DHI: 10-K Risk Factor Changes

2023 vs 2022  ·  SEC EDGAR  ·  2026-10-16
Other years: 2025 vs 2024 · 2024 vs 2023
⚠ AI Risk Brief Interpretation layer — deterministic data below

DHI's top five risk factors shifted modestly; supply chains and labor constraints remain most pressing.

✓ Deterministic extraction — no AI-generated data

Classification is based on semantic text similarity scoring and may include approximations. “No match” means no high-confidence textual match was found — not necessarily that a section was removed.

0
New Risks
0
Removed
5
Modified
20
Unchanged
🟡 Modified Disclosure change6/10

Supply shortages and other risks related to acquiring land, building materials and skilled labor and obtaining regulatory approvals could increase our costs and delay deliveries.

high match confidence

Sentence-level differences:

  • Reworded sentence: "The homebuilding and lot development industries have from time to time experienced significant difficulties that can affect the cost or timing of construction, including: • difficulty in acquiring land suitable for residential building at affordable prices in locations where our potential customers want to live; • delays in receiving the necessary approvals from municipalities or other government agencies; • shortages of qualified subcontractors; • reliance on local subcontractors, manufacturers, distributors and land developers who may be inadequately capitalized; • shortages of materials; and • significant increases in the cost of materials, particularly increases in the price of lumber, drywall and cement, which are significant components of home construction costs."

Current (2023):

View prior text (2022)

The homebuilding and lot development industries have from time to time experienced significant difficulties that can affect the cost or timing of construction, including:

  • difficulty in acquiring land suitable for residential building at affordable prices in locations where our potential customers want to live;
  • shortages of qualified subcontractors;
  • reliance on local subcontractors, manufacturers, distributors and land developers who may be inadequately capitalized;
  • shortages of materials; and
  • significant increases in the cost of materials, particularly increases in the price of lumber, drywall and cement, which are significant components of home construction costs.

During fiscal 2021 and 2022, we have experienced multiple disruptions in our supply chain, which have resulted in shortages of certain building materials and tightness in the labor market. This has caused our construction cycle to lengthen and costs of building materials to increase. If shortages and cost increases in building materials and tightness in the labor market persist for a prolonged period of time, our profit margins could be adversely impacted if we are unable to offset cost increases by increasing the selling price of our homes.

In addition, tariffs, duties and/or trade restrictions imposed or increased on imported materials and goods that are used in connection with the construction and delivery of our homes, including steel, aluminum and lumber, may raise our costs for these items or for the products made with them. These factors may cause construction delays or cause us to incur more costs building our homes.

🟡 Modified Public health issues such as a major epidemic or pandemic could adversely affect our business and financial results. 🔒
🟡 Modified Our business and financial results could be adversely affected by significant inflation, higher interest rates or deflation. 🔒
🟡 Modified Our homebuilding, rental and land development operations are cyclical and affected by changes in economic, real estate or other conditions that could adversely affect our business and financial results. 🔒

And 1 more changes in the full comparison.

4 changes in this historical filing

The complete historical comparison (2023 vs 2022) is available on the Pro plan.

Get Pro access Already a Pro subscriber? View full diff →