of the Notes to Consolidated Financial Statements. In addition, we may have or seek to obtain long-term leases or rights-of-way from governmental agencies or other third parties to operate our energy infrastructure on land we do not own. In addition to the risks associated with such property ownership and use that we describe above under "Risks Related to All Sempra Businesses - Operational Risks," disputes regarding ownership or rights to any of these properties could lead to difficulties finding or maintaining suitable partners, customers and project financing arrangements and could hinder or halt our ability to construct and, if completed, operate the affected facilities or proposed projects. Any of these outcomes could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects.

**Current (2025):**

We are engaged in disputes regarding our title to the property in Mexico where our ECA Regas Facility is situated and our ECA LNG projects are expected to be situated, which we discuss in Note 15 of the Notes to Consolidated Financial Statements. In addition, we have and may in the future seek to obtain long-term leases or rights-of-way from governmental agencies or other third parties to operate our energy infrastructure on land we do not own. In addition to the risks associated with such property ownership and use that we describe above under "Risks Related to All Sempra Businesses - Operational Risks," disputes regarding ownership or rights to any of these properties could lead to difficulties finding or maintaining suitable partners, customers and project financing arrangements and could hinder or halt our ability to construct and, if completed, operate the affected facilities or proposed projects. Any of these outcomes could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects. Sempra Infrastructure's energy infrastructure assets may be considered by the Mexican government to be a public service or essential for the provision of a public service, in which case these assets and the related businesses could be subject to expropriation or nationalization, loss of concessions, renegotiation or annulment of existing contracts, and other similar risks. Any such occurrence could materially adversely affect our results of operations, financial condition, cash flows and/or prospects.

---

## Modified: 2024 Form 10-K | 49

**Key changes:**

- Reworded sentence: "Table of Contents Table of Contents Future wildfires in SDG&E's or SoCalGas' service territories could compromise SDG&E's and SoCalGas' electric and natural gas infrastructure and result in further service disruptions."
- Reworded sentence: "PG&E is seeking reimbursement from the Wildfire Fund for losses associated with the Dixie Fire, which burned from July 2021 through October 2021."
- Reworded sentence: "In the past, the CPUC has denied recovery of incurred costs associated with wildfire claims despite the doctrine of inverse condemnation, which was historically based on the ability of a utility to pass such costs through to rate payers."
- Reworded sentence: "Cost Recovery Through Insurance or Rates As a result of California's doctrine of inverse condemnation, substantial losses recorded by insurance companies, and increased wildfire risk, obtaining insurance coverage for wildfires potentially associated with SDG&E's equipment (or, to a lesser extent, SoCalGas) has become increasingly difficult and costly."
- Added sentence: "Wildfire insurance may also become prohibitively expensive or unavailable for homeowners and businesses in SDG&E's service territory, potentially increasing SDG&E's financial exposure if a wildfire is found to be caused by SDG&E's equipment."

**Prior (2024):**

Table of Contents Table of Contents The Wildfire Legislation In July 2019, the Wildfire Legislation was signed into law, which we discuss in Note 1 of the Notes to Consolidated Financial Statements. The Wildfire Legislation's legal standard for the recovery of wildfire costs may not be implemented effectively or applied consistently, we may not be eligible for the Wildfire Legislation's cap on wildfire-related liability if SDG&E fails to maintain a valid annual safety certification from the OEIS or meet other requirements, and/or the Wildfire Fund could be exhausted due to claims against the fund by SDG&E or other participating IOUs as a result of fires in their respective service territories, any of which could have a material adverse effect on Sempra's and SDG&E's results of operations, financial condition, cash flows and/or prospects. PG&E has indicated it will seek reimbursement from the Wildfire Fund for losses associated with the Dixie fire, which burned from July 2021 through October 2021 and was reported to be the largest single wildfire (measured by acres burned) in California history. In addition, the Wildfire Legislation did not change the doctrine of inverse condemnation, which imposes strict liability (meaning that liability is imposed regardless of fault) on a utility whose equipment is determined to be a cause of a fire. In such an event, the utility would be responsible for the costs of damages, including business interruption losses, interest and attorneys' fees, even if the utility is not found negligent. In the past, the CPUC has denied recovery of costs incurred as a result of the doctrine of inverse condemnation. The doctrine of inverse condemnation also is not exclusive of other theories of liability, such as negligence, under which additional liabilities, such as fire suppression, clean-up and evacuation costs, medical expenses, and personal injury, punitive and other damages, could be imposed. We are unable to predict the impact of the Wildfire Legislation on SDG&E's ability to recover costs and expenses if SDG&E's equipment is determined to be a cause of a fire, and specifically in the context of the application of inverse condemnation. Cost Recovery Through Insurance or Rates As a result of California's doctrine of inverse condemnation, substantial losses recorded by insurance companies, and increased wildfire risk, obtaining insurance coverage for wildfires that could be caused by SDG&E (or, to a lesser extent, SoCalGas) has become increasingly difficult and costly. If these conditions continue or worsen, insurance for wildfire liabilities may become unavailable or may become prohibitively expensive and we may be denied recovery of insurance cost increases through the regulatory process. In addition, insurance for wildfire liabilities may not be sufficient to cover all losses we may incur, or it may not be available to meet the $1.0 billion of primary insurance required by the Wildfire Legislation. We are unable to predict whether we would be able to recover in rates or from the Wildfire Fund the amount of any uninsured losses. A loss that is not fully insured, is not sufficiently covered by the Wildfire Fund and/or cannot be recovered in customer rates could materially adversely affect Sempra's and one or both of SDG&E's and SoCalGas' results of operations, financial condition, cash flows and/or prospects. Wildfire Mitigation Efforts Although we expend significant resources on measures designed to mitigate wildfire risks, these measures may not be effective in preventing wildfires or reducing our wildfire-related losses and their costs may not be fully recoverable in rates. SDG&E is required by California law to submit wildfire mitigation plans for approval by the OEIS and could be subject to increased risks if these plans are not approved in a timely manner or the measures set forth in the plans are not implemented effectively, as well as fines or penalties for any failure to comply with the approved plans. One of our wildfire mitigation strategies is to de-energize certain circuits for safety when there is elevated weather-related wildfire ignition risk. These "public safety power shutoffs" have been subject to scrutiny by various stakeholders, including customers, regulators and lawmakers, which could increase the risk of liability for damages associated with these events. Such costs may not be recoverable in rates. Unrecoverable costs, adverse legislation or rulemaking, scrutiny by key stakeholders, ineffective wildfire mitigation measures or other negative effects associated with these efforts could materially adversely affect Sempra's and SDG&E's results of operations, financial condition, cash flows and/or prospects.

**Current (2025):**

Table of Contents Table of Contents Future wildfires in SDG&E's or SoCalGas' service territories could compromise SDG&E's and SoCalGas' electric and natural gas infrastructure and result in further service disruptions. Any such wildfires in SDG&E's and SoCalGas' territories (or outside of SDG&E's territory in the event the Wildfire Fund is materially diminished) could materially adversely affect SDG&E's, SoCalGas' and Sempra's results of operations, financial condition, cash flows and/or prospects, which we discuss further in this risk factor below and above under "Risks Related to All Sempra Businesses - Operational Risks." The Wildfire Legislation In July 2019, the Wildfire Legislation was signed into law, which we discuss in Note 1 of the Notes to Consolidated Financial Statements. The Wildfire Legislation's legal standard for the recovery of wildfire costs may not be implemented effectively or applied consistently, we may not be eligible for the Wildfire Legislation's cap on wildfire-related liability if SDG&E fails to maintain a valid annual safety certification from the OEIS or meet other requirements, and/or the Wildfire Fund could be exhausted due to claims against the fund by SDG&E or other participating IOUs as a result of fires in their respective service territories, any of which could have a material adverse effect on Sempra's and SDG&E's results of operations, financial condition, cash flows and/or prospects. PG&E is seeking reimbursement from the Wildfire Fund for losses associated with the Dixie Fire, which burned from July 2021 through October 2021. In addition, fires of the size and scope of the recent LA Fires, if found to have been caused by a participating IOU, could have a material adverse effect on the Wildfire Fund. In the case of the LA fires, the causes of these fires have not been determined and therefore these fires may not impact the Wildfire Fund. In addition, the Wildfire Legislation did not change the doctrine of inverse condemnation, which imposes strict liability (meaning that liability is imposed regardless of fault) on a utility whose equipment is determined to be a cause of a fire. In such an event, the utility would be responsible for the costs of damages, including business interruption losses, interest and attorneys' fees, even if the utility is not found negligent. In the past, the CPUC has denied recovery of incurred costs associated with wildfire claims despite the doctrine of inverse condemnation, which was historically based on the ability of a utility to pass such costs through to rate payers. The doctrine of inverse condemnation also is not exclusive of other theories of liability, such as negligence, under which additional liabilities, such as fire suppression, clean-up and evacuation costs, medical expenses, and personal injury, punitive and other damages, could be imposed. We are unable to predict the impact of the Wildfire Legislation on SDG&E's ability to recover costs and expenses if SDG&E's equipment is determined to be a cause of a fire, and specifically in the context of the application of inverse condemnation. Cost Recovery Through Insurance or Rates As a result of California's doctrine of inverse condemnation, substantial losses recorded by insurance companies, and increased wildfire risk, obtaining insurance coverage for wildfires potentially associated with SDG&E's equipment (or, to a lesser extent, SoCalGas) has become increasingly difficult and costly. If these conditions continue or worsen, including as a result of the LA Fires, insurance for wildfire liabilities may become unavailable or may become prohibitively expensive and we may be denied recovery of insurance cost increases through the regulatory process. In addition, insurance for wildfire liabilities may not be sufficient to cover all losses we may incur, or it may not be available to meet the $1.0 billion of primary insurance required by the Wildfire Legislation. Wildfire insurance may also become prohibitively expensive or unavailable for homeowners and businesses in SDG&E's service territory, potentially increasing SDG&E's financial exposure if a wildfire is found to be caused by SDG&E's equipment. We are unable to predict whether we would be able to recover in rates or from the Wildfire Fund the amount of any uninsured losses. A loss that is not fully insured, is not sufficiently covered by the Wildfire Fund and/or cannot be recovered in customer rates could materially adversely affect Sempra's and one or both of SDG&E's and SoCalGas' results of operations, financial condition, cash flows and/or prospects. Wildfire Mitigation Efforts Although we expend significant resources on measures designed to mitigate wildfire risks, these measures may not be effective in preventing wildfires or reducing our wildfire-related losses, and their costs may not be fully recoverable in rates. SDG&E is required by California law to submit wildfire mitigation plans for approval by the OEIS and could be subject to increased risks if these plans are not approved in a timely manner or SDG&E is determined to not have substantially complied with its approved plans, including the risk of fines or penalties for noncompliance. One of our wildfire mitigation strategies is to de-energize certain circuits for safety when there is elevated weather-related wildfire ignition risk. These "public safety power shutoffs" have been subject to scrutiny by various stakeholders, including customers, regulators and lawmakers, which could increase the risk of liability for damages associated with these events if SDG&E is found not to have acted within applicable guidelines and regulations. Such costs may not be recoverable in rates. Unrecoverable costs, adverse legislation or rulemaking, stakeholder scrutiny, ineffective wildfire mitigation measures or other negative effects associated with these efforts could materially adversely affect SDG&E's and Sempra's results of operations, financial condition, cash flows and/or prospects.

---

## Modified: SoCalGas has incurred and may continue to incur significant costs, expenses and other liabilities related to the Leak.

**Key changes:**

- Reworded sentence: "From October 23, 2015 through February 11, 2016, SoCalGas experienced the Leak, which we describe in Note 15 of the Notes to Consolidated Financial Statements."
- Reworded sentence: "As of February 19, 2025, there are approximately 520 plaintiffs who are either new plaintiffs that have filed new lawsuits related to the Leak or Non-Settling Individual Plaintiffs."
- Reworded sentence: "We discuss the risks associated with litigation above under "Risks Related to All Sempra Businesses - Legal and Regulatory Risks." SoCalGas' loss contingency accruals do not include any amounts in excess of what has been reasonably estimated to resolve these matters, nor any amounts that may be necessary to resolve threatened litigation, other potential litigation or other costs."

**Prior (2024):**

From October 23, 2015 through February 11, 2016, SoCalGas experienced the Leak, which we describe in Note 16 of the Notes to Consolidated Financial Statements. Litigation In September 2021, SoCalGas and Sempra entered into an agreement with counsel to resolve approximately 390 lawsuits including approximately 36,000 plaintiffs (the Individual Plaintiffs) then pending against SoCalGas and Sempra related to the Leak for a payment of up to $1.8 billion. Over 99% of the Individual Plaintiffs participated and submitted valid releases, and SoCalGas paid $1.79 billion in 2022 under the agreement. The Individual Plaintiffs who did not participate in the settlement (the Non-Settling Individual Plaintiffs) are able to continue to pursue their claims. As of February 20, 2024, there are approximately 100 Non-Settling Individual Plaintiffs remaining. In addition, as of February 20, 2024, new lawsuits related to the Leak on behalf of approximately 413 new plaintiffs have been filed against SoCalGas and Sempra since the September 2021 settlement. This litigation seeks compensatory and punitive damages, property damage and diminution in property value, injunctive relief and civil penalties. Additional litigation may be filed against us related to the Leak or our responses to it. The costs of defending against, settling or otherwise resolving the pending lawsuits or any new litigation could materially adversely affect SoCalGas' and Sempra's results of operations, financial condition, cash flows and/or prospects. We discuss the risks associated with litigation above under "Risks Related to All Sempra Businesses - Legal and Regulatory Risks" and in this risk factor below under "Accounting and Other Impacts."

**Current (2025):**

From October 23, 2015 through February 11, 2016, SoCalGas experienced the Leak, which we describe in Note 15 of the Notes to Consolidated Financial Statements. In September 2021, SoCalGas and Sempra entered into an agreement with counsel to resolve approximately 390 lawsuits including approximately 36,000 plaintiffs (the Individual Plaintiffs) then pending against SoCalGas and Sempra related to the Leak for a payment of up to $1.8 billion. Over 99% of the Individual Plaintiffs participated and submitted valid releases, and SoCalGas paid $1.79 billion in 2022 under the agreement. The Individual Plaintiffs who did not participate in the settlement (the Non-Settling Individual Plaintiffs) are able to continue to pursue their claims. As of February 19, 2025, there are approximately 520 plaintiffs who are either new plaintiffs that have filed new lawsuits related to the Leak or Non-Settling Individual Plaintiffs. This litigation seeks compensatory and punitive damages, property damage and diminution in property value, injunctive relief and civil penalties. Additional litigation may be filed against us related to the Leak or our responses to it. The costs of defending against, settling or otherwise resolving the pending lawsuits or any new litigation could materially adversely affect SoCalGas' and Sempra's results of operations, financial condition, cash flows and/or prospects. We discuss the risks associated with litigation above under "Risks Related to All Sempra Businesses - Legal and Regulatory Risks." SoCalGas' loss contingency accruals do not include any amounts in excess of what has been reasonably estimated to resolve these matters, nor any amounts that may be necessary to resolve threatened litigation, other potential litigation or other costs. We are not able to reasonably estimate the possible loss or a range of possible losses in excess of the amounts accrued, which could be significant and could have a material adverse effect on SoCalGas' and Sempra's results of operations, financial condition, cash flows and/or prospects.

---

## Modified: The economic interest, voting rights and market value of our outstanding common and preferred stock may be adversely affected by any additional equity securities we may issue.

**Key changes:**

- Reworded sentence: "At February 19, 2025, we had 651,457,249 shares of our common stock and 900,000 shares of our non-convertible series C preferred stock outstanding."

**Prior (2024):**

At February 20, 2024, we had 632,149,916 shares of our common stock and 900,000 shares of our non-convertible series C preferred stock outstanding. Our businesses have substantial capital needs, and we may seek to raise capital by issuing additional

**Current (2025):**

At February 19, 2025, we had 651,457,249 shares of our common stock and 900,000 shares of our non-convertible series C preferred stock outstanding. Our businesses have substantial capital needs, and we may seek to raise capital by issuing additional equity, including in our ATM program, or convertible debt securities in potentially significant amounts depending in part on the prevailing market price of our common stock, which at times experiences substantial volatility. Any future issuance of equity or convertible debt securities may materially dilute the voting rights and economic interests of holders of our outstanding common and preferred stock and materially adversely affect the trading price of our common and preferred stock.

---

## Modified: Project development activities may not be successful, projects under construction may not be completed on schedule or within budget, and completed projects may not operate at expected levels or generate expected earnings or cash flows.

**Key changes:**

- Reworded sentence: "Success in developing each project depends on, among other things: ▪our financial condition and cash flows and other factors that impact our ability to invest sufficient funds in the project, including for preliminary activities conducted before we determine whether the project is feasible or economically attractive ▪project assessment and design and our ability to foresee and incorporate new and developing trends and technologies in the energy industry, such as projects and design solutions to help enable our and our customers' climate goals ▪our ability to reach a final investment decision or meet other milestones, which may be influenced by external factors outside our control, including the global economy and energy and financial markets, actions by regulators, achieving necessary internal and external approvals, and many of the other factors described in this risk factor ▪negotiation of satisfactory EPC agreements and renegotiation in the event of delays in final investment decisions or failures to meet other specified deadlines ▪identification of suitable partners, customers, contractors, suppliers and other necessary counterparties ▪progressing relationships from MOUs, HOAs or similar arrangements, which are non-binding, to execution of binding, definitive agreements and participation in the project ▪negotiation and maintenance of satisfactory equity, purchase, sale, supply, transportation and other appropriate commercial agreements, and satisfaction of any conditions to effectiveness of such agreements, including reaching a positive final investment decision within agreed timelines ▪timely receipt and maintenance of required governmental permits, licenses and other authorizations under terms we find reasonable ▪our project partners', contractors', equipment providers' and other vendors' and counterparties' willingness and financial or other ability to make their required investments or fulfill their contractual commitments on a timely basis ▪timely, satisfactory and on-budget completion of construction, which could be negatively affected by engineering problems, work stoppages, unavailability or increased costs of materials, equipment, labor and commodities due to inflation or supply chain or other issues, and a variety of other factors, many of which we discuss above under "Risks Related to All Sempra Businesses - Operational Risks" and elsewhere in this risk factor ▪implementation of new or changes to existing laws or regulations that impact our infrastructure or the energy sector generally ▪obtaining satisfactory financing for the project, particularly when inflation and interest rates are volatile ▪the absence of hidden defects on or inherited environmental liabilities for the site of the project ▪timely and cost-effective resolution of any litigation or unsettled property rights affecting the project ▪geopolitical events and other uncertainties"

**Prior (2024):**

Energy Infrastructure Projects We are involved in a number of energy infrastructure projects in various stages of development and construction, which subject us to numerous risks. Success in developing each project depends on, among other things: ▪our financial condition and cash flows and other factors that impact our ability to invest sufficient funds in the project, including for preliminary activities conducted before we determine whether the project is feasible or economically attractive ▪project assessment and design and our ability to foresee and incorporate new and developing trends and technologies in the energy industry, such as our pursuit of projects and design solutions to help enable our and our customers' climate goals ▪our ability to reach a final investment decision or meet other milestones, which may be influenced by external factors outside our control, including the global economy and energy and financial markets, actions by regulators, achieving necessary internal and external approvals, and many of the other factors described in this risk factor ▪negotiation of satisfactory EPC agreements and renegotiation in the event of delays in final investment decisions or failures to meet other specified deadlines ▪identification of suitable partners, customers, suppliers and other necessary counterparties ▪progressing relationships from MOUs, HOAs or similar arrangements, which are non-binding, to execution of binding, definitive agreements and participation in the project ▪negotiation and maintenance of satisfactory equity, purchase, sale, supply, transportation and other appropriate commercial agreements, and satisfaction of any conditions to effectiveness of such agreements, including reaching a positive final investment decision within agreed timelines ▪timely receipt and maintenance of required governmental permits, licenses and other authorizations under terms we find reasonable ▪our project partners', contractors', equipment providers' and other vendors' and counterparties' willingness and financial or other ability to make their required investments or fulfill their contractual commitments on a timely basis ▪timely, satisfactory and on-budget completion of construction, which could be negatively affected by engineering problems, work stoppages, unavailability or increased costs of materials, equipment, labor and commodities due to inflation or supply chain or other issues, and a variety of other factors, many of which we discuss above under "Risks Related to All Sempra Businesses - Operational Risks" and elsewhere in this risk factor ▪implementation of new or changes to existing laws or regulations that impact our infrastructure or the energy sector generally ▪obtaining satisfactory financing for the project, particularly when inflation and interest rates are rising ▪the absence of hidden defects on or inherited environmental liabilities for the site of the project ▪fast and cost-effective resolution of any litigation or unsettled property rights affecting the project ▪geopolitical events and other uncertainties Any failures with respect to the above factors or other factors material to any particular project could involve additional costs, otherwise negatively affect our ability to successfully complete the project and force us to impair or write off amounts we have invested in the project. If we are unable to complete a development project, if we experience delays, or if construction, financing or other project costs exceed our estimated budgets and we are required to make additional capital contributions, we may not receive an adequate or any return on our investment and other resources expended on the project and our results of operations, financial condition, cash flows and/or prospects could be materially adversely affected. The operation of existing facilities and any future projects we complete involves many risks, including the potential for unforeseen design flaws, engineering challenges, or the breakdown for other reasons of facilities, equipment or processes; labor disputes; fuel interruption; environmental contamination; increasing regulatory requirements, including from regulations aiming to reduce GHG emissions; and the other operational risks that we discuss above under "Risks Related to All Sempra Businesses - Operational Risks." Any of these events could lead to our facilities being idle for an extended period of time or operating below expected levels, which may result in lost revenues or increased expenses, including higher maintenance costs and penalties. Any such occurrence could materially adversely affect our results of operations, financial condition, cash flows and/or prospects.

**Current (2025):**

Energy Infrastructure Projects We are involved in a number of energy infrastructure projects in various stages of development and construction, which subject us to numerous risks. Success in developing each project depends on, among other things: ▪our financial condition and cash flows and other factors that impact our ability to invest sufficient funds in the project, including for preliminary activities conducted before we determine whether the project is feasible or economically attractive ▪project assessment and design and our ability to foresee and incorporate new and developing trends and technologies in the energy industry, such as projects and design solutions to help enable our and our customers' climate goals ▪our ability to reach a final investment decision or meet other milestones, which may be influenced by external factors outside our control, including the global economy and energy and financial markets, actions by regulators, achieving necessary internal and external approvals, and many of the other factors described in this risk factor ▪negotiation of satisfactory EPC agreements and renegotiation in the event of delays in final investment decisions or failures to meet other specified deadlines ▪identification of suitable partners, customers, contractors, suppliers and other necessary counterparties ▪progressing relationships from MOUs, HOAs or similar arrangements, which are non-binding, to execution of binding, definitive agreements and participation in the project ▪negotiation and maintenance of satisfactory equity, purchase, sale, supply, transportation and other appropriate commercial agreements, and satisfaction of any conditions to effectiveness of such agreements, including reaching a positive final investment decision within agreed timelines ▪timely receipt and maintenance of required governmental permits, licenses and other authorizations under terms we find reasonable ▪our project partners', contractors', equipment providers' and other vendors' and counterparties' willingness and financial or other ability to make their required investments or fulfill their contractual commitments on a timely basis ▪timely, satisfactory and on-budget completion of construction, which could be negatively affected by engineering problems, work stoppages, unavailability or increased costs of materials, equipment, labor and commodities due to inflation or supply chain or other issues, and a variety of other factors, many of which we discuss above under "Risks Related to All Sempra Businesses - Operational Risks" and elsewhere in this risk factor ▪implementation of new or changes to existing laws or regulations that impact our infrastructure or the energy sector generally ▪obtaining satisfactory financing for the project, particularly when inflation and interest rates are volatile ▪the absence of hidden defects on or inherited environmental liabilities for the site of the project ▪timely and cost-effective resolution of any litigation or unsettled property rights affecting the project ▪geopolitical events and other uncertainties

---

## Modified: Wildfires in California pose risks to Sempra, SDG&E and SoCalGas.

**Key changes:**

- Reworded sentence: "More and Increasingly Severe Wildfires In recent years, California has experienced some of the largest wildfires (measured by acres burned and/or structures destroyed) in its history."
- Reworded sentence: "Certain of California's local land use policies and forestry management practices have allowed for the construction and development of residential and commercial projects in high-risk fire areas, which could lead to increased third-party claims and greater losses related to fires for which SDG&E or SoCalGas may be liable."

**Prior (2024):**

More and Increasingly Severe Wildfires In recent years, California has experienced some of the largest wildfires (measured by acres burned) in its history. Frequent and severe drought conditions, inconsistent and extreme swings in precipitation, changes in vegetation, unseasonably warm temperatures, low humidity, strong winds and other factors have increased the duration of the wildfire season and the intensity, prevalence and difficulty of prevention and containment of wildfires in California, including in SDG&E's and SoCalGas' service territories. Changing weather patterns, including as a result of climate change, could exacerbate these conditions. These wildfires could jeopardize SDG&E's and SoCalGas' electric and natural gas infrastructure and third-party property and result in temporary power shortages in SDG&E's and SoCalGas' service territories. Certain of California's local land use policies and forestry management practices have been relaxed to allow for the construction and development of residential and commercial projects in high-risk fire areas, which could lead to increased third-party claims and greater losses related to fires for which SDG&E or SoCalGas may be liable. Any such wildfires in SDG&E's and SoCalGas' territories (or outside of these territories in the event the Wildfire Fund is materially diminished) could materially adversely affect SDG&E's, SoCalGas' and Sempra's results of operations, financial condition, cash flows and/or prospects, which we discuss further in this risk factor below and above under "Risks Related to All Sempra Businesses - Operational Risks."

**Current (2025):**

More and Increasingly Severe Wildfires In recent years, California has experienced some of the largest wildfires (measured by acres burned and/or structures destroyed) in its history. Frequent and severe drought conditions, inconsistent and extreme swings in precipitation, changes in vegetation, unseasonably warm temperatures, low humidity, strong winds and other factors have increased the duration of the wildfire season and the intensity, prevalence and difficulty of prevention and containment of wildfires in California, including in SDG&E's and SoCalGas' service territories. Changing weather patterns, including as a result of climate change, could exacerbate these conditions. Certain of California's local land use policies and forestry management practices have allowed for the construction and development of residential and commercial projects in high-risk fire areas, which could lead to increased third-party claims and greater losses related to fires for which SDG&E or SoCalGas may be liable. The LA Fires damaged some of SoCalGas' natural gas infrastructure and significant third-party property and resulted in service disruptions in some of its service territory.

---

## Modified: Our international businesses and operations expose us to increased legal, regulatory, tax, economic, geopolitical, credit and management oversight risks and challenges.

**Key changes:**

- Reworded sentence: "Conducting these activities in foreign jurisdictions subjects us to complex management, security, political, legal, economic and financial risks that vary by country, many of which may differ from and potentially be greater than those associated with our wholly domestic businesses, and the occurrence of any of these"

**Prior (2024):**

We own or have interests in a variety of energy infrastructure assets in Mexico, and we do business with companies based in foreign markets, including particularly our LNG export operations. Conducting these activities in foreign jurisdictions subjects us to complex management, security, political, legal, economic and financial risks that vary by country, many of which may differ from and potentially be greater than those associated with our wholly domestic businesses, and the occurrence of any of these risks could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects. These risks include the following and the other risks discussed in this risk factor below: ▪compliance with tax, trade, environmental and other foreign laws and regulations, including legal limitations on ownership in some foreign countries and inadequate or inconsistent enforcement of regulations ▪actions by local regulatory bodies, including setting rates and tariffs that may be earned by or charged to our businesses

**Current (2025):**

We own or have interests in a variety of energy infrastructure assets in Mexico, and we do business with companies based in foreign markets, including particularly our LNG export operations. Conducting these activities in foreign jurisdictions subjects us to complex management, security, political, legal, economic and financial risks that vary by country, many of which may differ from and potentially be greater than those associated with our wholly domestic businesses, and the occurrence of any of these

---

## Modified: Our investments in businesses we do not control expose us to risks.

**Key changes:**

- Reworded sentence: "For businesses we do not control, we are subject to the decisions of others, which may be adverse to our interests."
- Reworded sentence: "We discuss these investments in Note 5 of the Notes to Consolidated Financial Statements."

**Prior (2024):**

We have investments in businesses we do not control or manage or in which we share control. In some cases, we engage in arrangements with or for these businesses that could expose us to risks in addition to our investment, including guarantees, indemnities and loans. For businesses we do not control, we are subject to the decisions of others, which may be adverse to our interest. When we share control of a business with other owners, any disagreements among the owners about strategy, financial, operational, transactional or other important matters could hinder the business from moving forward with key initiatives or taking other actions and could negatively affect the relationships among the owners and the efficient functioning of the business. In addition, irrespective of whether we control these businesses, we could be responsible for liabilities or losses related to these businesses or elect to make capital contributions to these businesses. Any such circumstance could materially adversely affect our results of operations, financial condition, cash flows and/or prospects. We discuss these investments in Note 6 of the Notes to Consolidated Financial Statements.

**Current (2025):**

We have investments in businesses we do not control or manage or in which we share control. In some cases, we engage in arrangements with or for these businesses that could expose us to risks in addition to our investment, including guarantees, indemnities and loans. For businesses we do not control, we are subject to the decisions of others, which may be adverse to our interests. When we share control of a business with other owners, any disagreements among the owners about strategy, financial, operational, transactional or other important matters could hinder the business from moving forward with key initiatives or taking other actions and could negatively affect the relationships among the owners and the efficient functioning of the business. In addition, irrespective of whether we control these businesses, we could be responsible for liabilities or losses related to these businesses or elect to make capital contributions to these businesses. Any such circumstance could materially adversely affect our results of operations, financial condition, cash flows and/or prospects. We discuss these investments in Note 5 of the Notes to Consolidated Financial Statements.

---

## Modified: We face risks related to failures and delays in obtaining and maintaining permits, licenses, franchises and other approvals required by our businesses.

**Key changes:**

- Reworded sentence: "The industries in which we operate are subject to extensive regulation, and our businesses require numerous permits, licenses, rights-of-way, franchises, certificates and other approvals from federal, state, local and foreign governmental agencies."
- Reworded sentence: "From time to time, we invest funds in projects prior to receiving all regulatory approvals."

**Prior (2024):**

The industries in which we operate are subject to numerous governmental regulations, and our business requires numerous permits, licenses, rights-of-way, franchises, certificates and other approvals from federal, state, local and foreign governmental agencies. For example, SoCalGas' franchise agreement with Los Angeles County initially expired in June 2023 and the subsequent extension expired in December 2023. SoCalGas is operating and expects to continue to operate under the terms and provisions of the expired franchise until a new agreement is reached. Additionally, the City of San Diego is studying the feasibility of municipalization as a potential alternative to SDG&E's existing electric franchise agreement, and various aspects of the natural gas and electric franchise agreements granted by the City of San Diego to SDG&E have also been challenged in two lawsuits that we discuss in Note 16 of the Notes to the Consolidated Financial Statements. These approvals may not be granted in a timely manner or at all or may be modified, rescinded or fail to be extended for a variety of reasons, including due to legal or regulatory changes. Obtaining or maintaining these approvals could result in higher costs or the imposition of conditions or restrictions on our operations. Further, noncompliance by us or certain of our customers with the terms of these approvals could result in their modification, suspension or rescission and subject us to lost revenue, fines and penalties. If any of these approvals are suspended, rescinded or otherwise terminated or modified in a manner that makes our continued operation of the applicable business prohibitively expensive or otherwise impracticable, we may be required to adjust or temporarily or permanently cease certain of our operations, sell the associated assets or remove them from service and/or construct new assets intended to bypass the impacted area, in which case we may lose some of our rate base or revenue-generating assets, our development projects may be negatively affected and we may incur impairment charges or other costs that may not be recoverable. The occurrence of any of these events could materially adversely affect our results of operations, financial condition, cash flows and/or prospects. From time to time, we invest funds in capital projects prior to receiving all regulatory approvals. If there is a delay in obtaining these approvals; if any approval is conditioned on changes or other requirements that increase costs or impose restrictions on our existing or planned operations; if we fail to obtain or maintain these approvals or comply with them or other applicable laws or regulations; if we are involved in litigation that adversely impacts any approval or rights to the applicable property or assets; or if management decides not to proceed with a project, we may be unable to recover any or all amounts invested in that project. Any such occurrence could materially increase our costs, result in material impairments, and otherwise materially adversely affect our results of operations, financial condition, cash flows and/or prospects.

**Current (2025):**

The industries in which we operate are subject to extensive regulation, and our businesses require numerous permits, licenses, rights-of-way, franchises, certificates and other approvals from federal, state, local and foreign governmental agencies. These approvals may not be granted in a timely manner (including due to potential staffing issues at U.S. regulatory agencies) or at all or may be modified, rescinded or fail to be extended for a variety of reasons, including due to legal or regulatory changes or political considerations. The City of San Diego is studying the feasibility of municipalization as a potential alternative to SDG&E's existing electric franchise agreement, and various aspects of SDG&E's natural gas and electric franchise agreements have also been challenged in two lawsuits that we discuss in Note 15 of the Notes to the Consolidated Financial Statements. At Sempra Infrastructure, amendments to Mexico's Constitution and to Mexico's Electricity Industry Law have the potential to increase government control and participation in the energy sector and may require the CRE to revoke Sempra Infrastructure's self-supply permits deemed improperly obtained under a legal standard that is ambiguous and not well defined under the law. Obtaining or maintaining required approvals could result in higher costs or the imposition of conditions or restrictions on our operations. Further, noncompliance by us or certain of our customers with the terms of these approvals could result in their modification, suspension or rescission and subject us to lost revenue, fines and penalties. If any of these approvals are suspended, rescinded or otherwise terminated or modified in a manner that makes our continued operation of the applicable business prohibitively expensive or otherwise impracticable, we may be required to adjust or temporarily or permanently cease certain of our operations, sell the associated assets or remove them from service and/or construct new assets intended to bypass the impacted area, in which case we may lose some of our rate base or revenue-generating assets, our development projects may be negatively affected and we may incur impairment charges or other costs that may not be recoverable. The occurrence of any of these events could materially adversely affect our results of operations, financial condition, cash flows and/or prospects. From time to time, we invest funds in projects prior to receiving all regulatory approvals. We may be unable to recover any or all amounts invested in such projects if: ▪there is a delay in obtaining these approvals ▪any approval is conditioned on changes or other requirements that increase costs or impose restrictions on our existing or planned operations ▪we fail to obtain or maintain these approvals or comply with them or other applicable laws or regulations ▪we are involved in litigation that adversely impacts any approval or rights to the applicable property or assets ▪management decides not to proceed with a project Our inability to recover funds invested in these projects could materially increase our costs, result in material impairments, and otherwise materially adversely affect our results of operations, financial condition, cash flows and/or prospects.

---

## Modified: We may be negatively impacted by the outcome of litigation or other proceedings in which we are involved.

**Key changes:**

- Reworded sentence: "Our businesses are involved in a number of lawsuits, appeals, binding arbitrations, regulatory investigations and other proceedings."

**Prior (2024):**

Our businesses are involved in a number of lawsuits, binding arbitrations, regulatory investigations and other proceedings. We discuss material pending proceedings in Note 16 of the Notes to Consolidated Financial Statements. We have spent, and continue to spend, substantial money, time and employee and management focus on these lawsuits and other proceedings. The uncertainties inherent in lawsuits and other proceedings make it difficult to estimate with any degree of certainty the timing, costs and ranges of costs or outcome of these matters. In addition, juries have demonstrated a willingness to grant large awards, including punitive damages, in response to personal injury, product liability, property damage and other claims. Accordingly, actual costs incurred have and may continue to differ materially from insured or reserved amounts and may not be recoverable, in whole or in part, from insurance or in customer rates. Any of the foregoing could cause reputational damage and otherwise materially adversely affect our results of operations, financial condition, cash flows and/or prospects.

**Current (2025):**

Our businesses are involved in a number of lawsuits, appeals, binding arbitrations, regulatory investigations and other proceedings. We discuss material pending proceedings in Note 15 of the Notes to Consolidated Financial Statements. Our businesses also may become involved in new proceedings that we do not consider material, such as the approximately 28,000 proofs of claim that have been filed on behalf of persons who assert the right to file lawsuits in the future based on alleged exposure to asbestos in power plants designed and/or built by certain predecessor entities we acquired in connection with our acquisition of our majority interest in Oncor. We have spent, and continue to spend, substantial money, time and employee and management focus on lawsuits and other proceedings. The uncertainties inherent in lawsuits and other proceedings make it difficult to estimate with any degree of certainty the timing, costs and ranges of costs or outcome of these matters, and changes or disruptions to the judicial system, such as the nationwide strike by the Mexican judiciary in 2024 in response to recent Mexican Constitutional reforms that require all judges to be elected rather than appointed, could result in delays, increased costs, or unfavorable outcomes. In addition, juries have demonstrated a willingness to grant large awards, including punitive damages, in response to personal injury, product liability, property damage, nuisance, and other claims. Accordingly, actual costs incurred have and may continue to differ materially from insured or reserved amounts and may not be recoverable, in whole or in part, from insurance or in customer rates. Any of the foregoing could cause reputational damage and otherwise materially adversely affect our results of operations, financial condition, cash flows and/or prospects.

---

## Modified: Sempra could incur substantial tax liabilities if EFH's 2016 spin-off of Vistra is deemed to be taxable.

**Key changes:**

- Reworded sentence: "As part of its bankruptcy proceedings, in 2016, EFH distributed all the outstanding shares of common stock of its subsidiary Vistra Corp."
- Reworded sentence: "In connection with the merger of EFH with a subsidiary of Sempra (the Merger), EFH received a supplemental private letter ruling from the IRS and Sempra and EFH received tax opinions from their respective counsels that generally provide that the"

**Prior (2024):**

As part of its ongoing bankruptcy proceedings, in 2016, EFH distributed all the outstanding shares of common stock of its subsidiary Vistra Energy Corp. (formerly TCEH Corp. and referred to herein as Vistra) to certain creditors of TCEH LLC (the spin-off), and Vistra became an independent, publicly traded company. Vistra's spin-off from EFH was intended to qualify for partially tax-free treatment to EFH and its shareholders under Sections 368(a)(1)(G), 355 and 356 of the U.S. Internal Revenue Code of 1986 (as amended) (collectively referred to as the Intended Tax Treatment). In connection with and as a condition to the spin-off, EFH received a private letter ruling from the IRS regarding certain issues relating to the Intended Tax Treatment, as well as tax opinions from counsel to EFH and Vistra regarding certain aspects of the spin-off not covered by the private letter ruling. In connection with the signing and closing of the merger of EFH with an indirect subsidiary of Sempra (the Merger), EFH sought and received a supplemental private letter ruling from the IRS and Sempra and EFH received tax opinions from their respective counsels that generally provide that the Merger will not affect the conclusions reached in, respectively, the IRS private letter ruling and tax opinions issued with respect to the spin-off described above. Similar to the IRS private letter ruling and opinions issued with respect to the spin-off, the supplemental private letter ruling is generally binding on the IRS and any opinions issued with respect to the Merger are based on factual representations and assumptions, as well as certain undertakings, made by Sempra and EFH. If such representations and assumptions are untrue or incomplete, any such undertakings are not complied with, or the facts upon which the IRS supplemental private letter ruling or tax opinions (which will not impact the IRS position on the transactions) are based are different from the actual facts relating to the Merger, the tax opinions and/or supplemental private letter ruling may not be valid and could be challenged by the IRS. Even though Sempra Texas Holdings Corp. would have administrative appeal rights if the IRS were to invalidate its private letter ruling and/or supplemental private letter ruling, including the right to challenge any adverse IRS position in court, any such appeal would be subject to uncertainties and could fail. If it is ultimately determined that the Merger caused the spin-off not to qualify for the Intended Tax Treatment, Sempra, through its ownership of Sempra Texas Holdings Corp., could incur substantial tax liabilities, which would materially reduce the value associated with our indirect investment in Oncor and could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects.

**Current (2025):**

As part of its bankruptcy proceedings, in 2016, EFH distributed all the outstanding shares of common stock of its subsidiary Vistra Corp. (formerly Vistra Energy Corp. and referred to herein as Vistra) to certain creditors of TCEH LLC (the spin-off), and Vistra became an independent, publicly traded company. Vistra's spin-off from EFH was intended to qualify for partially tax-free treatment to EFH and its shareholders under Sections 368(a)(1)(G), 355 and 356 of the U.S. Internal Revenue Code of 1986 (as amended) (collectively referred to as the Intended Tax Treatment). In connection with and as a condition to the spin-off, EFH received a private letter ruling from the IRS regarding certain issues relating to the Intended Tax Treatment, as well as tax opinions from counsel to EFH and Vistra regarding certain aspects of the spin-off not covered by the private letter ruling. In connection with the merger of EFH with a subsidiary of Sempra (the Merger), EFH received a supplemental private letter ruling from the IRS and Sempra and EFH received tax opinions from their respective counsels that generally provide that the

---

## Modified: The operation of our facilities depends on good labor relations with our employees and our ability to attract and retain qualified personnel.

**Key changes:**

- Added sentence: "Our businesses depend on recruiting, developing and retaining qualified personnel."
- Reworded sentence: "At December 31, 2024, employees covered under collective bargaining agreements were 38%, 30% and 55%, respectively, of Sempra's, SDG&E's and SoCalGas' workforce, of which the collective bargaining agreements covering 29%, 0% and 55% of employees, respectively, expire within one year (and in the case of SoCalGas, the collective bargaining agreement expired in February 2025)."
- Reworded sentence: "For SoCalGas, negotiations for a new collective bargaining agreement are presently ongoing."

**Prior (2024):**

Several of our businesses have in place collective bargaining agreements with different labor unions, which are generally negotiated on a company-by-company basis. SoCalGas has a collective bargaining agreement that expires on September 30, 2024. Any prolonged negotiation or failure to reach an agreement on these labor contracts as they are up for renewal could result in work stoppages or other labor disruptions. Additionally, we have been faced with a shortage of experienced and qualified personnel in certain specialty operational positions and could experience labor disruptions from personnel in those positions. Any such labor disruption or negotiated wage or benefit increases, whether due to union activities, employee turnover, labor shortages or otherwise, could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects.

**Current (2025):**

Our businesses depend on recruiting, developing and retaining qualified personnel. Several of our businesses have in place collective bargaining agreements with different labor unions, which are generally negotiated on a company-by-company basis. At December 31, 2024, employees covered under collective bargaining agreements were 38%, 30% and 55%, respectively, of Sempra's, SDG&E's and SoCalGas' workforce, of which the collective bargaining agreements covering 29%, 0% and 55% of employees, respectively, expire within one year (and in the case of SoCalGas, the collective bargaining agreement expired in February 2025). Any prolonged negotiation or failure to reach an agreement on these labor contracts as they are up for renewal could result in work stoppages or other labor disruptions. For SoCalGas, negotiations for a new collective bargaining agreement are presently ongoing. Until a new collective bargaining agreement is ratified by employees, there could be labor disruptions. Additionally, we have faced a shortage of experienced and qualified personnel in certain specialty operational positions and could experience disruptions from recruiting or retention challenges for personnel in those positions. Any labor disruption, negotiated wage or benefit increases or other challenges, whether due to union activities, employee turnover, labor shortages or otherwise, could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects.

---

## Modified: We face evolving cybersecurity and technology resiliency risks associated with the energy grid, pipelines, storage and other infrastructure as well as the collection of personal, sensitive and confidential information.

**Key changes:**

- Reworded sentence: "Our significant use of and reliance on complex technologies and information systems in our operations, including our increasing deployment of new technologies, such as advanced forms of automation and artificial intelligence, and virtualization of many business activities, and our collection and retention of personal, sensitive and confidential information, represent large-scale opportunities for attacks on, vulnerabilities in or other failures of our information systems, information and energy grid and infrastructure."
- Reworded sentence: "Although we make significant investments in risk management, technology resiliency and information security measures for the protection of our systems and data, these measures could be insufficient or otherwise fail, particularly against attacks involving sophisticated adversaries, including nation-state actors, or outages involving key technology vendors."
- Reworded sentence: "Any actual or perceived noncompliance with applicable data privacy and security laws or any incidents impacting our or our vendors' information systems; the integrity of the energy grid, our pipelines or our distribution, storage and other infrastructure; or our personal, sensitive and confidential information could result in disruptions to our business operations, regulatory compliance failures, inability to produce accurate and timely financial statements, energy delivery failures, financial and reputational loss, litigation, violations of applicable laws and fines or penalties, any of which could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects."

**Prior (2024):**

Our use of complex technologies and systems in our operations, including our increasing deployment of new technologies and virtualization of many business activities, and our collection and retention of personal, sensitive and confidential information, represent large-scale opportunities for attacks on or other failures to protect our information systems, information and energy grid and natural gas infrastructure. We are also vulnerable in the event of attacks on or failures to protect third-party vendors' technologies and systems, depending on the level of access these vendors have to our information and systems. In particular, ransomware and other forms of cyber-attacks targeting utility systems and other energy infrastructure are continuously increasing in sophistication, magnitude and frequency, may not be recognized until launched against a target and may further escalate during periods of heightened geopolitical tensions. Accordingly, we may be unable to anticipate these techniques or to implement adequate security barriers or other preventative measures, making it impossible for us to entirely eliminate this risk. Additionally, SDG&E and SoCalGas are increasingly required to disclose large amounts of data (including customer personal information and energy use data) to support state initiatives related to grid modernization, customer choice, energy efficiency, demand response and conservation, increasing the risks of inadvertent disclosure or unauthorized access of sensitive information. Moreover, all our businesses operating in California (and in other states and countries that have similar laws) are subject to enhanced state privacy laws, which require companies that collect information about California residents to, among other things, disclose their data collection, use and sharing practices; allow consumers to opt out of certain data sharing with third parties; and assume liability for unauthorized disclosure of certain highly sensitive personal information. Although we make significant investments in risk management and information security measures for the protection of our systems and data, these measures could be insufficient or otherwise fail. The costs and operational consequences of implementing, maintaining and enhancing these measures are significant and expected to increase to address the growing intensity and complexity of cyber risks. We often rely on third-party vendors to deploy new technologies and maintain and update our systems, and these third parties may not have adequate risk management and information security measures with respect to their systems. Although we have not experienced a material breach of our information systems or data, we and some of our vendors have been and will likely continue to be subject to breaches of and attempts to gain unauthorized access to our systems or data or efforts to otherwise disrupt our operations. Any actual or perceived noncompliance with applicable data privacy and security laws or any

**Current (2025):**

Our significant use of and reliance on complex technologies and information systems in our operations, including our increasing deployment of new technologies, such as advanced forms of automation and artificial intelligence, and virtualization of many business activities, and our collection and retention of personal, sensitive and confidential information, represent large-scale opportunities for attacks on, vulnerabilities in or other failures of our information systems, information and energy grid and infrastructure. Our digitalization and grid modernization efforts, including the networking of operational technology assets such as substations, continue to increase the potential vulnerabilities and points of failure in our information systems. We are also at risk of attacks on, vulnerabilities in or other failures of third-party vendors' and/or regulators' technologies and systems, depending on the level of access these vendors and agencies have to our information and systems. Viruses, ransomware, malware and other forms of cyber-attacks targeting utility systems and other energy infrastructure are continuously increasing in sophistication, magnitude and frequency, may not be recognized until launched against a target and may further escalate during periods of heightened geopolitical tensions. Accordingly, we may be unable to anticipate these techniques or to implement adequate preventative measures, making it impossible for us to eliminate this risk. Our businesses also face challenges related to data governance, including the need to manage and secure large volumes of electronic data with the aim to meet regulatory requirements and create a foundation for the potential use of artificial intelligence tools. SDG&E and SoCalGas are increasingly required to disclose large amounts of data (including customer personal information and energy use data) to support state energy initiatives, increasing the risks of inadvertent disclosure or unauthorized access of sensitive information. Moreover, all our businesses operating in California (and in other states and countries that have similar laws) are subject to enhanced state privacy laws, which require companies that collect information about California residents to, among other things, disclose their data collection, use and sharing practices; allow consumers to opt out of certain data sharing with third parties; and assume liability for unauthorized disclosure of certain highly sensitive personal information. Although we make significant investments in risk management, technology resiliency and information security measures for the protection of our systems and data, these measures could be insufficient or otherwise fail, particularly against attacks involving sophisticated adversaries, including nation-state actors, or outages involving key technology vendors. The costs and operational consequences of implementing, maintaining and enhancing these measures are significant and expected to increase to address evolving cyber risks. We often rely on third-party vendors to deploy new technologies and maintain and update our systems (including providing security updates), and these third parties may not have adequate risk management, technology resiliency and information security measures with respect to their systems or may fail to timely provide and install software updates. Although we have not experienced a material breach of our information systems or data, we and some of our vendors have been and will likely continue to be subject to breaches of and attempts to gain unauthorized access to our systems or data or efforts to otherwise disrupt our operations. Any actual or perceived noncompliance with applicable data privacy and security laws or any incidents impacting our or our vendors' information systems; the integrity of the energy grid, our pipelines or our distribution, storage and other infrastructure; or our personal, sensitive and confidential information could result in disruptions to our business operations, regulatory compliance failures, inability to produce accurate and timely financial statements, energy delivery failures, financial and reputational loss, litigation, violations of applicable laws and fines or penalties, any of which could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects. Although Sempra currently maintains cyber liability insurance, this insurance is limited in scope and subject to exceptions, conditions and coverage limitations and may not cover the costs associated with a cybersecurity incident, and there is no guarantee that the insurance we currently maintain will continue to be available at rates we believe are reasonable.

---

## Modified: Our business could be negatively affected by activist shareholders.

**Key changes:**

- Reworded sentence: "In taking these steps, activist shareholders could seek to acquire our capital stock, in spite of the provisions of our articles of incorporation and bylaws that could have the effect of delaying, deterring or preventing a change of control or other takeover of our company, even when our shareholders might consider such a change of control to be in their best interests."

**Prior (2024):**

We have been and may in the future be subject to activist shareholder attention. Activist shareholders may engage in proxy solicitations, advance shareholder proposals or otherwise attempt to effect changes in or assert influence on our board of directors and management. In taking these steps, activist shareholders could seek to acquire our capital stock, which at certain ownership levels could threaten our ability to use some or all our NOL or tax credit carryforwards if our corporation experiences an "ownership change" under applicable tax rules. Responding to activist shareholders can be costly and time-consuming and requires time and attention by our board of directors and management, diverting their attention from our business strategies.

**Current (2025):**

We have been and may in the future be subject to activist shareholder attention. Activist shareholders may engage in proxy solicitations, advance shareholder proposals or otherwise attempt to effect changes in or assert influence on our board of directors and management. In taking these steps, activist shareholders could seek to acquire our capital stock, in spite of the provisions of our articles of incorporation and bylaws that could have the effect of delaying, deterring or preventing a change of control or other takeover of our company, even when our shareholders might consider such a change of control to be in their best interests. At certain ownership levels, these acquisitions of our common stock could threaten our ability to use some or all of our NOL or tax credit carryforwards if our corporation experiences an "ownership change" under applicable tax rules. Responding to activist

---

## Modified: Changes in the regulation of Oncor or the regulation or operation of the electric utility industry and/or the ERCOT market could negatively affect Oncor.

**Key changes:**

- Reworded sentence: "Oncor operates in the electric utility industry and is subject to many of the same or similar risks as SDG&E and SoCalGas as we describe above under "Risks Related to All Sempra Businesses" and "Risks Related to Sempra California," particularly with respect to our operational risks, financial risks and specifically regulation by federal, state, and local legislative and regulatory authorities regarding rates and other financial and operational matters."
- Reworded sentence: "In ERCOT, rates are set by the PUCT based on a historical test year, and as a result, the rates Oncor is allowed to charge generally will not exactly match its costs at any given point in time and there is no assurance that it will be able to timely or fully recover its actual costs and/or earn its full return on invested capital, particularly during periods of increased capital spending by Oncor, high inflation, or increases in general interest rates relative to Oncor's most recent base rate review."
- Added sentence: "Failure to receive approval of its requests in any rate proceeding could adversely impact Oncor, which could adversely impact us, and those impacts could be material."
- Added sentence: "The costs and burdens associated with complying with the various legislative and regulatory requirements to which Oncor is subject at the federal, state, and local levels and adjusting Oncor's business and operations in response to legislative and regulatory developments, including changes in ERCOT, and any fines or penalties that could result from any noncompliance, may have a material adverse effect on Oncor."
- Added sentence: "In addition, insufficient electric capacity within ERCOT or significant changes within ERCOT or to the ERCOT market structure that impact transmission and distribution utilities, including adverse publicity or public perception, additional regulatory requirements or oversight, could materially adversely affect Oncor."

**Prior (2024):**

Oncor operates in the electric utility industry and, as a result, it is subject to many of the same or similar risks as Sempra California as we describe above under "Risks Related to Sempra California," particularly with respect to regulation by federal, state, and local legislative and regulatory authorities regarding rates and other financial matters as well as operational matters. Oncor operates in the ERCOT market. In ERCOT, rates are set by the PUCT based on a historical test year, and as a result, the rates Oncor is allowed to charge generally will not exactly match its costs at any given point in time and there is no assurance that it will be able to timely or fully recover its actual costs and/or earn its full return on invested capital. Further, the approved levels of recovery could be significantly less than the requested levels, and the approved timing for recovery could differ from proposed timelines. In addition to requests to recover its costs, Oncor's rate proceedings may contain other requests. Failure to receive

**Current (2025):**

Oncor operates in the electric utility industry and is subject to many of the same or similar risks as SDG&E and SoCalGas as we describe above under "Risks Related to All Sempra Businesses" and "Risks Related to Sempra California," particularly with respect to our operational risks, financial risks and specifically regulation by federal, state, and local legislative and regulatory authorities regarding rates and other financial and operational matters. Oncor operates in the ERCOT market. In ERCOT, rates are set by the PUCT based on a historical test year, and as a result, the rates Oncor is allowed to charge generally will not exactly match its costs at any given point in time and there is no assurance that it will be able to timely or fully recover its actual costs and/or earn its full return on invested capital, particularly during periods of increased capital spending by Oncor, high inflation, or increases in general interest rates relative to Oncor's most recent base rate review. Further, the approved levels of recovery could be significantly less than requested levels, and the approved timing for recovery could differ from proposed timelines. In addition to requests to recover its costs, Oncor's rate proceedings may contain other requests. Failure to receive approval of its requests in any rate proceeding could adversely impact Oncor, which could adversely impact us, and those impacts could be material. The costs and burdens associated with complying with the various legislative and regulatory requirements to which Oncor is subject at the federal, state, and local levels and adjusting Oncor's business and operations in response to legislative and regulatory developments, including changes in ERCOT, and any fines or penalties that could result from any noncompliance, may have a material adverse effect on Oncor. In addition, insufficient electric capacity within ERCOT or significant changes within ERCOT or to the ERCOT market structure that impact transmission and distribution utilities, including adverse publicity or public perception, additional regulatory requirements or oversight, could materially adversely affect Oncor. Moreover, legislative, regulatory, market or industry activities could adversely impact Oncor's collections and cash flows and jeopardize the predictability of utility earnings. For instance, the PUCT has instituted various projects reviewing the regulatory framework regarding DER and other non-traditional technologies. As DER usage continues to grow, related regulatory decisions, including with respect to ERCOT market rules and transmission and distribution utilities' ability to invest in non-traditional electricity delivery solutions, could adversely impact Oncor's revenues and operations. Additionally, projected load growth across the ERCOT system could, if not sufficiently addressed through system design and reliability measures, negatively impact electric infrastructure reliability and potentially cause system-wide stresses. If Oncor does not successfully respond to applicable legislative, regulatory, market or industry developments, Oncor could suffer a deterioration in its results of operations, financial condition, cash flows and/or prospects, which could materially adversely affect our results of operations, financial condition, cash flows and/or prospects.

---

## Modified: SDG&E may incur significant costs and liabilities from its partial ownership of a nuclear facility being decommissioned.

**Key changes:**

- Reworded sentence: "SDG&E has a 20% ownership interest in SONGS, which we discuss in Note 14 of the Notes to Consolidated Financial Statements."
- Reworded sentence: "Although the facility is being decommissioned, SDG&E's ownership interest in SONGS continues to subject it to risks, including: ▪the potential release of radioactive material ▪the potential harmful effects from the former operation of the facility ▪limitations on the insurance commercially available to cover losses associated with operating and decommissioning the facility ▪uncertainties with respect to the technological, financial, and political aspects of decommissioning the facility and the long-term storage of radioactive materials SDG&E maintains the SONGS NDT to provide funds for nuclear decommissioning."

**Prior (2024):**

SDG&E has a 20% ownership interest in SONGS, which we discuss in Note 15 of the Notes to Consolidated Financial Statements. SDG&E and each of the other owners of SONGS is responsible for financing its share of the facility's expenses and capital expenditures, including those related to decommissioning activities. Although the facility is being decommissioned, SDG&E's ownership interest in SONGS continues to subject it to risks, including: ▪the potential release of radioactive material ▪the potential harmful effects from the former operation of the facility ▪limitations on the insurance commercially available to cover losses associated with operating and decommissioning the facility

**Current (2025):**

SDG&E has a 20% ownership interest in SONGS, which we discuss in Note 14 of the Notes to Consolidated Financial Statements. SDG&E and each of the other owners of SONGS is responsible for financing its share of the facility's expenses and capital expenditures, including those related to decommissioning activities. Although the facility is being decommissioned, SDG&E's ownership interest in SONGS continues to subject it to risks, including: ▪the potential release of radioactive material ▪the potential harmful effects from the former operation of the facility ▪limitations on the insurance commercially available to cover losses associated with operating and decommissioning the facility ▪uncertainties with respect to the technological, financial, and political aspects of decommissioning the facility and the long-term storage of radioactive materials SDG&E maintains the SONGS NDT to provide funds for nuclear decommissioning. Trust assets generally have been invested in equity and debt securities, which are subject to market fluctuations. A decline in the market value of trust assets, an adverse change in the law regarding funding requirements for decommissioning trusts, or changes in assumptions or forecasts related to decommissioning dates, technology and the cost of labor, materials and equipment due to inflationary pressures or otherwise could increase the funding requirements for these trusts, which costs may not be fully recoverable in rates. In addition, CPUC approval is required to make withdrawals from the NDT, and CPUC approval for certain expenditures may be denied if the CPUC determines the expenditures are unreasonable. In addition, decommissioning may be materially more expensive than we currently anticipate and therefore decommissioning costs may exceed the amounts in the NDT. Rate recovery for overruns would require CPUC approval, which may not occur. The occurrence of any of these events could result in a reduction in our expected recovery and have a material adverse effect on SDG&E's and Sempra's results of operations, financial condition, cash flows and/or prospects.

---

## Modified: 2024 Form 10-K | 43

**Key changes:**

- Reworded sentence: "Table of Contents Table of Contents issues which we have experienced in the past."
- Reworded sentence: "Sempra Infrastructure engages in JVs and invests in companies in which other equity partners have or share with us control over the applicable project or investment."

**Prior (2024):**

Table of Contents Table of Contents for our long-term supply, sales and capacity contracts. The failure of any of our counterparties to perform in accordance with their arrangements with us could materially adversely affect our results of operations, financial condition, cash flows and/or prospects. In addition, Sempra Infrastructure's obligations and those of its counterparties, such as its LNG customers, are contractually subject to suspension or termination for force majeure events, which generally are beyond the control of the parties. Force majeure declarations may also have attendant negative consequences, such as the fees lost by Cameron LNG JV on delivery of excess LNG to tolling customers in connection with certain force majeure events, or loss or deferral of revenue arising from non-deliveries of natural gas from suppliers or LNG to customers in certain circumstances. Also, certain force majeure events may impact the contractors constructing Sempra Infrastructure's projects, which may result in increased costs or schedule delays. Sempra Infrastructure may have limited remedies available for certain failures to perform, including limitations on damages that may prohibit recovery of costs incurred for any breach of an agreement. Any such occurrence could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects. Sempra Infrastructure engages in JVs and invests in companies in which other equity partners may have or share with us control over the applicable project or investment. Sempra Texas also invests in companies it does not control or manage. We discuss the risks related to such arrangements above under "Risks Related to Sempra - Operational and Structural Risks."

**Current (2025):**

Table of Contents Table of Contents issues which we have experienced in the past. Any such issues that arise in the future with respect to our long-term contracts could lead to significant legal and other costs, result in cancelation of certain key contracts or otherwise adversely affect our relationships with long-term customers, suppliers or partners, and could negatively impact the reliability of revenues from the applicable projects and the prospects for any implicated development projects. Any such event could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects. Sempra Infrastructure's obligations and those of its counterparties, such as its LNG customers, are contractually subject to suspension or termination for force majeure events, which generally are beyond the control of the parties. Force majeure declarations may also have attendant negative consequences, or loss or deferral of revenue arising from non-deliveries of natural gas from suppliers or LNG to customers in certain circumstances. Also, certain force majeure events may impact the contractors constructing Sempra Infrastructure's projects, which may result in delays or increased costs. Sempra Infrastructure may have limited remedies available for certain failures to perform, including limitations on damages that may prohibit recovery of costs incurred for any breach of an agreement. Any such occurrence could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects. Sempra Infrastructure engages in JVs and invests in companies in which other equity partners have or share with us control over the applicable project or investment. Sempra Texas also invests in companies it does not control or manage. We discuss the risks related to such arrangements above under "Risks Related to Sempra - Operational and Structural Risks."

---

## Modified: Failure by the CPUC to adequately reform SDG&E's electric rate structure could negatively impact SDG&E and Sempra.

**Key changes:**

- Reworded sentence: "The NEM program is an electric billing tariff mechanism designed to promote the installation of on-site renewable energy generation (primarily solar installations) for residential and business customers."
- Reworded sentence: "In December 2023, a new Net Billing Tariff"

**Prior (2024):**

The NEM program is an electric billing tariff mechanism designed to promote the installation of on-site renewable generation (primarily solar installations) for residential and business customers. Depending on when the on-site generation is installed, NEM customers receive a full retail rate or a reduced retail rate for energy they generate but do not use that is fed to the utility's power grid, which results in these customers not paying their proportionate share of the cost of maintaining and operating the electric transmission and distribution system, subject to certain exceptions, but still receiving electricity from the system when their self-generation is inadequate to meet their electricity needs. As more and higher electric-use customers switch to NEM and self-generate energy, the burden on remaining non-NEM customers, who effectively subsidize the unpaid NEM costs, increases, which in turn encourages more self-generation and further increases rate pressure on remaining non-NEM customers. The current electric residential rate structure in California is primarily based on consumption volume, which places a higher rate burden on customers with higher electric use while subsidizing lower-use customers. In December 2023, a new Net Billing Tariff was implemented for customers who interconnect their qualifying on-site renewable generation after April 2023. The new Net Billing Tariff revised the NEM structure for new customers with a retail export compensation rate that is better aligned with the value provided to the grid by behind-the-meter energy generation systems and retail import rates that encourage electrification and adoption of solar systems paired with storage. The new Net Billing Tariff is designed to compensate customers for the value of their exports to the grid based on avoided cost. Additionally, in response to California legislation adopted in 2022, the CPUC has initiated a rulemaking to broadly restructure the way fixed costs are collected, moving away from volumetric only charges and incorporating an income-graduated fixed charge for default residential rates. The intent of such a fixed charge is to establish a rate structure that allows the utility to collect a greater portion of its fixed costs on a non-volumetric basis, achieve the state's climate goals through end-use electrification and provide a more affordable rate design on average for lower-income customers. We expect a CPUC decision adopting the fixed charge by July 2024 with implementation occurring as early as the second half of 2025. Depending on the effectiveness of the new Net Billing Tariff and fixed charge, which are uncertain, the risks associated with the existing NEM tariff and rate design could continue or increase. SDG&E believes the establishment of a charge independent of consumption volume for residential customers is critical to help distribute rates among all customers that rely on the electric transmission and distribution system, including those participating in the NEM program. The absence of a charge independent of consumption volume coupled with the continuing increase of solar installation and other forms of self-generation and DER, as well as energy efficiency initiatives that could also reduce delivered volumes, could adversely impact electricity rates and the reliability of the electric transmission and distribution system. Any such impact could subject SDG&E to increased customer dissatisfaction, increased likelihood of noncompliance with CPUC or other safety or operational standards and increased risks attendant to any such noncompliance, as we discuss above, as well as increased costs, including power procurement, operating and capital costs, and potential disallowance of recovery for these costs. If the CPUC does not adequately reform SDG&E's residential rate structure to better achieve reasonable, cost-based electric rates that are competitive with alternative sources of power and adequate to maintain the reliability of the electric transmission and

**Current (2025):**

The NEM program is an electric billing tariff mechanism designed to promote the installation of on-site renewable energy generation (primarily solar installations) for residential and business customers. Depending on when the on-site generation is installed, NEM customers receive a full retail rate or a reduced retail rate for energy they generate but do not use that is fed to the utility's power grid, which results in these customers not paying their proportionate share of the cost of maintaining and operating the electric transmission and distribution system, subject to certain exceptions, but still receiving electricity from the system when their self-generation is inadequate to meet their electricity needs. As more and higher electric-use customers switch to NEM and self-generate energy, the burden on remaining non-NEM customers, who effectively subsidize the unpaid NEM costs, increases, which in turn encourages more self-generation and further increases rate pressure on remaining non-NEM customers. The current electric residential rate structure in California is primarily based on consumption volume, which places a higher rate burden on customers with higher electric use while subsidizing lower-use customers. In December 2023, a new Net Billing Tariff

---

## Modified: 2024 Form 10-K | 40

**Key changes:**

- Reworded sentence: "Table of Contents Table of Contents exacerbated by supply chain and gas transportation capacity constraints, tight labor markets, and cost increases due to inflationary pressures, tariffs or otherwise, that may not be recoverable in a timely manner or at all; operational restrictions resulting from environmental requirements or governmental interventions or permitting delays; inability to enter into, maintain, extend or replace long-term supply or transportation contracts; and performance below expected levels."

**Prior (2024):**

Our facilities and the systems that interconnect and/or manage them are subject to risks of, among other things, equipment or process failures due to aging infrastructure or otherwise; human error; shortages of or delays in obtaining equipment, materials, commodities or labor, which have been and may in the future be exacerbated by supply chain constraints or tight labor market conditions, as well as increases to the costs of these items due to inflationary pressures or otherwise, which may not be recoverable in a timely manner or at all; operational restrictions resulting from environmental requirements or governmental interventions; inability to enter into, maintain, extend or replace long-term supply or transportation contracts; and performance below expected levels. Although our businesses undertake capital investment projects to construct, replace, operate, maintain and upgrade facilities and systems, such projects may not be completed or effective at managing these risks and involve significant costs that may not be recoverable. We often rely on third parties, including contractors, to perform work related to these projects and other maintenance activities, which may subject us to liability for safety issues and the quality of work performed by these third parties. Because some of our facilities are interconnected with those of third parties, including third-party natural gas pipelines and power generation facilities that produce most of the power we distribute, the operation of our facilities could also be materially adversely affected by these or similar risks to such third-party systems, which may be unanticipated or uncontrollable by us. Additional risks associated with our ability to safely and reliably construct, replace, operate, maintain and upgrade facilities and systems, which may be beyond our control, include: ▪failure to meet customer demand for electricity and/or natural gas, including electrical blackouts or curtailments or gas outages ▪natural gas surges into homes or other properties ▪the release of hazardous or toxic substances, including gas leaks ▪the failure to respond effectively to catastrophic events The occurrence of any of these events could affect supply and demand for electricity, natural gas or other forms of energy, cause unplanned outages, damage our assets and/or operations or those of third parties on which our businesses rely, damage property owned by customers or others, and cause personal injury or death. In addition, if we are unable to defend and retain title to the properties we own or obtain or retain rights to construct and operate on the properties we do not own in a timely manner, on

**Current (2025):**

Table of Contents Table of Contents exacerbated by supply chain and gas transportation capacity constraints, tight labor markets, and cost increases due to inflationary pressures, tariffs or otherwise, that may not be recoverable in a timely manner or at all; operational restrictions resulting from environmental requirements or governmental interventions or permitting delays; inability to enter into, maintain, extend or replace long-term supply or transportation contracts; and performance below expected levels. Our businesses undertake capital investment projects to construct, replace, operate, maintain and upgrade facilities and systems, but such projects may not be completed or effective at managing these risks and involve significant costs that may not be recoverable. We often rely on third parties, including contractors, to perform work related to these projects and other maintenance activities, which may subject us to liability for safety issues and the quality of work performed. Because some of our facilities are interconnected with those of third parties, including customer-side-of-meter facilities, natural gas pipelines and power generation facilities that produce most of the power we distribute, the operation of our facilities could also be materially adversely affected by these or similar risks to such third-party systems, which may be unanticipated or uncontrollable by us. Additional risks associated with our ability to safely and reliably construct, replace, operate, maintain and upgrade facilities and systems, which may be beyond our control, include: ▪failure to meet customer demand for electricity and/or natural gas, including electric or gas outages ▪gas surges into homes or other properties ▪release of hazardous or toxic substances, including gas leaks ▪other incidents impacting the health, safety, or security of employees, contractors, the public or our infrastructure ▪failure to respond effectively to catastrophic events The occurrence of any of these events could affect supply and demand for electricity, natural gas or other forms of energy, cause unplanned outages, damage our assets and/or operations or those of third parties on which our businesses rely, damage property owned by customers or others, and cause personal injury or death. In addition, if we are unable to defend and retain title to the properties we own or obtain or retain rights to construct and operate on the properties we do not own in a timely manner, on reasonable terms or at all, we could lose our rights to occupy and use these properties and related facilities, which could prevent, limit or delay existing or proposed operations or projects, increase our costs, and result in breaches of permits or contracts and related legal costs, impairments, fines or penalties. Any such outcome could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects.

---

## Modified: The electricity industry is undergoing significant change, including increased deployment of renewable energy sources and energy storage, technological advancements, evolving procurement service standards, and political and regulatory developments.

**Key changes:**

- Reworded sentence: "Electric utilities in California are experiencing increasing deployment of solar and wind generation, including DER, energy storage and energy efficiency and demand management technologies, and California's environmental policy objectives are accelerating the pace and scope of these changes."
- Reworded sentence: "The framework is intended to more equitably allocate SDG&E's procurement cost obligations among customers served by SDG&E and customers now served by CCA and DA."

**Prior (2024):**

Table of Contents Table of Contents compete with incumbent utilities for the construction and operation of transmission facilities. The CPUC is conducting various proceedings regarding DER, including the evaluation of special programs and pilots; changes to the planning and operation of the electric grid to prepare for higher penetration of DER; future grid modernization investments; the deferral of traditional grid investments by DER; and the role of the electric grid operator. These proceedings and the broader changes in California's electricity industry could result in new regulations, policies and/or operational changes that could materially adversely affect SDG&E's and Sempra's results of operations, financial condition, cash flows and/or prospects. Most of SDG&E's customers receive electric procurement service from a load-serving entity other than SDG&E through programs such as CCA and DA. CCA is only available if a customer's local jurisdiction (city or county) offers such a program, as is the case with the City of San Diego and certain other jurisdictions in SDG&E's service territory, and DA is currently limited by a cap based on gigawatt hours. As a result of customers electing CCA and DA services, SDG&E's historical energy procurement commitments for future deliveries exceed the needs of its remaining bundled customers. To help achieve the goal of ratepayer indifference (as to whether customers' energy is procured by SDG&E or by CCA or DA), the CPUC revised the Power Charge Indifference Adjustment framework. The purpose of the framework is to help ensure SDG&E's procurement cost obligations are more equitably shared among customers served by SDG&E and customers now served by CCA and DA. If the framework or other mechanisms designed to achieve ratepayer indifference do not perform as intended, if the law changes, or if the law is not interpreted or enforced as expected, SDG&E's remaining bundled customers could experience large increases in rates for commodity costs under commitments made on behalf of CCA and DA customers prior to their departure or, if all such costs are not recoverable in rates, SDG&E could experience material increases in its unrecoverable commodity costs. Any of these outcomes could have a material adverse effect on SDG&E's and Sempra's results of operations, financial condition, cash flows and/or prospects.

**Current (2025):**

Electric utilities in California are experiencing increasing deployment of solar and wind generation, including DER, energy storage and energy efficiency and demand management technologies, and California's environmental policy objectives are accelerating the pace and scope of these changes. This growth will require further modernization of the electric grid to, among other things, accommodate increasing two-way flows of electricity and increase the grid's capacity to interconnect these resources. In addition, attaining California's clean energy goals will require sustained investments in transmission and distribution grid modernization, renewable energy integration projects, energy efficiency programs, operational and data management systems, and electric vehicle and energy storage infrastructure, which may increase exposure to overall grid instability and technology obsolescence. The growth of third-party energy storage alternatives and other technologies also may increasingly compete with SDG&E's traditional transmission and distribution infrastructure in delivering electricity to consumers. Certain FERC transmission development projects are open to competition, allowing independent developers to compete with incumbent utilities for the construction and operation of transmission facilities. The CPUC is conducting various proceedings regarding DER, including the evaluation of special programs and pilot projects; changes to the planning and operation of the electric grid to prepare for higher penetration of DER; future grid modernization investments; the deferral of traditional grid investments by DER; and the role of the electric grid operator. These proceedings and the broader changes in California's electricity industry could result in new regulations, policies and/or operational changes that could materially adversely affect SDG&E's and Sempra's results of operations, financial condition, cash flows and/or prospects. Most of SDG&E's customers receive electric procurement service from a load-serving entity other than SDG&E through programs such as CCA and DA. CCA is only available if a customer's local jurisdiction (city or county) offers such a program, as is the case with the City of San Diego and certain other jurisdictions in SDG&E's service territory, and DA is currently limited by a cap based on gigawatt hours. As a result of customers electing CCA and DA services, SDG&E's historical energy procurement commitments for future deliveries exceed the needs of its remaining bundled customers. To help achieve the goal of ratepayer indifference (as to whether customers' energy is procured by SDG&E or by CCA or DA), the CPUC revised the Power Charge Indifference Adjustment framework. The framework is intended to more equitably allocate SDG&E's procurement cost obligations among customers served by SDG&E and customers now served by CCA and DA. If the framework or other mechanisms designed to achieve ratepayer indifference do not perform as intended, if the law changes, or if the law is not interpreted or enforced as expected, SDG&E's remaining bundled customers could experience large increases in rates for commodity costs under commitments made on behalf of CCA and DA customers prior to their departure or, if all such costs are not recoverable in rates, SDG&E could experience material increases in its unrecoverable commodity costs. Any of these outcomes could have a material adverse effect on SDG&E's and Sempra's results of operations, financial condition, cash flows and/or prospects.

---

## Modified: We may not be able to secure, maintain, extend or replace long-term supply, sales or capacity agreements.

**Key changes:**

- Reworded sentence: "Sempra Infrastructure's ability to secure new or maintain, extend or replace existing long-term sales or capacity agreements for its natural gas pipeline operations depends on, among other factors, demand for and supply of LNG and/or natural gas from its transportation customers, which may include our LNG facilities."
- Reworded sentence: "Without long-term power sales agreements, our revenues may be subject to increased volatility, and we may be unable to sell the power that Sempra Infrastructure's facilities can produce at favorable prices or at all, any of which could materially adversely affect our results of operations, financial condition, cash flows and/or prospects."

**Prior (2024):**

The ECA Regas Facility has long-term capacity agreements with a limited number of counterparties, and also may enter into short-term and/or long-term supply agreements to purchase LNG to be received, stored and regasified for sale to other parties. In addition, Cameron LNG JV has long-term liquefaction and regasification tolling agreements with three counterparties that collectively subscribe for the full nameplate capacity of the Cameron LNG Phase 1 facility, and long-term sale and purchase agreements are in place for the expected capacity at the ECA LNG Phase 1 and PA LNG Phase 1 projects under construction. The long-term nature of these agreements and the small number of customers at each of these facilities exposes us to risks, including increased risk if these counterparties fail to meet their contractual obligations on a timely basis, increased credit risks, and risks associated with our relationships with these counterparties, including increased impacts of disputes or other similar issues which we have experienced in the past. Any such issues that arise in the future with respect to our long-term contracts could lead to significant legal and other costs, result in cancelation of certain key contracts or otherwise adversely affect our relationships with long-term customers, suppliers or partners, and could negatively impact the reliability of revenues from the applicable projects and the prospects for any implicated development projects. Any such event could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects. Sempra Infrastructure's ability to enter into new or replace existing long-term capacity agreements for its natural gas pipeline operations depends on, among other factors, demand for and supply of LNG and/or natural gas from its transportation customers, which may include our LNG export facilities. A decrease in demand for or supply of LNG or natural gas from such customers or the occurrence of other events that hinder Sempra Infrastructure from maintaining such agreements or establishing new ones could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects. The electric generation and wholesale power sales industries are highly competitive. As more plants are built, supplies of energy and related products may exceed demand, competitive pressures may increase and wholesale electricity prices may decline or become more volatile. Without long-term power sales agreements, our revenues may be subject to increased volatility, and we may be unable to sell the power that Sempra Infrastructure's facilities are capable of producing at favorable prices or at all, any of which could materially adversely affect our results of operations, financial condition, cash flows and/or prospects.

**Current (2025):**

Sempra Infrastructure's ability to secure new or maintain, extend or replace existing long-term sales or capacity agreements for its natural gas pipeline operations depends on, among other factors, demand for and supply of LNG and/or natural gas from its transportation customers, which may include our LNG facilities. A decrease in demand for or supply of LNG or natural gas from such customers or the occurrence of other events that hinder Sempra Infrastructure from maintaining such agreements or establishing new ones could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects. The electric generation and wholesale power sales industries are highly competitive. As more plants are built, supplies of energy and related products may exceed demand, competitive pressures may increase and wholesale electricity prices may decline or become more volatile. Without long-term power sales agreements, our revenues may be subject to increased volatility, and we may be unable to sell the power that Sempra Infrastructure's facilities can produce at favorable prices or at all, any of which could materially adversely affect our results of operations, financial condition, cash flows and/or prospects.

---

## Modified: 2024 Form 10-K | 57

**Key changes:**

- Reworded sentence: "Table of Contents Table of Contents Any failures with respect to the above factors or other factors material to any particular project could involve additional costs, otherwise negatively affect our ability to successfully complete the project and force us to impair or write off amounts we have invested in the project."
- Reworded sentence: "Further, while we do not expect the construction or operation of the ECA LNG Phase 1 project to disrupt operations at the ECA Regas Facility, we expect construction of the proposed ECA LNG Phase 2 project would conflict with the current operations at the ECA Regas Facility, which currently has firm storage service agreements and nitrogen injection service agreements with Shell and SEFE that expire in May 2028 and December 2025, respectively."

**Prior (2024):**

Table of Contents Table of Contents LNG Export Projects In addition to the risks described above that are applicable to all our energy infrastructure projects, we are exposed to additional risks in connection with our LNG export projects, including the ECA LNG Phase 1 project and PA LNG Phase 1 project under construction and our potential development of additional LNG export facilities. We discuss our LNG export projects in "Part II - Item 7. MD&A - Capital Resources and Liquidity - Sempra Infrastructure." Each of these projects faces numerous risks. Our ability to reach a final investment decision for each project and, if a positive decision is made and a project is completed, the overall success of the project depend in part on global energy markets. In general, depressed natural gas and LNG prices in the markets we intend to serve could reduce the pricing and cost advantages of exporting domestically produced natural gas and LNG, which could lead to decreased demand. In addition, global oil prices and their associated current and forward projections could reduce demand for natural gas and LNG in some sectors. Although demand for natural gas is currently strong due to increased recognition of the importance of energy security and climate aims, a reduction in natural gas demand could also occur from higher penetration of alternative fuels in new power generation, reduced economic activity in general, or as a result of calls by some to limit or eliminate global reliance on natural gas. Both the U.S. and Mexico will hold federal elections in 2024 and LNG exports face increased political scrutiny in connection with these elections. Moreover, because LNG projects take a number of years to develop and construct, it is difficult to match current and expected demand with the projected supply from projects under development. Additionally, shifts in U.S. and foreign energy policy could impact supply, demand and other matters critical to LNG projects, such as permitting and other approval processes. The current Administration has temporarily paused LNG export approvals while the DOE reviews the economic and environmental analyses it uses to evaluate LNG export applications to non-FTA countries, and the DOE has recently implemented changes to its approach to requests for extensions of time to commence LNG exports under existing non-FTA approvals. These actions, as well as other market factors such as oil prices, could delay or hamper the development of U.S. LNG export facilities and make LNG projects in other parts of the world more feasible and competitive with LNG projects in North America, thus increasing supply and competition for global LNG demand. Any of these occurrences could impact competition and prospects for developing LNG export projects and negatively affect the performance and prospects of any of our projects that are or become operational. Our projects may face distinct disadvantages relative to some LNG projects being pursued by other project developers, including: ▪The proposed Cameron LNG Phase 2 project is subject to certain restrictions and conditions under the financing agreements for the Cameron LNG Phase 1 facility and requires unanimous consent of all JV members, including with respect to the equity investment obligations of each partner. We may not be able to satisfy the conditions under the financing agreements, receive members' consent or obtain the extension of our non-FTA approval, in which case our ability to develop the Cameron LNG Phase 2 project would be jeopardized. ▪The ECA LNG projects under construction and in development are subject to ongoing land and permit disputes that could obstruct efforts to find or maintain suitable partners, customers and financing arrangements and hinder or halt construction and, if the projects are completed, operations. We discuss these risks below and under "Risks Related to Sempra Infrastructure - Legal and Regulatory Risks." In addition, the Mexican regulatory process and overlay of U.S. regulation for natural gas exports to LNG facilities in Mexico are not well developed, which, among other factors, contributed to delays in obtaining a necessary permit from the Mexican government for the ECA LNG Phase 1 project and could cause similar delays or other hurdles in the future and lead to difficulties finding or maintaining suitable partners, customers and financing arrangements. Further, while we do not expect the construction or operation of the ECA LNG Phase 1 project to disrupt operations at the ECA Regas Facility, we expect construction of the proposed ECA LNG Phase 2 project would conflict with the current operations at the ECA Regas Facility, which currently has long-term regasification contracts for 100% of the regasification facility's capacity through 2028. This makes the decisions on whether, when and how to pursue the proposed ECA LNG Phase 2 project dependent in part on whether the investment in this project would, over the long term, be more beneficial financially than continuing to supply regasification services under our existing contracts. In addition, the Baja California region does not have extensive sources of natural gas, and our development opportunities in Mexico, including the proposed ECA LNG Phase 2 project, would require significant upgrades in natural gas transportation infrastructure that would be costly and time-consuming. ▪The PA LNG Phase 1 project under construction and the PA LNG Phase 2 project in development are located at a greenfield site and therefore are subject to disadvantages relative to projects being constructed or developed at brownfield sites, including increased time and costs to develop and construct the projects. Additionally, in February 2020, Sempra Infrastructure filed an application with the DOE to permit LNG produced from the proposed PA LNG Phase 2 project to be exported to all current and future FTA and non-FTA countries. We do not expect the DOE to act on this application until after the conclusion of the temporary pause on the DOE's LNG export approvals. Development of these or any other LNG export projects will depend on the expansion of our existing pipeline interconnections or the ability to permit and construct new pipeline facilities, each of which may require us to enter into additional pipeline interconnection agreements with third-party pipelines, which may not be possible on commercially reasonable terms or at all.

**Current (2025):**

Table of Contents Table of Contents Any failures with respect to the above factors or other factors material to any particular project could involve additional costs, otherwise negatively affect our ability to successfully complete the project and force us to impair or write off amounts we have invested in the project. If we are unable to complete a development project, if we experience delays, or if construction, financing or other project costs exceed our estimated budgets and we are required to make additional capital contributions, we may not receive an adequate or any return on our investment and other resources expended on the project and our results of operations, financial condition, cash flows and/or prospects could be materially adversely affected. The operation of existing facilities and any future projects we complete involves many risks, including the potential for unforeseen design flaws, engineering challenges, or the breakdown for other reasons of facilities, equipment or processes; labor disputes or shortages; fuel interruption; environmental contamination; increasing regulatory requirements, including from regulations aiming to reduce GHG emissions; and the other operational risks that we discuss above under "Risks Related to All Sempra Businesses - Operational Risks." Any of these events could lead to our facilities being idle or operating below expected levels, which may result in lost revenues or increased expenses, including higher maintenance costs and penalties. Any such occurrence could materially adversely affect our results of operations, financial condition, cash flows and/or prospects. LNG Projects In addition to the risks described above that are applicable to all our energy infrastructure projects, our LNG projects, which we discuss in "Part II - Item 7. MD&A - Capital Resources and Liquidity - Sempra Infrastructure," also face distinct disadvantages relative to some LNG projects being pursued by other project developers, including: ▪The proposed Cameron LNG Phase 2 project is subject to certain restrictions and conditions under the JV project financing agreements for the Cameron LNG Phase 1 facility and requires unanimous consent of all the members, including with respect to the equity investment obligation of each member. We may not be able to satisfy the conditions under the financing agreements, receive members' consent, obtain satisfactory conclusion on the EPC process, or obtain the extension of our non-FTA approval, in which case our ability to develop the Cameron LNG Phase 2 project would be jeopardized. ▪The ECA LNG projects under construction and in development are subject to ongoing land and permit disputes and recent and proposed changes to the Mexican Constitution and certain laws in Mexico that could obstruct efforts to find or maintain suitable partners, customers and financing arrangements and hinder or halt construction and, if the projects are completed, operations. We discuss these risks under "Risks Related to Sempra Infrastructure - Legal and Regulatory Risks." In addition, the Mexican regulatory process and overlay of U.S. regulation for natural gas exports to LNG facilities in Mexico are not well developed, which, among other factors, contributed to delays in obtaining a necessary permit from the Mexican government for the ECA LNG Phase 1 project and could cause similar delays or other hurdles in the future and lead to difficulties finding or maintaining suitable partners, customers and financing arrangements. Further, while we do not expect the construction or operation of the ECA LNG Phase 1 project to disrupt operations at the ECA Regas Facility, we expect construction of the proposed ECA LNG Phase 2 project would conflict with the current operations at the ECA Regas Facility, which currently has firm storage service agreements and nitrogen injection service agreements with Shell and SEFE that expire in May 2028 and December 2025, respectively. In addition, the Baja California region does not have extensive sources of natural gas, and at times, particularly during the summer, natural gas supply to the region is severely constrained and may impact our costs and our ability to source all feed gas required under our ECA LNG Phase 1 supply contracts. ▪The PA LNG Phase 1 project under construction is located at a greenfield site and is therefore subject to certain disadvantages relative to other projects being constructed or developed at brownfield sites, such as increased time and costs to develop and construct the project due to lack of existing infrastructure. The PA LNG Phase 2 project in development would be located at the site of the PA LNG Phase 1 project and would therefore be subject to certain advantages, as well as potential disadvantages, relative to projects being developed at greenfield sites. Advantages of brownfield development include the ability to leverage existing permits and infrastructure; disadvantages of brownfield development could include increased complexity of integrating new facilities with existing infrastructure. Additionally, in February 2020, Sempra Infrastructure filed an application with the DOE to permit LNG produced from the proposed PA LNG Phase 2 project to be exported to all current and future non-FTA countries, which we may not receive on a timely basis or at all. Development and operation of these or any other LNG projects will depend on the expansion of our existing pipeline interconnections or the ability to permit and construct new pipeline facilities, each of which may require us to enter into additional pipeline interconnection agreements with third-party pipelines, which may not be possible on reasonable terms or at all. The capital requirements for our LNG projects can be significant, even if we decide not to make a positive final investment decision. As has happened in the past, our proposed facilities may not be completed in accordance with estimated timelines or budgets or at all as a result of the above or other factors, and delays, cost overruns or our inability to complete one or more of these projects could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects.

---

## Modified: 2024 Form 10-K | 60

**Key changes:**

- Reworded sentence: "Table of Contents Table of Contents risks could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects."
- Reworded sentence: "Recent Mexican Constitutional reforms have proposed to transfer significant powers from CRE to SENER; implementing legislation on these reforms is expected to be forthcoming."

**Prior (2024):**

Table of Contents Table of Contents ▪adverse changes in social, political, economic or market conditions or the stability of foreign governments ▪adverse rulings by foreign courts or tribunals; challenges obtaining, maintaining and complying with permits or approvals; difficulty enforcing contractual and property rights; and differing legal standards ▪expropriation or theft of assets ▪demand for hydrocarbon fuels, such as natural gas imported from the U.S., may be impacted by geopolitical factors ▪with respect to our non-utility international business activities, changes in the priorities and budgets of international customers, which may be driven by many of the factors listed above, among others Mexican Government Influence on Economic and Energy Matters The Mexican government exercises significant and increasing influence over the Mexican energy sector and has adopted or proposed additional changes that, in each case, could impact private investment in this sector. Mexican governmental actions in the past several years in the electricity market include resolutions, orders, decrees, regulations and proposed and adopted amendments to Mexican law that could, among other things, threaten the prospects for private-party renewable energy generation in the country, limit the ability to dispatch renewable energy and receive or maintain operational permits, and increase costs of electricity for legacy renewables and cogeneration energy contract holders. We discuss some of these actions in Note 16 of the Notes to Consolidated Financial Statements. Moreover, reforms to centralize and de-privatize the electricity market in Mexico have been proposed previously and could be reintroduced in the future. With respect to midstream and downstream activities, Mexico's Hydrocarbons Law gives SENER and the CRE significant powers to suspend permits when a danger to national security, energy security, or the national economy is foreseen and to revoke permits under certain other circumstances, including for a failure to comply with certain minimum storage and other requirements or for violations of certain provisions established by SENER or the Hydrocarbons Law, as applicable. If future governmental actions are proposed and passed or otherwise become effective, if efforts to enjoin enforcement or suspend or overturn adopted governmental actions fail, or if other similar actions by the Mexican government are taken to curb private-party participation in the energy sector, including through further amendments to Mexican laws, rules or the constitution or increased investigative and enforcement activities, it may impact our ability to operate our facilities at existing levels or at all, result in increased costs for Sempra Infrastructure and its customers, adversely affect our ability to develop new projects, result in decreased revenues and cash flows, and negatively impact our ability to recover the carrying values of our investments in Mexico, any of which may have a material adverse effect on our business, results of operations, financial condition, cash flows and/or prospects. U.S. and Mexican Laws and Foreign Policy Our international business activities are subject to U.S. and Mexican laws and regulations related to foreign operations or doing business internationally, including the U.S. Foreign Corrupt Practices Act, the Mexican Federal Anticorruption Law in Public Contracting (Ley Federal Anticorrupción en Contrataciones Públicas) and similar laws, and are sensitive to U.S. and Mexican foreign policy, trade policy and other geopolitical factors. The current and the last U.S. Administrations have taken different stances with respect to international trade agreements, tariffs, immigration policy and other matters of foreign policy that impact trade and foreign relations. Shifts in foreign policy could create uncertainty and result in or increase adverse effects on our businesses. Violations or alleged violations of the laws referred to above, as well as foreign policy positions that adversely affect imports and exports between the U.S., Mexican and other foreign companies with which we conduct business, could materially adversely affect our results of operations, financial condition, cash flows and/or prospects.

**Current (2025):**

Table of Contents Table of Contents risks could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects. These risks include the following and the other risks discussed in this risk factor below: ▪compliance with tax, trade, environmental and other foreign laws and regulations, including legal limitations on ownership in some foreign countries and inadequate or inconsistent enforcement of regulations ▪actions by local regulatory bodies, such as the CRE, including setting rates and tariffs that may be earned by or charged to our businesses ▪the timing and outcome of ratemaking proceedings can be affected by various factors, many of which are not in our control and recovery may be delayed and/or insufficient to recover our costs ▪adverse changes in social, political, economic or market conditions or the stability of foreign governments or such foreign governments' relations with the U.S. government ▪adverse rulings by or instability in foreign courts or tribunals ▪challenges obtaining, maintaining and complying with permits or approvals ▪difficulty enforcing contractual and property rights and differing legal standards ▪expropriation or theft of assets ▪demand for hydrocarbon fuels, such as natural gas imported from the U.S., may be impacted by geopolitical factors ▪with respect to our non-utility international business activities, changes in the priorities and budgets of international customers, which may be driven by many of the factors listed above, among others Mexican Government Influence on Economic and Energy Matters The Mexican government exercises significant and increasing influence over the Mexican energy sector and has adopted or proposed additional changes that, in each case, could impact private investment in this sector. Mexican governmental actions in the past several years in the electricity market include resolutions, orders, decrees, regulations and proposed and adopted amendments to Mexican law that could, among other things, threaten the prospects for private-party renewable energy generation in the country, limit the ability to dispatch renewable energy and receive or maintain operational permits, increase costs of electricity for legacy renewable and cogeneration energy contract holders, and limit ownership of energy assets by private companies. We discuss some of these actions in Note 15 of the Notes to Consolidated Financial Statements. Moreover, the government of Mexico has implemented Mexican Constitutional energy reforms that will impact energy infrastructure and markets in Mexico. We await legislative action to determine the potential impact such reforms will have on the market generally and our business in particular. With respect to midstream and downstream activities, Mexico's Hydrocarbons Law gives SENER and the CRE significant powers to suspend permits when a danger to national security, energy security, or the national economy is foreseen and to revoke permits under certain other circumstances, including for a failure to comply with certain minimum storage and other requirements or for violations of certain provisions established by SENER or the Hydrocarbons Law, as applicable. Recent Mexican Constitutional reforms have proposed to transfer significant powers from CRE to SENER; implementing legislation on these reforms is expected to be forthcoming. Subsequent to the federal elections in Mexico in 2024 and, as noted above, the Mexican government has begun to introduce significant changes to the Mexican Constitution, which will require changes in laws, policies, and regulations in order to be implemented. These changes have included Mexican Constitutional reforms affecting the judiciary and the for-profit status of certain state-owned enterprises. The changes to the judiciary include a requirement that all judges be elected rather than appointed. The energy reforms have the potential to increase government control and participation in the energy sector and to create novel challenges for infrastructure development and operations. Additionally, a set of six energy-related laws, including modifications to the Hydrocarbons Law and Electricity Industry Law, were submitted to Mexico's Congress in January 2025. The legislative session runs from February 1 to April 30, and the government is targeting approval by the end of March 2025. These reforms and any further Mexican Constitutional, legal or regulatory changes could affect the Mexican economy, energy sector and our businesses, the extent of which we currently are unable to predict. If future governmental actions are proposed and passed or otherwise become effective, if efforts to enjoin enforcement or suspend or overturn adopted governmental actions fail, or if other similar actions by the Mexican government are taken to curb private-party participation in the energy sector, including through further amendments to Mexican laws, rules or the Mexican Constitution or increased investigative and enforcement activities, it may impact our ability to operate our facilities at existing levels or at all, result in increased costs for Sempra Infrastructure and for its power consumers, adversely affect our ability to develop new projects, result in decreased revenues and cash flows, and negatively impact our ability to recover the carrying values of our investments in Mexico, any of which could have a material adverse effect on our business, results of operations, financial condition, cash flows and/or prospects.

---

## Modified: Our businesses depend on the performance of counterparties.

**Key changes:**

- Reworded sentence: "Our businesses depend on the performance of business partners, customers, suppliers, contractors, and other counterparties under contractual and other arrangements to provide, among other things, services, equipment, or commodities."
- Reworded sentence: "In addition, many of these arrangements and relationships with counterparties are important for the development, construction and operation of our projects and growth of our businesses."
- Reworded sentence: "Further, we often face counterparty credit risk with respect to customers, suppliers, and other counterparties and, although we perform credit analyses prior to extending credit or entering into transactions with such counterparties, we may not be able to collect the amounts owed to us, which could be significant and present an increased risk for our long-term supply, sales and capacity contracts."

**Prior (2024):**

Our businesses depend on the performance of business partners, customers, suppliers and other counterparties under contractual and other arrangements to provide, among other things, services, equipment, or commodities and who may have significant unpaid financial obligations to us under these arrangements. If they fail to perform their obligations in accordance with these arrangements, we may be unable to meet our obligations and we may be required to enter into alternative arrangements or honor our underlying commitments at then-current market prices, which may result in losses to us or delays or other disruptions to our operations. Any efforts to enforce the terms of these arrangements through legal or other means could involve significant time and costs and would be unpredictable and subject to failure. In addition, many of these arrangements, including our relationships with the applicable counterparties, are important for the conduct and growth of our businesses. We also may not be able to secure replacement agreements with other counterparties on favorable terms, in a timely manner or at all if any of these arrangements terminate. Further, we often extend credit to customers and other counterparties and, although we perform credit analyses prior to extending credit, we may not be able to collect the amounts owed to us, which could be significant and present an increased risk

**Current (2025):**

Our businesses depend on the performance of business partners, customers, suppliers, contractors, and other counterparties under contractual and other arrangements to provide, among other things, services, equipment, or commodities. If they fail to perform their obligations in accordance with these arrangements or elect to exercise their early termination rights, we may be unable to meet our obligations and may be required to enter into alternative arrangements or honor our underlying commitments at then-current market prices, which may result in losses or delays or other operational disruptions. Any efforts to enforce the terms of these arrangements through legal or other means could involve significant time and costs and would be unpredictable and subject to failure. In addition, many of these arrangements and relationships with counterparties are important for the development, construction and operation of our projects and growth of our businesses. We also may not be able to secure replacement agreements with other counterparties on favorable terms, in a timely manner or at all if any of these arrangements terminate. Further, we often face counterparty credit risk with respect to customers, suppliers, and other counterparties and, although we perform credit analyses prior to extending credit or entering into transactions with such counterparties, we may not be able to collect the amounts owed to us, which could be significant and present an increased risk for our long-term supply, sales and capacity contracts. Volatility and disruptions in capital and credit markets could have a negative impact on our counterparties and their ability to meet their obligations. Sempra Infrastructure also faces risks related to doing business with PEMEX and the CFE, which are Mexican state-owned enterprises, including their financial solvency and regulation by the Mexican government and the risk that they fail to meet their respective contractual obligations, among others. Any delay or default in payment of our counterparties' financial obligations could result in our recording of a provision for credit losses on past due receivable balances and lower revenues, as was the case in 2023 and 2024 for a customer at Sempra Infrastructure. The failure of any of our counterparties to perform in accordance with their arrangements with us could materially adversely affect our results of operations, financial condition, cash flows and/or prospects. In addition, Sempra Infrastructure's ECA Regas Facility has long-term capacity agreements with a limited number of counterparties and also enters into short-term and/or long-term supply agreements to purchase LNG to be received, stored and regasified for sale to other parties. Cameron LNG JV has long-term liquefaction and regasification tolling agreements with three counterparties that collectively subscribe for the full nameplate capacity of the Cameron LNG Phase 1 facility, and long-term sale and purchase agreements are in place for the expected capacity at the ECA LNG Phase 1 and PA LNG Phase 1 projects under construction. The long-term nature of these agreements and the small number of customers at each of these facilities exposes us to risks, including increased risk if these counterparties fail to meet their contractual obligations on a timely basis, increased credit risks, and risks associated with our relationships with these counterparties, including increased impacts of disputes or other similar

---

## Modified: 2024 Form 10-K | 38

**Key changes:**

- Reworded sentence: "Table of Contents Table of Contents shareholders can be costly and time-consuming and requires time and attention by our board of directors and management, diverting their attention from our business strategies."

**Prior (2024):**

Table of Contents Table of Contents Any actual or perceived instability in our future direction, inability to execute our strategies, or changes in our board of directors or management team arising from activist shareholder campaigns could be exploited by our competitors and/or other activist shareholders, result in the loss of business opportunities, and make it more difficult to pursue our strategic initiatives or attract and retain qualified personnel and business partners, any of which could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects.

**Current (2025):**

Table of Contents Table of Contents shareholders can be costly and time-consuming and requires time and attention by our board of directors and management, diverting their attention from our business strategies. Any actual or perceived instability in our future direction, inability to execute our strategies, or changes in our board of directors or management team arising from activist shareholder campaigns could be exploited by our competitors and/or other activist shareholders, result in the loss of business opportunities, and make it more difficult to pursue our strategic initiatives or attract and retain qualified personnel and business partners, any of which could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects.

---

## Modified: 2024 Form 10-K | 53

**Key changes:**

- Reworded sentence: "Table of Contents Table of Contents investigations or open proceedings at its discretion, the results of which could include citations, disallowances, fines and penalties, as well as corrective or mitigation actions to address any noncompliance, any of which may not be sufficiently funded by customer rates or at all."
- Reworded sentence: "Success by any of these groups in directly or indirectly influencing legislators and regulators could have a material adverse effect on SDG&E's, SoCalGas' and Sempra's results of operations, financial condition, cash flows and/or prospects."

**Prior (2024):**

Table of Contents Table of Contents SDG&E. These ratemaking mechanisms are subject to many risks similar to those described above regarding the CPUC ratemaking proceedings. CPUC Authority Over Operational Matters Our operations are subject to CPUC rules (and similar FERC rules), commonly referred to as "affiliate rules," relating to transactions among SDG&E, SoCalGas and other Sempra businesses. These rules primarily impact market transactions and marketing activities involving transmission supply and capacity, including sales or other trades of natural gas or electricity between or among SDG&E and SoCalGas and Sempra and its covered affiliates. These rules, as well as any changes to these rules or their interpretations or additional more restrictive CPUC or FERC rules related to transactions with affiliates, could materially adversely affect our operations and, in turn, our results of operations, financial condition, cash flows and/or prospects. Additionally, the CPUC has regulatory authority related to safety standards and practices, reliability and planning, competitive conditions and a wide range of other operational matters, including citation and enforcement programs concerning matters such as safety activity, disconnection and billing practices, resource adequacy and environmental compliance. Many of these standards and citation and enforcement programs are becoming more stringent and could subject a utility to significant penalties and fines, as well as higher operating costs. The CPUC conducts reviews and audits of the matters under its authority and may launch investigations or open proceedings at its discretion, the results of which could include citations, disallowances, fines and penalties, as well as corrective or mitigation actions to address any noncompliance, any of which may not be sufficiently funded by customer rates or at all. Any such occurrence could have a material adverse effect on SDG&E's, SoCalGas' and Sempra's results of operations, financial condition, cash flows and/or prospects. We discuss various CPUC proceedings relating to SDG&E and SoCalGas in Notes 4 and 16 of the Notes to Consolidated Financial Statements. Regulatory Changes and Influence of Other Organizations SDG&E, SoCalGas and Sempra may be materially adversely affected by revisions or reinterpretations of existing or new legislation, regulations, decisions, orders or interpretations of the CPUC, the FERC or other regulatory bodies, any of which could change how SDG&E and SoCalGas operate, affect their ability to recover various costs through rates or adjustment mechanisms, require them to incur additional expenses or otherwise materially adversely affect their and Sempra's results of operations, financial condition, cash flows and/or prospects. SDG&E and SoCalGas are also affected by numerous advocacy groups, including California Public Advocates Office, The Utility Reform Network, Utility Consumers' Action Network and the Sierra Club. Any success by any of these groups in directly or indirectly influencing legislators and regulators could have a material adverse effect on SDG&E's, SoCalGas' and Sempra's results of operations, financial condition, cash flows and/or prospects.

**Current (2025):**

Table of Contents Table of Contents investigations or open proceedings at its discretion, the results of which could include citations, disallowances, fines and penalties, as well as corrective or mitigation actions to address any noncompliance, any of which may not be sufficiently funded by customer rates or at all. Any such occurrence could result in other regulatory exposure, significant litigation, and reputational harm and could have a material adverse effect on SDG&E's, SoCalGas' and Sempra's results of operations, financial condition, cash flows and/or prospects. We discuss various CPUC proceedings relating to SDG&E and SoCalGas in Notes 4 and 15 of the Notes to Consolidated Financial Statements. Regulatory Changes and Influence of Other Organizations SDG&E and SoCalGas incur significant capital, operating, and other costs associated with regulatory compliance. SDG&E, SoCalGas and Sempra may be materially adversely affected by revisions or reinterpretations of existing or new legislation, regulations, decisions, orders or interpretations of the CPUC, the FERC or other regulatory bodies, any of which could change how SDG&E and SoCalGas operate, affect their ability to recover various costs through rates or adjustment mechanisms, require them to incur additional expenses and compliance costs or otherwise materially adversely affect their and Sempra's results of operations, financial condition, cash flows and/or prospects. SDG&E and SoCalGas are also affected by numerous advocacy groups, including California Public Advocates Office, The Utility Reform Network, Utility Consumers' Action Network and the Sierra Club. Success by any of these groups in directly or indirectly influencing legislators and regulators could have a material adverse effect on SDG&E's, SoCalGas' and Sempra's results of operations, financial condition, cash flows and/or prospects.

---

## Modified: 2024 Form 10-K | 52

**Key changes:**

- Reworded sentence: "Table of Contents Table of Contents These ratemaking proceedings include decisions about major programs in which SDG&E and SoCalGas make investments under an approved CPUC framework, such as wildfire mitigation and pipeline and storage integrity and safety enhancement programs, but which investments may remain subject to a CPUC filing or reasonableness review that may result in the disallowance of incurred costs."
- Reworded sentence: "Even if recoverable, simultaneously investing in support of necessary safety and reliability and the regulatory requirements and demand for reliable lower-carbon energy may negatively impact the affordability of SDG&E's and SoCalGas' customer rates and their and Sempra's results of operations, financial condition, cash flows and/or prospects."
- Reworded sentence: "In October 2024, the CPUC issued an FD to modify the CCM."
- Reworded sentence: "The FERC regulates electric transmission rates, the transmission and wholesale sales of electricity in interstate commerce, transmission access, the rates of return on investments in electric transmission assets, and other similar matters involving SDG&E."

**Prior (2024):**

Rates and Other Financial Matters The CPUC regulates SDG&E's and SoCalGas' customer rates, except for SDG&E's electric transmission rates that are regulated by the FERC, and conditions of service. The CPUC also regulates SDG&E's and SoCalGas' sales of securities, rates of return, capital structure, rates of depreciation, long-term resource procurement and other financial matters in various ratemaking proceedings. The CPUC periodically approves SDG&E's and SoCalGas' customer rates based on authorized capital expenditures, operating costs, including income taxes, and an authorized rate of return on investments while incorporating a risk-based decision-making framework, as well as certain settlements with third parties. The outcome of ratemaking proceedings can be affected by various factors, many of which are not in our control, including the level of opposition by intervening parties; any rejection by the CPUC of settlements with third parties; increasing levels of regulatory review; changes in the political, regulatory, or legislative environments; and the opinions of regulators, customers and other stakeholders. These ratemaking proceedings include decisions about major programs in which SDG&E and SoCalGas make investments under an approved CPUC framework, such as wildfire mitigation and pipeline and storage integrity and safety enhancement programs, but which investments may remain subject to a CPUC filing or reasonableness review based on potentially unclear standards or other factors as described above that may result in the disallowance of incurred costs. SDG&E and SoCalGas also may be required to make investments and incur other costs to comply with proposed legislative and regulatory requirements and initiatives, including those related to California's climate goals and policies, and the ability to recover these costs and investments may depend on the final form of the legislative or regulatory requirements and the corresponding ratemaking mechanisms. Recovery may be delayed and/or insufficient if the applicable ratemaking mechanism involves a significant time lag between when costs are incurred and when those costs are recovered in rates or if there are material differences between the authorized costs embedded in rates (which are set on a prospective basis) and the actual costs incurred. Delays may also result from the administrative process, or the CPUC may deny recovery altogether on the basis that costs were not reasonably or prudently incurred or for other reasons, such as customer affordability. Even if recoverable, investing to support the regulatory requirements and demand for lower carbon, reliable energy in California and in necessary safety and reliability at the same time may negatively impact the affordability of SDG&E's and SoCalGas' customer rates and their and Sempra's results of operations, financial condition, cash flows and/or prospects. In addition, a CPUC cost of capital proceeding every three years determines a utility's authorized capital structure and return on rate base, and the CCM applies in the interim years and considers changes in the cost of capital based on changes in interest rates for each 12-month period ending September 30 (the measurement period), subject to regulatory approval. Alternatively, each of SDG&E and SoCalGas is permitted to file a cost of capital application to have its cost of capital determined in lieu of the CCM in an interim year in which an extraordinary or catastrophic event materially impacts its cost of capital and affects utilities differently than the market as a whole. Any such rate change due to a downward trigger of the CCM or the denial by the CPUC of an automatic upward trigger of the CCM could have a material adverse effect on Sempra's and the applicable utility's results of operations, financial condition, cash flows and/or prospects. We discuss the CCM in "Part I - Item 1. Business - Ratemaking Mechanisms - Sempra California - Cost of Capital Proceedings," and in Note 4 of the Notes to Consolidated Financial Statements. The FERC regulates electric transmission rates, the transmission and wholesale sales of electricity in interstate commerce, transmission access, the rates of return on investments in electric transmission assets, and other similar matters involving

**Current (2025):**

Table of Contents Table of Contents These ratemaking proceedings include decisions about major programs in which SDG&E and SoCalGas make investments under an approved CPUC framework, such as wildfire mitigation and pipeline and storage integrity and safety enhancement programs, but which investments may remain subject to a CPUC filing or reasonableness review that may result in the disallowance of incurred costs. SDG&E and SoCalGas also may be required to make investments and incur other costs to comply with proposed legislative and regulatory requirements and initiatives, including those related to California's climate goals and policies, and the ability to recover these costs and investments may depend on the final form of the legislative or regulatory requirements and the corresponding ratemaking mechanisms. Recovery may be delayed and/or insufficient if the applicable ratemaking mechanism involves a significant time lag between when costs are incurred and when those costs are recovered in rates or if there are material differences between the authorized costs embedded in rates (which are set on a prospective basis) and the actual costs incurred. Delays may also result from the administrative process, or the CPUC may deny recovery altogether on the basis that costs were not reasonably or prudently incurred or for other reasons, such as customer affordability. Even if recoverable, simultaneously investing in support of necessary safety and reliability and the regulatory requirements and demand for reliable lower-carbon energy may negatively impact the affordability of SDG&E's and SoCalGas' customer rates and their and Sempra's results of operations, financial condition, cash flows and/or prospects. A CPUC cost of capital proceeding every three years determines a utility's authorized capital structure and authorized return on rate base. The CCM applies in the interim years and considers changes in the cost of capital based on changes in interest rates based on the applicable utility bond index published by Moody's (CCM benchmark rate) for each 12-month period ending September 30 (the measurement period). Alternatively, each of SDG&E and SoCalGas is permitted to file a cost of capital application to have its cost of capital determined in lieu of the CCM in an interim year in which an extraordinary or catastrophic event materially impacts its cost of capital and affects utilities differently than the market as a whole. In October 2024, the CPUC issued an FD to modify the CCM. The FD updates the upward or downward adjustment to authorized ROE, if the CCM is triggered, from 50% to 20% of the change in the benchmark rate during the measurement period. Any further rate changes due to a downward trigger of the CCM or the denial by the CPUC of an automatic upward trigger of the CCM could have a material adverse effect on Sempra's and the applicable utility's results of operations, financial condition, cash flows and/or prospects. We discuss the CCM in "Part I - Item 1. Business - Ratemaking Mechanisms - Sempra California - Cost of Capital Proceedings," and in Note 4 of the Notes to Consolidated Financial Statements. The FERC regulates electric transmission rates, the transmission and wholesale sales of electricity in interstate commerce, transmission access, the rates of return on investments in electric transmission assets, and other similar matters involving SDG&E. These ratemaking mechanisms are subject to many risks similar to those described above regarding the CPUC ratemaking proceedings. In particular, SDG&E's authorized TO5 settlement provided for an ROE of 10.60%, consisting of a base ROE of 10.10% plus the California ISO adder. In December 2024, the FERC issued an order, which SDG&E has appealed, finding that SDG&E is not eligible for the California ISO adder and that the TO5 adder refund provision has been triggered, requiring SDG&E to refund customers the California ISO adder retroactively from June 1, 2019. In October 2024, SDG&E submitted its TO6 filing to the FERC, requested to be effective January 1, 2025, and subject to refund. SDG&E's TO6 filing proposes, among other items, an increase to SDG&E's currently authorized base ROE from 10.10% to 11.75% plus the California ISO adder, for a total ROE of 12.25%. In December 2024, the FERC accepted SDG&E's TO6 filing but suspended the effective date to June 1, 2025 and disallowed the inclusion of the California ISO adder, which SDG&E has appealed. Any unfavorable outcome in these proceedings, such as the discontinuation of the California ISO adder or not being successful in our appeal of the FERC decision finding that the TO5 adder refund provision was triggered, could have a material adverse effect on SDG&E's and Sempra's results of operations, financial condition, cash flows and/or prospects. CPUC Authority Over Operational Matters Our operations are subject to CPUC rules (and similar FERC rules), commonly referred to as "affiliate rules," relating to transactions among SDG&E, SoCalGas and other Sempra businesses. These rules primarily impact market transactions and marketing activities involving transmission supply and capacity, including sales or other trades of natural gas or electricity within or among SDG&E and SoCalGas and Sempra and its covered affiliates. Noncompliance with these rules, as well as any changes to these rules or their interpretations or additional more restrictive CPUC or FERC rules related to transactions with affiliates, could materially adversely affect our operations and, in turn, our results of operations, financial condition, cash flows and/or prospects. Additionally, the CPUC has regulatory authority related to safety standards and practices, reliability and planning, competitive conditions and a wide range of other operational matters, including citation and enforcement programs concerning matters such as safety activity, disconnection and billing practices, resource adequacy and environmental compliance. Many of these standards and citation and enforcement programs are becoming more stringent and could subject a utility to significant penalties and fines, as well as higher operating costs. The CPUC conducts reviews and audits of the matters under its authority and may launch

---

## Modified: Settlement provisions contained in the forward sale agreements we may enter into in connection with our ATM program subject us to certain risks.

**Key changes:**

- Reworded sentence: "In November 2024, Sempra established an ATM program, which we discuss in Note 12 of the Notes to Consolidated Financial Statements."

**Prior (2024):**

The counterparties to the November 2023 forward sale agreements Sempra entered into in connection with its common stock offering that we discuss in Note 14 of the Notes to Consolidated Financial Statements (collectively, the forward purchasers) have the right to accelerate their respective forward sale agreements (or, in certain cases, the portion thereof that they determine is affected by the relevant event) and require us to physically settle such forward sale agreements on a date specified by the forward purchasers if, among other things and subject to a prior notice requirement: ▪they are unable to establish, maintain or unwind their hedge position with respect to the forward sale agreements; ▪they determine that they are unable to continue to borrow in a commercially reasonable manner a sufficient number of shares of our common stock or that they would incur a rate that is greater than the cost to borrow shares specified in the forward sale agreements; ▪we declare or pay cash dividends on shares of our common stock before or in an amount that exceeds those prescribed by the forward sale agreements; ▪announcement of certain extraordinary events such as certain mergers and tender offers, insolvency and the delisting of our common stock, or an event occurs that would constitute a hedging disruption or change in law; The forward purchasers' decision to exercise their right to accelerate the forward sale agreements (or, in certain cases, the portion thereof that they determine is affected by the relevant event) and to require us to settle the forward sale agreements will be made irrespective of our interests, including our need for capital. In such cases, we could be required to issue and deliver our common stock under the terms of the physical settlement provisions of the forward sale agreements irrespective of our capital needs, which would result in dilution to our EPS and may adversely affect the market price of our common stock, our preferred stock, any other equity that we may issue and our debt securities. If the forward purchasers do not exercise the right to accelerate the forward sale agreements, we are required to fully settle these forward sale agreements prior to December 31, 2024, which we expect to do entirely by delivery of shares of our common stock under physical settlement. Subject to the provisions of the forward sale agreements, delivery of our shares upon physical or net share settlement of the forward sale agreements will result in dilution to our EPS and may adversely affect the market price of our common stock, our preferred stock and any other equity that we may issue. If we elect to cash or net share settle all or a portion of the shares of our common stock underlying the forward sale agreements, we would expect to issue a substantially lower number of shares than if we settled by physical delivery, but would not receive the cash for the shares that would have otherwise been issued if we settled the entire forward sale agreements by physical delivery and will not derive the same benefits from the standpoint of improving our credit metrics.

**Current (2025):**

In November 2024, Sempra established an ATM program, which we discuss in Note 12 of the Notes to Consolidated Financial Statements. We are permitted to sell shares of our common stock in the ATM program pursuant to forward sale agreements, which grant each counterparty (each a forward purchaser) the right to accelerate its forward sale agreement (or, in certain cases, the portion thereof that the forward purchaser determines is affected by the relevant event) and require us to physically settle the forward sale agreement on a date specified by the forward purchaser if, subject to a prior notice requirement: ▪the forward purchaser determines in its commercially reasonable judgment that it is unable to hedge in a commercially reasonable manner its exposure to the applicable forward sale agreement because insufficient shares of our common stock are made available for borrowing by securities lenders or that, with respect to borrowing such number of shares of our common stock, it would incur a rate that is greater than the borrow cost specified in the forward sale agreement; ▪we declare any dividend, issue or distribution to existing holders of shares of our common stock that constitutes an extraordinary dividend under the forward sale agreement or is payable in (i) cash in excess of specified amounts (unless it is an extraordinary dividend), (ii) securities of another company that we acquire or own (directly or indirectly) as a result of a spin-off or similar transaction or (iii) any other type of securities (other than our common stock), rights, warrants or other assets for payment at less than the prevailing market price; ▪an event (i) is announced that, if consummated, would result in an extraordinary event (including certain mergers and tender offers, our nationalization, our insolvency and the delisting of the shares of our common stock) or (ii) occurs that would constitute a hedging disruption or change in law; ▪an ownership event (as such term is defined in the forward sale agreement) occurs; or ▪certain other events of default, termination events or other specified events occur, including, among other things, a change in law. A forward purchaser's decision to exercise its right to accelerate all or a portion of the settlement of its forward sale agreement and to require us to physically settle the relevant shares will be made irrespective of our interests, including our need for capital.

---

## Modified: We face risks related to increasing activities and projects intended to advance new energy technologies.

**Key changes:**

- Reworded sentence: "We regularly participate in research, development and demonstration projects and other activities designed to develop new technologies in the energy space, including those related to hydrogen, liquefaction, energy storage, microgrids, carbon sequestration, and grid modernization."

**Prior (2024):**

We regularly undertake or become involved in research and development projects and other activities designed to develop new technologies in the energy space, including those related to hydrogen, liquefaction, energy storage, carbon sequestration, grid modernization and others. These activities and projects involve significant employee time, as well as substantial capital resources that may not be recoverable in rates or, with respect to our non-regulated-utility businesses, may not be able to be passed through to customers. We have sought and continue to seek a variety of federal and state funding opportunities for these activities and projects, which can involve significant employee resources and increased compliance requirements with no guarantee that such funding would be received. In addition, the timing to complete these activities and projects is inherently uncertain and may require significantly more time and funding than we initially anticipate. Moreover, many of these technologies are in the early stage of development, and the applicable activities and projects may not be completed or the applicable technologies may not prove economically and technically feasible. If any of these circumstances occurs, we may not receive an adequate or any return on our investment and other resources invested in these activities and our results of operations, financial condition, cash flows and/or prospects could be materially adversely affected.

**Current (2025):**

We regularly participate in research, development and demonstration projects and other activities designed to develop new technologies in the energy space, including those related to hydrogen, liquefaction, energy storage, microgrids, carbon sequestration, and grid modernization. These activities and projects involve significant employee time, as well as substantial capital resources that may not be recoverable in rates or, with respect to our businesses that are not regulated utilities, may not be

---

## Modified: 2024 Form 10-K | 47

**Key changes:**

- Reworded sentence: "Table of Contents Table of Contents practices, emissions fees, taxes, penalties or other obligations or restrictions, may have material negative effects on our operations, costs, corporate planning, and the scope and economics of proposed infrastructure projects or other capital expenditures."
- Reworded sentence: "In particular, legislation and regulation designed to reduce GHG emissions and mitigate climate change are proliferating, as we discuss in "Part I  -  Item 1."

**Prior (2024):**

Table of Contents Table of Contents Environmental and Climate Change Regulation We are subject to extensive federal, state, regional, local and foreign statutes, orders, rules and regulations relating to climate change and environmental protection. To comply with these requirements, we must expend significant capital and employee resources on environmental monitoring, surveillance and other measures to track performance; acquisition and installation of pollution control equipment; mitigation efforts; and emissions fees, which could increase as a result of various factors we may not control, including changing laws and regulations, increased enforcement activities, delays in the renewal and issuance of permits, and changes to the mix of energy we transmit and distribute. In addition, we are generally responsible for hazardous substances and other contamination on and the conditions of our projects and properties, regardless of when these conditions arose and whether they are known or unknown. We have been and may be in the future required to pay environmental remediation costs at former facilities and off-site waste disposal sites where any of our businesses is identified as a PRP under federal, state and local environmental laws. For our regulated utilities, some of these costs may not be recoverable in rates. Failure to comply with environmental laws and regulations may subject us to fines and penalties, including criminal penalties in some cases, and/or curtailment of our operations. Any of these outcomes could materially adversely affect our results of operations, financial condition, cash flows and/or prospects. Increasing international, national, regional, state and local environmental concerns and related changes to the legal and regulatory framework, such as requirements for increased monitoring and surveillance, disclosures on environmental performance, pollution monitoring and control equipment, safety practices, emissions fees, taxes, penalties or other obligations or restrictions, may have material negative effects on our operations, costs, corporate planning, and the scope and economics of proposed infrastructure projects or other capital expenditures. Recently enacted California laws requiring expansive disclosures on GHG emissions and other environmental measures, targets and claims subject us to potential liability for these disclosures and could have other consequences that may be difficult to predict, including negative sentiment from current and potential investors, regulators or other groups. Moreover, these new disclosure requirements may use different reporting frameworks and methodologies, including reporting boundaries, which may increase compliance costs and the risk of compliance failures and may create confusion for stakeholders. In addition, legislation and regulation relating to the control and reduction of GHG emissions and mitigating climate change is proliferating. For example, SB 100 (enacted in 2018) and SB 1020 (enacted in 2022) requires each California electric utility, including SDG&E, to procure at least 50% of its annual electric energy requirements from renewable energy sources by 2026, 60% by 2030, 90% by 2035, and 95% by 2040. State law also requires California's retail electricity supply to be met with a mix of RPS Program-eligible and zero-carbon resources by 2045 without increasing carbon emissions elsewhere in the western grid or allowing resource shuffling, and instructs the CPUC, CEC, CARB and other state agencies to incorporate this requirement into all relevant planning. In addition, the Governor of California signed an executive order establishing a new statewide goal to achieve carbon neutrality as soon as possible, and no later than 2045, and achieve and maintain net negative emissions thereafter. The executive order calls on CARB to address this goal in future scoping plans, which affect several major sectors of California's economy, including transportation, agriculture, development, industrial and others. California has issued new climate initiatives in line with this statewide goal, including two executive orders requiring sales of all passenger vehicles to be zero-emission by 2035. These or other similar new laws and rules may materially restrict our operations, negatively impact demand for our services and/or the energy we transmit and distribute, limit development opportunities, force costly or otherwise burdensome changes to our operations or otherwise materially adversely affect us. Energy Transition Risks The energy transition in California and elsewhere, including decarbonization goals, has introduced uncertainty in long-term investor support, leading some to reduce investment in or divest from our sector. Maintaining investor confidence and attracting capital at a competitive cost will depend in part on demonstrating our progress on our action plan supporting Sempra's aim to have net-zero emissions by 2050 and SDG&E's and SoCalGas' aim to have net-zero emissions by 2045. Our ability to achieve these aims depends on many factors, some of which we do not control, including supportive energy laws, policies and regulatory decisions; development and adoption of alternative fuels; successful research and development efforts focused on low-carbon technologies that are economically and technically feasible; cooperation from our partners, financing sources and commercial counterparties; customer participation in conservation and energy efficiency programs, our ability to execute our planned investments in our infrastructure and our customers' decisions and preferences. Although we have developed interim targets and various plans designed to advance California's GHG emissions and renewable energy mandates and our own energy goals, we may not be successful. We will need to continue to expend capital and employee resources to develop and deploy new technologies and modernize grid systems to meet the demand for lower carbon and reliable energy in California and elsewhere and achieve our climate aspirations and those mandated by applicable authorities, which may not be recoverable in rates or, with respect to our non-regulated-utility

**Current (2025):**

Table of Contents Table of Contents practices, emissions fees, taxes, penalties or other obligations or restrictions, may have material negative effects on our operations, costs, corporate planning, and the scope and economics of proposed infrastructure projects or other capital expenditures. Any of these outcomes could materially adversely affect our results of operations, financial condition, cash flows and/or prospects. In particular, legislation and regulation designed to reduce GHG emissions and mitigate climate change are proliferating, as we discuss in "Part I  -  Item 1. Environmental Matters." California's goals are facing cost pressures and may experience delays or other challenges that could cause the state to modify its laws and rules, resulting in significant uncertainty. These or other similar laws and rules may materially restrict our operations, negatively impact demand for our services and/or the energy we transmit and distribute, limit development opportunities, force costly or otherwise burdensome changes to our operations, negatively impact customer affordability, or otherwise materially adversely affect us. Additionally, the SEC's final rules on climate-related disclosures and California laws requiring expansive disclosures on GHG emissions and other environmental measures, targets and claims could subject us to liability for these disclosures as well as significant compliance costs and could have other consequences that may be difficult to predict, including negative sentiment from current and potential investors, regulators or other groups. These new disclosure requirements may use different reporting frameworks and methodologies, such as reporting boundaries, which may further increase compliance costs and the risk of compliance failures and may create confusion for stakeholders. Moreover, these disclosure requirements could increase the risk that we become subject to climate change lawsuits. Defense costs associated with such litigation could be significant, and any adverse outcome could require substantial capital expenditures or payment of substantial penalties or damages. Although these new disclosure requirements are subject to challenges in pending lawsuits and may change as a result of further agency action, any of these outcomes could materially adversely affect our results of operations, financial condition, cash flows and/or prospects. Other Energy Transition Risks The energy transition in California and elsewhere, including decarbonization goals, has introduced uncertainty in long-term investor support, leading some to reduce investment in or divest from our sector. Maintaining investor confidence and attracting capital at a competitive cost will depend, in part, on demonstrating our ability to address material business risks related to climate and our efforts to help achieve the goals of our consumers and the markets and jurisdictions where we operate. In an effort to maintain a sustainable and durable business risk profile and continue to focus on value creation, Sempra has evaluated and updated its climate aspirations to reflect the changing policy, regulatory, commercial and technological landscape, including stakeholders' evolving focus on reliability, resiliency and affordability and the pace and impact of climate and other public policies. Following this evaluation, Sempra now aims to have net-zero scope 1 and 2 GHG emissions by 2050, with an interim target of 50% scope 1 and 2 GHG emissions reductions by 2035 (this interim target applies to Sempra California and Sempra Infrastructure's Mexico (non-LNG) operations and is relative to a 2019 baseline). While the company no longer has a specific goal to achieve net-zero scope 3 GHG emissions by 2050, the capabilities we are developing through our energy transition action plan could also support the reduction of scope 3 GHG emissions and help meet regulatory, consumer and market demand for lower- and zero-carbon energy. Sempra's, SDG&E's and SoCalGas' abilities to advance their respective net-zero and other climate objectives will depend on many factors, some of which we do not control, including supportive federal and state energy laws, policies, incentives, tax credits and regulatory decisions; cost and affordability considerations; development, commercialization and regulatory acceptance of alternative and lower-carbon energy sources, including cleaner fuels; successful research and development efforts focused on lower carbon technologies that are economically and technically feasible; cooperation from our partners, financing sources and commercial counterparties; customer participation in conservation and energy efficiency programs; our ability to execute our planned investments in our infrastructure; and consumers' decisions and preferences. In addition, forecasting to 2035, 2045 and 2050 is inherently speculative without knowing the trajectory of the energy transition. As a result, although we are dedicated to progress on our climate aims and are continuing to develop capabilities designed to reduce GHG emissions from our own operations as well as to support consumers' and markets' own climate goals, we may not be successful in achieving these objectives. We will need to continue to expend capital and employee resources to develop and deploy new technologies and modernize grid systems to meet the demand for lower carbon and reliable energy in California and elsewhere and achieve our climate aspirations and those mandated by applicable authorities, which may not be recoverable in rates or, with respect to our businesses that are not regulated utilities, may not be able to be passed through to customers. Even if such costs are recoverable, these costs, coupled with necessary safety and reliability investments, may negatively impact the affordability of SDG&E's and SoCalGas' customer rates and, for our businesses that are not regulated utilities, may cause costs to increase to levels that reduce customer demand and growth. SDG&E and SoCalGas, as well as any of our other businesses affected by GHG emissions reduction and mitigation and renewable energy mandates, may also be subject to fines and penalties if mandated goals are not met, and all our businesses could suffer difficulties attracting investors and business partners, reputational harm and other negative effects if we do not meet or if

---

## Modified: Natural gas continues to be the subject of political and public debate, including a desire by some to reduce or eliminate reliance on natural gas as an energy source.

**Key changes:**

- Reworded sentence: "Certain California legislators, regulators and other stakeholders have expressed a desire to limit or eliminate reliance on natural gas as an energy source through increased use of renewable electricity and electrification."
- Reworded sentence: "These actions could have the effect of reducing natural gas use over time, and the combination of reduced load and increasing costs to maintain the gas system could negatively impact affordability for remaining natural gas customers."

**Prior (2024):**

Certain California legislators and other stakeholders have expressed a desire to limit or eliminate reliance on natural gas as an energy source by advocating increased use of renewable electricity and electrification. Reducing methane emissions also has become a major focus of certain local, state and federal agencies, resulting in passed or proposed legislation, regulation, policies and ordinances to prohibit or restrict the use of natural gas in new buildings, appliances and other applications. These actions could have the effect of reducing natural gas use over time. CARB, California's primary regulator for GHG emissions reduction programs, has proposed to reduce natural gas demand through building decarbonization measures (such as zero-emission standards for space and water heaters) or legislation requiring increased renewable electricity generation. Additionally, the CEC's Title 24 requirements mandate that new construction include electric-ready buildings and heat pump technologies beginning in 2023. The CPUC has an ongoing proceeding that seeks to establish a state-wide process to help utilities plan appropriate gas infrastructure portfolios as natural gas usage in the state is expected to change with overall consumption expected to decline. This includes a General Order requiring site-specific approvals for certain gas infrastructure projects. The CPUC may continue to enact measures to reduce natural gas demand (such as more aggressive energy efficiency programs), promote fuel substitution (such as replacement of natural gas appliances with electric appliances), and order other changes (such as its decision to eliminate gas line extension allowances for new applications submitted on or after July 1, 2023). A substantial reduction in or the elimination of natural gas use in California without adequate recovery of investments could result in impairment of some or all of SoCalGas' and SDG&E's natural gas infrastructure assets if they were not permitted to be repurposed for alternative fuels, were required to be depreciated on an accelerated basis or were to become stranded, which could have a material adverse effect on SoCalGas', SDG&E's and Sempra's results of operations, financial conditions, cash flows and/or prospects.

**Current (2025):**

Certain California legislators, regulators and other stakeholders have expressed a desire to limit or eliminate reliance on natural gas as an energy source through increased use of renewable electricity and electrification. Reducing methane emissions also has become a major focus of certain local, state and federal agencies, resulting in passed or proposed legislation, regulation, policies and ordinances to prohibit or restrict the use of natural gas in new buildings, appliances and other applications. These actions could have the effect of reducing natural gas use over time, and the combination of reduced load and increasing costs to maintain the gas system could negatively impact affordability for remaining natural gas customers. In February 2017, the CPUC opened proceeding SB 380 OII relating to SoCalGas to determine the feasibility of minimizing or eliminating the use of the Aliso Canyon natural gas storage facility while still maintaining energy and electric reliability for the region, including analyzing alternative means for meeting or avoiding the demand for the facility's services if it were eliminated. In December 2024, the CPUC approved an FD in the SB 380 OII finding that the Aliso Canyon natural gas storage facility is currently necessary for natural gas and electric reliability and affordable rates and closed the OII. Among other things, and subject to future CPUC biennial reviews and potential additional proceedings, the FD authorizes the Aliso Canyon natural gas storage facility to continue operating and sets the maximum working natural gas storage level at 68.6 bcf. If the Aliso Canyon natural gas storage facility were to be permanently closed or if future cash flows from its operation were otherwise insufficient to recover its carrying value, we would record an impairment of the facility, which could be material, we could incur materially higher than expected operating costs and/or be required to make material additional capital expenditures (any or all of which may not be recoverable in rates), and natural gas reliability and electric generation could be jeopardized. Any such outcome could have a material adverse effect on SoCalGas' and Sempra's results of operations, financial condition, cash flows and/or prospects. We discuss proceeding SB 380 OII in Note 15 of the Notes to Consolidated Financial Statements.

---

## Modified: We face risks from increased competition.

**Key changes:**

- Added sentence: "We are exposed to additional competitive risks in connection with our LNG projects."
- Added sentence: "Our ability to reach a final investment decision for each development project and, if a positive decision is made and a project is completed, the overall success of the project depends in part on global energy markets, which can increase competition for global LNG demand in a number of ways."
- Added sentence: "In general, depressed natural gas and LNG prices in the markets intended to be served by any of our projects, including as a result of global oil prices and their associated current and forward projections or other factors, could reduce the pricing and cost advantages of exporting natural gas and LNG produced in North America, which could lead to decreased demand from our projects."
- Added sentence: "Although demand for natural gas is currently strong due to increased focus on energy security and climate aims, a reduction in natural gas demand could also occur from higher penetration of alternative fuels in new power generation, reduced economic activity in general, or as a result of calls by some to limit or eliminate global reliance on natural gas."
- Added sentence: "Further, because LNG projects take a number of years to develop and construct, it is difficult to match current and expected demand with the projected supply from projects under development."

**Prior (2024):**

The markets in which we operate are characterized by numerous capable competitors, many of which have extensive and diversified development and/or operating experience domestically and internationally and financial resources similar to or greater than ours. In particular, the natural gas pipeline, storage and LNG market segments recently have been characterized by strong and increasing competition for winning new development projects and acquiring existing assets. These competitive factors could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects.

**Current (2025):**

The markets in which we operate are characterized by numerous capable competitors, many of which have extensive and diversified development and/or operating experience domestically and internationally and financial resources similar to or greater than ours. In particular, the natural gas pipeline, storage and LNG market segments recently have been characterized by strong and increasing competition for winning new development projects and acquiring existing assets. These competitive factors could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects. We are exposed to additional competitive risks in connection with our LNG projects. Our ability to reach a final investment decision for each development project and, if a positive decision is made and a project is completed, the overall success of the project depends in part on global energy markets, which can increase competition for global LNG demand in a number of ways. In general, depressed natural gas and LNG prices in the markets intended to be served by any of our projects, including as a result of global oil prices and their associated current and forward projections or other factors, could reduce the pricing and cost advantages of exporting natural gas and LNG produced in North America, which could lead to decreased demand from our projects. Although demand for natural gas is currently strong due to increased focus on energy security and climate aims, a reduction in natural gas demand could also occur from higher penetration of alternative fuels in new power generation, reduced economic activity in general, or as a result of calls by some to limit or eliminate global reliance on natural gas. Further, because LNG projects take a number of years to develop and construct, it is difficult to match current and expected demand with the projected supply from projects under development. Moreover, shifts in U.S. and foreign energy policy could impact supply, demand and other matters critical to LNG projects, such as permitting and other approval processes. Both the U.S. and Mexico held federal elections in 2024, and LNG exports may face increased costs under the new Administrations due to changing macroeconomic and geopolitical conditions. Also, the DOE has recently implemented changes to its approach to requests for extensions of time to commence LNG exports under existing non-FTA approvals. These changes and other market factors such as oil prices could delay or hamper the development of U.S. LNG export facilities and make LNG projects in other parts of the world more feasible and competitive with LNG projects in North America, thus increasing supply and competition for global LNG demand. Any of these occurrences could impact competition and prospects for developing LNG projects and negatively affect the performance and prospects of any of our projects that are or become operational, which could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects.

---

*Data sourced from SEC EDGAR. Last updated 2026-05-10.*